NYC Prototypes
Skip to main content
BBL 1000300005 · BIN 1000854 · Manhattan · Block 00030, Lot 0005

46 WATER STREET

Article 320Pathway source: CBL PDF row · CP0_article_320_2024CBL revision date 2026-06-16Open CBL source PDF
Buildings on lot 1
← Buildings

Article 320 · numerical caps & computed exposure

How this is computed
PeriodOccupancyGFACapActualDeltaEst. penaltyStatusMethodology
2024-29------
Unresolved
no_ll84_row
v1.0
2030-34------
Unresolved
no_ll84_row
v1.0

Cap = Σ (occupancy_coefficient × gross_floor_area) using DOB LL97 rules; actual GHG is the most recent LL84 filing. Delta is positive when actual exceeds cap. Estimated penalty is DOB's public $268/tCO2e × delta with a 30-day grace applied via penalty_estimate_usd.

Enforcement events (all DOB + ECB + OATH data cross-linked to this BBL)

Open on enforcement page →
0 LL97-specific events · 27 building-scoped context events.
DOB violation filed0 LL97 · 7 scoped
ECB summons issued0 LL97 · 3 scoped
Safety context record0 LL97 · 17 scoped
StageEvent dateViolationSeverityStatusPenaltySource
ECB summons issuedbuilding-scoped2026-04-20
Local Law
28-302.5 FAILURE TO FILE AN AMENDED REPORT ACCEPTABLE TO THIS DEPARTMENT INDICA
ECB #37036446J
CLASS - 2ACTIVE$3,1256bgk-3dad
ECB summons issuedbuilding-scoped2026-01-08
Construction
28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER
ECB #39173144H
CLASS - 2ACTIVE$6256bgk-3dad
DOB violation filedbuilding-scoped2026-01-08
C-CONSTRUCTION OTHER OPTIONAL
FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. OBSERVED AT EXPOSURE 1 MULTIPLE DEFECTED WINDOWS METAL CORROSIONS, BROKEN GLASS 3 FLOOR SOFFIT, BROKEN GLASS/MISSING PANE AT ENTRANCE. BROKEN PANE EXPOSURE 2. MULTIPLE CORROSIONS ON WINDOWS AT EXPOSURE 3. EXPOSURE 4 SPALLING BRICKS. REMEDY: REPAIR AND/OR REPLACE
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9
Safety context recordbuilding-scoped2026-01-08
FTF-PL-PER
Cycle 2, Sub-cycle A (premises is in Community District 1)
-Dismissed-855j-jady
Safety context recordbuilding-scoped2025-11-14
LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
-Active-855j-jady
DOB violation filedbuilding-scoped2025-11-14
LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9
Safety context recordbuilding-scoped2025-08-29
FTF-VT-CAT1-CO
Violation Issued-Failure To File 2024 Cat1 Test Report
-Active-855j-jady
Safety context recordbuilding-scoped2025-08-29
FTF-VT-CAT1-CO
Violation Issued-Failure To File 2024 Cat1 Test Report
-Active-855j-jady
Safety context recordbuilding-scoped2025-08-29
FTF-VT-PER-CO
Violation Issued-Failure To File 2024 Periodic Inspection Report
-Active-855j-jady
Safety context recordbuilding-scoped2025-08-29
FTF-VT-PER-CO
Violation Issued-Failure To File 2024 Periodic Inspection Report
-Active-855j-jady
Safety context recordbuilding-scoped2025-08-29
FTF-VT-CAT1-CO
Violation Issued-Failure To File 2024 Cat1 Test Report
-Active-855j-jady
Safety context recordbuilding-scoped2025-08-29
FTF-VT-PER-CO
Violation Issued-Failure To File 2024 Periodic Inspection Report
-Active-855j-jady
DOB violation filedbuilding-scoped2025-02-04
C-CONSTRUCTION OTHER OPTIONAL
FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. NOTE: AT TIME OF INSPECTION OBSERVED AT EXP #1 MULTIPLE AREAS OF SPALLING CRACKED MOTAR JOINTS AT LINTELS EXPOSURE #4 OBSERVED MULTIPLE BRICKS FACE DESTROYED/SPALLING BRICK FACE. REMEDY: REPAIR OR REPLACE
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9
Safety context recordbuilding-scoped2024-09-23
LBLVIO
Violation Issued-Failure To File 2023 External Low Pressure Inspection Report
-Active-855j-jady
DOB violation filedbuilding-scoped2024-09-23
LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9
Safety context recordbuilding-scoped2024-09-11
FTF-VT-CAT1-CO
Violation Issued-Failure To File 2023 Cat1 Test Report
-Active-855j-jady
Safety context recordbuilding-scoped2024-09-11
FTF-VT-PER-CO
Violation Issued-Failure To File 2023 Periodic Inspection Report
-Active-855j-jady
Safety context recordbuilding-scoped2024-09-11
FTF-VT-CAT1-CO
Violation Issued-Failure To File 2023 Cat1 Test Report
-Active-855j-jady
Safety context recordbuilding-scoped2024-09-11
FTF-VT-CAT1-CO
Violation Issued-Failure To File 2023 Cat1 Test Report
-Active-855j-jady
Safety context recordbuilding-scoped2024-09-11
FTF-VT-PER-CO
Violation Issued-Failure To File 2023 Periodic Inspection Report
-Active-855j-jady
Safety context recordbuilding-scoped2024-09-11
FTF-VT-PER-CO
Violation Issued-Failure To File 2023 Periodic Inspection Report
-Active-855j-jady
DOB violation filedbuilding-scoped2024-06-23
EARCX-FAILURE TO SUBMIT EER NONE
FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2023)
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9
Safety context recordbuilding-scoped2024-06-23
FTF-EN-EARCX
-Active-855j-jady
DOB violation filedbuilding-scoped2024-03-12
C-CONSTRUCTION OTHER OPTIONAL
.PARTIAL VACATE ORDER@ NORTH ELEV. (PEARL ST.),EXPOSURE#3DETERIORATED CONCRETE BALCONIES SLAB AT MULTPLE LOCATIONS.THESE CONDITIONS HAVE THERFORE MADE THE ENTIRE BALCONIES AT NORTH ELEVATION(UNABLE TO BE OCCUPIED.REMEDY:VACATE ALL FACADE BALCONIES AT NORTH ELEVATION
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9
Safety context recordbuilding-scoped2024-01-26
FISPHAZ
CYCLE 9B UNSAFE REPORT FILED
-Active-855j-jady
DOB violation filedbuilding-scoped2024-01-26
FISPHAZ-HAZARDOUS CONDITION (FACADE) FACADE REQUIRED
CYCLE 9B UNSAFE REPORT FILED
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9
ECB summons issuedbuilding-scoped2024-01-16
Local Law
28-302.5 FAILURE TO FILE AN AMENDED REPORT ACCEPTABLE TO THIS DEPARTMENT INDICA
ECB #37026327H
CLASS - 2ACTIVE$1,2506bgk-3dad

