BBL 1002090028 · BIN 1002692 · Manhattan · Block 00209, Lot 0028

261 CANAL STREET

Article 321Pathway source: CBL PDF row · CP3_article_321_one_timeCBL revision date 2026-06-16Open CBL source PDF
Buildings on lot 1
← Buildings

Article 321 · prescriptive compliance pathway

This building is on the Article 321 pathway. Article 321 does not use a numerical cap; compliance is demonstrated via the prescriptive measures package (per methodology · Article 321), which DOB does not currently publish per building. Cap, delta, and penalty columns are intentionally suppressed on Article 321 rows in this product.

2024-29
Occupancy: B
GFA: 103,047 sqft
Methodology: v1.0
2030-34
Occupancy: B
GFA: 103,047 sqft
Methodology: v1.0

LL84 GHG emissions history

Actual tCO2e reported to LL84 by report year. Each bar links to the raw LL84 row identifier under the chart for auditability.

2021207.7 tCO2e2022269.6 tCO2e2023372 tCO2e2024382.5 tCO2e
YearProperty typeGHGProperty GFASite EUISource EUIES scoreSource
2021Office207.7 tCO2e103,047 sqft28.871.3967x5e-2fxh / 11987147
2022Office269.6 tCO2e103,047 sqft31.485.7925zyy-y8am / 11987147
2023Office372 tCO2e103,047 sqft34.292.4905zyy-y8am / 30687916
2024Office382.5 tCO2e103,047 sqft33.889.6915zyy-y8am / 30687916

Enforcement events (all DOB + ECB + OATH data cross-linked to this BBL)

