5 BEEKMAN STREET
CP0_article_320_2024CBL revision date 2026-06-16Open CBL source PDFArticle 320 · numerical caps & computed exposure
How this is computed| Period | Occupancy | GFA | Cap | Actual | Delta | Est. penalty | Status | Methodology |
|---|---|---|---|---|---|---|---|---|
| 2024-29 | R-2(high) | 158,910 sqft | - | - | - | - | Unresolved no_ll84_row | v1.0 |
| 2030-34 | R-2(high) | 158,910 sqft | - | - | - | - | Unresolved no_ll84_row | v1.0 |
Cap = Σ (occupancy_coefficient × gross_floor_area) using DOB LL97 rules; actual GHG is the most recent LL84 filing. Delta is positive when actual exceeds cap. Estimated penalty is DOB's public $268/tCO2e × delta with a 30-day grace applied via penalty_estimate_usd.
LL84 GHG emissions history
Actual tCO2e reported to LL84 by report year. Each bar links to the raw LL84 row identifier under the chart for auditability.
| Year | Property type | GHG | Property GFA | Site EUI | Source EUI | ES score | Source |
|---|---|---|---|---|---|---|---|
| 2021 | Hotel | 2,458.5 tCO2e | 313,980 sqft | 126.8 | 225.9 | 2 | 7x5e-2fxh / 6232545 |
| 2022 | Hotel | 3,037.7 tCO2e | 313,980 sqft | 148.1 | 256.3 | 1 | 5zyy-y8am / 6232545 |
| 2023 | Hotel | 3,360.2 tCO2e | 313,980 sqft | 141.8 | 248.6 | 1 | 5zyy-y8am / 6232545 |
| 2024 | Multifamily Housing | - | 158,910 sqft | - | - | - | 5zyy-y8am / 56132092 |
Enforcement events (all DOB + ECB + OATH data cross-linked to this BBL)
Open on enforcement page →| Stage | Event date | Violation | Severity | Status | Penalty | Source |
|---|---|---|---|---|---|---|
| ECB summons issuedbuilding-scoped | 2026-05-20 | Construction BC 3301.2,27-1009(A) FAIL TO SAFEGUARD PERS/PROPERTY AFFECTED BY CONSTRUCTION OP ECB #39554379L | CLASS - 1 | ACTIVE | $10,000 | 6bgk-3dad |
| DOB violation filedbuilding-scoped | 2026-01-29 | LANDMK-LANDMARK NONE | - | V-DOB VIOLATION - ACTIVE | - | 3h2n-5cm9 |
| DOB violation filedbuilding-scoped | 2025-08-01 | C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER.AS NOTED I OBS ERVED ON EXP1,3,&4 ERODED AND SPALLING MASONRY AT MULTIPLE LOCATIONS O N SEVERAL FLOORS.REMEDY:REPAIR AND/OR REPLACE ALL DAMAGED,DEFECTIVE MA SONRY | - | V-DOB VIOLATION - ACTIVE | - | 3h2n-5cm9 |
| DOB violation filedbuilding-scoped | 2025-08-01 | C-CONSTRUCTION OTHER OPTIONAL EWO DUE TO IMMEDIATLY HAZARD CONDITIONS ON EXP 1,3,4. OBSERVD SPALLIN, ERODING MASONRY @ MULTIPLE LOCATION & FLOORS. UNSAFE FISP FILING ON 8/23/24 PER PE/RA & INADEQUATE/INCOMPLETE SAFETY MEASUREOBSERVD ON 8/1/25. REMEDY:TAKE & PROVIDE SAFETY MEASURES TO SECURE THE PUBLIC SAFETY ON EXP 1,3 & 4 ELEV EAST, NORTH & WEST INSTALL SIDEWALK SHED | - | V-DOB VIOLATION - ACTIVE | - | 3h2n-5cm9 |
| DOB violation filedbuilding-scoped | 2025-08-01 | C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER.AS NOTED AT TI ME OF INSPECTION,I OBSERVED ON EXP1 LOOSE MATERIAL FLASHING ON EAST EL EV 14TH FLOOR.EXP4 NORTH ELEV DEFECTIVE,SPALLING MASONRY BEAM ON 53RD FLOOR.ROOF SPALLING,CRACKS IN MASONRY BEAMS AND COLUMNS.REMEDY:REPAIR AND/OR REPLACE ALL DEFECTIVE DAMAGE FACADE | - | V-DOB VIOLATION - ACTIVE | - | 3h2n-5cm9 |
| ECB summons issuedbuilding-scoped | 2025-08-01 | Construction BC 3307.6,27-1021 SIDEWALK SHED DOES NOT MEET CODE SPECIFICATIONS ECB #35718338H | CLASS - 2 | RESOLVE | $0 | 6bgk-3dad |
| Safety context recordbuilding-scoped | 2024-08-23 | FISPHAZ CYCLE 9B UNSAFE REPORT FILED | - | Active | - | 855j-jady |
| DOB violation filedbuilding-scoped | 2024-08-23 | FISPHAZ-HAZARDOUS CONDITION (FACADE) FACADE REQUIRED CYCLE 9B UNSAFE REPORT FILED | - | V-DOB VIOLATION - ACTIVE | - | 3h2n-5cm9 |
