139 FRANKLIN STREET
CP0_article_320_2024CBL revision date 2026-06-16Open CBL source PDFArticle 320 · numerical caps & computed exposure
How this is computed| Period | Occupancy | GFA | Cap | Actual | Delta | Est. penalty | Status | Methodology |
|---|---|---|---|---|---|---|---|---|
| 2024-29 | - | 56,384 sqft | - | 168.5 tCO2e | - | - | Unresolved unresolved_occupancy | v1.0 |
| 2030-34 | - | 56,384 sqft | - | 168.5 tCO2e | - | - | Unresolved unresolved_occupancy | v1.0 |
Cap = Σ (occupancy_coefficient × gross_floor_area) using DOB LL97 rules; actual GHG is the most recent LL84 filing. Delta is positive when actual exceeds cap. Estimated penalty is DOB's public $268/tCO2e × delta with a 30-day grace applied via penalty_estimate_usd.
LL84 GHG emissions history
Actual tCO2e reported to LL84 by report year. Each bar links to the raw LL84 row identifier under the chart for auditability.
| Year | Property type | GHG | Property GFA | Site EUI | Source EUI | ES score | Source |
|---|---|---|---|---|---|---|---|
| 2021 | Non-Refrigerated Warehouse | 145.5 tCO2e | 56,384 sqft | 34.3 | 40.7 | 63 | 7x5e-2fxh / 9402748 |
| 2022 | Non-Refrigerated Warehouse | 174.7 tCO2e | 56,384 sqft | 40.8 | 46.8 | 59 | 5zyy-y8am / 9402748 |
| 2023 | Non-Refrigerated Warehouse | 110.4 tCO2e | 56,384 sqft | 24.5 | 30.7 | 74 | 5zyy-y8am / 9402748 |
| 2024 | Non-Refrigerated Warehouse | 168.5 tCO2e | 56,384 sqft | 37.9 | 44.3 | 60 | 5zyy-y8am / 9402748 |
Enforcement events (all DOB + ECB + OATH data cross-linked to this BBL)
Open on enforcement page →| Stage | Event date | Violation | Severity | Status | Penalty | Source |
|---|---|---|---|---|---|---|
| Safety context recordbuilding-scoped | 2026-03-06 | FTP-EN-EGRDEA FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER AD CODE SEC. 28-309.12.3 | - | Active | - | 855j-jady |
| Safety context recordbuilding-scoped | 2026-01-26 | FTC-FC-UNSAFE unsafe report filed | - | Waived - Pending Dismissal | - | 855j-jady |
| DOB violation filedbuilding-scoped | 2026-01-14 | C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER. OBSERVED BROKEN/CRACKED WINDOWS ON ALL EXPOSURE. ON EXPOSURE 2, HAIRLINE CRACK OBSERVED. ALSO LARGE VERTICAL CRACK ON EXPOSURE 4 AT PARAPET LEVEL REMEDY: REPAIR AND OR REPLACE | - | V-DOB VIOLATION - ACTIVE | - | 3h2n-5cm9 |
| Safety context recordbuilding-scoped | 2026-01-08 | FTF-PL-PER Cycle 2, Sub-cycle A (premises is in Community District 1) | - | Active | - | 855j-jady |
| Safety context recordbuilding-scoped | 2025-12-08 | FTF-EN-LL97320 | - | Active | - | 855j-jady |
| Safety context recordbuilding-scoped | 2025-10-10 | FTC-VT-PER-CO Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction | - | Active | - | 855j-jady |
| DOB violation filedbuilding-scoped | 2025-08-04 | C-CONSTRUCTION OTHER OPTIONAL FTM BLDG IN A CODE COMPLIANT MANNER, OBSERVED HAIRLINE CRACKS ON EXPOSURE 2 EAST ELEVATION ALSO MULTIPLE CRACKED WINDOWS WITH SAFETY WIRE ON THE SAME EXPOSURE. REMEDY: REPAIR AND OR REPLACE | - | V-DOB VIOLATION - ACTIVE | - | 3h2n-5cm9 |
| DOB violation filedbuilding-scoped | 2025-08-04 | C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN BUILDING IN CODE COMPIANT. OBSERVED HAIRLINE CRACKS ON EXPOSURE 1 EAST ELEVATION. ALSO MULTIPLE CRACKED WINDOWS WITH WIRE ON THE SAME EXPOSURE. REMEDY: REPAIR AND OR REPLACE | - | V-DOB VIOLATION - ACTIVE | - | 3h2n-5cm9 |
| Safety context recordbuilding-scoped | 2024-10-25 | FTC-BE-EXT-LP Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device | - | Active | - | 855j-jady |
Records are the union of DOB Violations (3h2n-5cm9), ECB (6bgk-3dad), Safety Violations (855j-jady), OATH Hearings (jz4z-kudi), and OATH Trials (y3hw-z6bm) that we could link back to this BBL via BIN or address parsing. Events not tagged LL97-specific are shown as building-scoped context. See methodology · enforcement linking.
Fields we cannot show here (internal DOB data not yet public)
Processing lifecycleDOB's internal BEAM system tracks per-building compliance stages, RCE / decarbonization plans, and mitigation credits. Those fields are not yet published as an open dataset. When DOB releases them, this product will show them here without a schema migration. Until then, the following are known gaps for this building:
- Simulated · internal DOB data not yet publicAssessed penalty (vs theoretical)Actual penalty DOB assessed against a building, distinct from the theoretical over-cap exposure computed from LL84 emissions.Best-effort shadow field:
ecb_summons_issuedPublic release status: announced_not_yet_released - Simulated · internal DOB data not yet publicAudit assignmentBuildings selected by DOB for LL97 filing audit and the audit stage.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicAudit outcomeResult of an LL97 audit (accepted / correction ordered / penalty referred).Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicExtension flagWhether a per-building filing was accepted under a filing extension (June 30 grace or BEAM extension to August 29).Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicFiling received dateTimestamp DOB received a per-building LL97 compliance filing.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicGood-faith effort applicationWhether an owner has applied for a good-faith effort determination and its status.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicMediated resolution applicationApplication for the LL97 mediated resolution process and its outcome.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicNotice of deficiency statusWhether a notice of deficiency has been issued for a building and its current stage.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicPer-building filing statusFiling status for each covered BBL/BIN combination (filed / late / non-filed / exempt) as tracked in DOB's BEAM system.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicPre-OATH correspondenceDOB correspondence with owners before an OATH matter is opened (notice of deficiency, cure letters).Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicRDP attestationRegistered Design Professional attestation attached to each per-building compliance filing.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicRECs / offsets claimedRenewable Energy Credits and beneficial-use offsets claimed to reduce reported emissions.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet public60-day cure windowThe 60-day cure window state for a building under LL97 enforcement (open / cured / expired).Public release status: announced_not_yet_released