Records are the union of DOB Violations (3h2n-5cm9), ECB (6bgk-3dad), Safety Violations (855j-jady), OATH Hearings (jz4z-kudi), and OATH Trials (y3hw-z6bm) that we could link back to this BBL via BIN or address parsing. Events not tagged LL97-specific are shown as building-scoped context. See methodology · enforcement linking.

Fields we cannot show here (internal DOB data not yet public)

Processing lifecycle

DOB's internal BEAM system tracks per-building compliance stages, RCE / decarbonization plans, and mitigation credits. Those fields are not yet published as an open dataset. When DOB releases them, this product will show them here without a schema migration. Until then, the following are known gaps for this building:

  • Assessed penalty (vs theoretical)
    Actual penalty DOB assessed against a building, distinct from the theoretical over-cap exposure computed from LL84 emissions.
    Simulated · internal DOB data not yet public
    Best-effort shadow field: ecb_summons_issued
    Public release status: announced_not_yet_released
  • Audit assignment
    Buildings selected by DOB for LL97 filing audit and the audit stage.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Audit outcome
    Result of an LL97 audit (accepted / correction ordered / penalty referred).
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Extension flag
    Whether a per-building filing was accepted under a filing extension (June 30 grace or BEAM extension to August 29).
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Filing received date
    Timestamp DOB received a per-building LL97 compliance filing.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Good-faith effort application
    Whether an owner has applied for a good-faith effort determination and its status.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Mediated resolution application
    Application for the LL97 mediated resolution process and its outcome.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Notice of deficiency status
    Whether a notice of deficiency has been issued for a building and its current stage.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Per-building filing status
    Filing status for each covered BBL/BIN combination (filed / late / non-filed / exempt) as tracked in DOB's BEAM system.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Pre-OATH correspondence
    DOB correspondence with owners before an OATH matter is opened (notice of deficiency, cure letters).
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • RDP attestation
    Registered Design Professional attestation attached to each per-building compliance filing.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • RECs / offsets claimed
    Renewable Energy Credits and beneficial-use offsets claimed to reduce reported emissions.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • 60-day cure window
    The 60-day cure window state for a building under LL97 enforcement (open / cured / expired).
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
Every number on this page traces back to a Socrata dataset row or a CBL PDF revision. Where DOB does not publish a computable field (pathway, internal BEAM stage, compliance decision), we say so on the record instead of hiding the gap. See methodology.