| Safety context recordbuilding-scoped | 2024-06-23 | FTF-EN-EARCX | - | Active | - | 855j-jady |
| DOB violation filedbuilding-scoped | 2024-06-23 | EARCX-FAILURE TO SUBMIT EER NONE FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2023) | - | V-DOB VIOLATION - ACTIVE | - | 3h2n-5cm9 |
Records are the union of DOB Violations (3h2n-5cm9), ECB (6bgk-3dad), Safety Violations (855j-jady), OATH Hearings (jz4z-kudi), and OATH Trials (y3hw-z6bm) that we could link back to this BBL via BIN or address parsing. Events not tagged LL97-specific are shown as building-scoped context. See methodology · enforcement linking.
Data quality flags
- default_value_reportedSee methodology for the exact definition of this flag; behavior may vary by pathway or period.
Full flag catalog: methodology · data quality flags
Fields we cannot show here (internal DOB data not yet public)
Processing lifecycleDOB's internal BEAM system tracks per-building compliance stages, RCE / decarbonization plans, and mitigation credits. Those fields are not yet published as an open dataset. When DOB releases them, this product will show them here without a schema migration. Until then, the following are known gaps for this building:
- Simulated · internal DOB data not yet publicAssessed penalty (vs theoretical)Actual penalty DOB assessed against a building, distinct from the theoretical over-cap exposure computed from LL84 emissions.Best-effort shadow field:
ecb_summons_issuedPublic release status: announced_not_yet_released - Simulated · internal DOB data not yet publicAudit assignmentBuildings selected by DOB for LL97 filing audit and the audit stage.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicAudit outcomeResult of an LL97 audit (accepted / correction ordered / penalty referred).Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicExtension flagWhether a per-building filing was accepted under a filing extension (June 30 grace or BEAM extension to August 29).Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicFiling received dateTimestamp DOB received a per-building LL97 compliance filing.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicGood-faith effort applicationWhether an owner has applied for a good-faith effort determination and its status.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicMediated resolution applicationApplication for the LL97 mediated resolution process and its outcome.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicNotice of deficiency statusWhether a notice of deficiency has been issued for a building and its current stage.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicPer-building filing statusFiling status for each covered BBL/BIN combination (filed / late / non-filed / exempt) as tracked in DOB's BEAM system.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicPre-OATH correspondenceDOB correspondence with owners before an OATH matter is opened (notice of deficiency, cure letters).Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicRDP attestationRegistered Design Professional attestation attached to each per-building compliance filing.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicRECs / offsets claimedRenewable Energy Credits and beneficial-use offsets claimed to reduce reported emissions.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet public60-day cure windowThe 60-day cure window state for a building under LL97 enforcement (open / cured / expired).Public release status: announced_not_yet_released