Open on enforcement page →
0 LL97-specific events · 18 building-scoped context events.
DOB violation filed0 LL97 · 9 scoped
ECB summons issued0 LL97 · 4 scoped
Safety context record0 LL97 · 5 scoped
StageEvent dateViolationSeverityStatusPenaltySource
Safety context recordbuilding-scoped2026-03-17
FTC-AEU-HAZ
-Dismissed-855j-jady
ECB summons issuedbuilding-scoped2025-12-05
Construction
28-201.1 UNLAWFUL ACTS. FAILURE TO COMPLY WITH AN ORDER OF THE COMMISSIONER
ECB #35718943X
CLASS - 1ACTIVE$12,5006bgk-3dad
Safety context recordbuilding-scoped2025-11-14
HBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL HGH PRESSURE INSPECTION
-Active-855j-jady
Safety context recordbuilding-scoped2025-11-14
HBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2024 INTERNAL HGH PRESSURE INSPECTION
-Active-855j-jady
DOB violation filedbuilding-scoped2025-11-14
HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2024 INTERNAL HGH PRESSURE INSPECTION
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9
DOB violation filedbuilding-scoped2025-11-14
HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL HGH PRESSURE INSPECTION
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9
DOB violation filedbuilding-scoped2025-10-23
C-CONSTRUCTION OTHER OPTIONAL
FTC W/COMMISSIONER'S ORDER CONTROL#347825 VIO#081125PI10201SB DATED 8/11/25 REQURING OWNET TP PROVIDE A CORRECTIVE ACTION PLAN BY 9/11/25 & START BLDG REPRS UNDER PERMIT BY 10/11/25 AS OF 10/23/25 A CAP AND EVIDENCE WAS NOT REC'D. IMMED COMPLY W/COMSSIONER'S ORDER CONTROL# 347825 VIO#081125PI10201SB TO PROVIDE A CORRECTIVE ACTION PLAN
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9
DOB violation filedbuilding-scoped2025-08-12
IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL
PROVIDE APPX 100 LINEAR FEET OF SIDEWAL SHED AT THE FULL WIDTH OF EXP #1 ALONG CANAL STREET, TOTAL APPRX 100 LINEAR FEET OF SIDEWALK SHED
-V*-DOB VIOLATION - DISMISSED-3h2n-5cm9
DOB violation filedbuilding-scoped2025-08-11
C-CONSTRUCTION OTHER OPTIONAL
CORRECTIVE ACTION PLAN REQ'D-OBSVD @ EXP1 CRACKED WINDOW SILL ON THE 2FL & DETERIORATED MORTAR UNDER THE WATERTABLE ON 2FL. OBSVD SPALLING STUCCO @ EXP3&4. OBSVD A MSONRY CRACK @ INTERIOR WALL @ BSMT.OWNER TO IMMED RETAIN REG DESIGN PROF IN GOOD STANDING W/DOB&NYS TO SUBMIT A CORRECTIVE ACTION PLAN BY SEPT 11 2025 BLDG T/BE REPAIRED UNDER PERMIT
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9
ECB summons issuedbuilding-scoped2025-08-11
Construction
28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER
ECB #35719076L
CLASS - 1ACTIVE$2,5306bgk-3dad
DOB violation filedbuilding-scoped2025-04-09
C-CONSTRUCTION OTHER OPTIONAL
EMERGENCY WORK ORDER.ON 4/19/25,THE REAR WALL OF THE TERRACOTA ENCLOSURE OF THE WATER TANK@THE ROOF SOUTH-EAST CORNER COLLAPSED.THE REMAINDER OF THE TERRACOTA WALLS IS IN DANGER OF COLLAPSE.IMMED DEMO THE WATER POWER ENCLOSURE UNDR DRCT&CNTINOUS SPRVSN OF PE 1.PRVDE MEANS&METHDS TO XCELO@BUILDINGS.NYC.GOV
-V*-DOB VIOLATION - DISMISSED-3h2n-5cm9
DOB violation filedbuilding-scoped2025-04-09
C-CONSTRUCTION OTHER OPTIONAL
APPROXIMATELY 10 FOOT BY 18-FOOT-HIGH REAR SECTION OF ROOF MOUNTED TERRACOTTA SPRINKLER TANK BULKHEAD WALL HAS DISLODGED AND COLLAPSED TO SETBACK BELOW WITH A 3 X 4 FOOT REMAINING SECTION IN DANGER OF COLLAPSING TO SETBACK BELOW.
-V*-DOB VIOLATION - DISMISSED-3h2n-5cm9
ECB summons issuedbuilding-scoped2025-04-09
Construction
28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER
ECB #39144454K
CLASS - 1RESOLVE$12,5006bgk-3dad
Safety context recordbuilding-scoped2024-09-23
HBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2023 INTERNAL HGH PRESSURE INSPECTION
-Active-855j-jady
Safety context recordbuilding-scoped2024-09-23
HBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL HGH PRESSURE INSPECTION
-Active-855j-jady
DOB violation filedbuilding-scoped2024-09-23
HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2023 INTERNAL HGH PRESSURE INSPECTION
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9
DOB violation filedbuilding-scoped2024-09-23
HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL HGH PRESSURE INSPECTION
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9
ECB summons issuedbuilding-scoped2024-04-05
Construction
28-118.3.2 OCC CONTRARY TO THAT ALLOWED BY THE C OF O OR DOB RECORDS
ECB #39110859N
CLASS - 2ACTIVE$5006bgk-3dad

Records are the union of DOB Violations (3h2n-5cm9), ECB (6bgk-3dad), Safety Violations (855j-jady), OATH Hearings (jz4z-kudi), and OATH Trials (y3hw-z6bm) that we could link back to this BBL via BIN or address parsing. Events not tagged LL97-specific are shown as building-scoped context. See methodology · enforcement linking.

Fields we cannot show here (internal DOB data not yet public)

Processing lifecycle

DOB's internal BEAM system tracks per-building compliance stages, RCE / decarbonization plans, and mitigation credits. Those fields are not yet published as an open dataset. When DOB releases them, this product will show them here without a schema migration. Until then, the following are known gaps for this building:

  • Assessed penalty (vs theoretical)
    Actual penalty DOB assessed against a building, distinct from the theoretical over-cap exposure computed from LL84 emissions.
    Simulated · internal DOB data not yet public
    Best-effort shadow field: ecb_summons_issued
    Public release status: announced_not_yet_released
  • Audit assignment
    Buildings selected by DOB for LL97 filing audit and the audit stage.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Audit outcome
    Result of an LL97 audit (accepted / correction ordered / penalty referred).
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Extension flag
    Whether a per-building filing was accepted under a filing extension (June 30 grace or BEAM extension to August 29).
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Filing received date
    Timestamp DOB received a per-building LL97 compliance filing.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Good-faith effort application
    Whether an owner has applied for a good-faith effort determination and its status.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Mediated resolution application
    Application for the LL97 mediated resolution process and its outcome.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Notice of deficiency status
    Whether a notice of deficiency has been issued for a building and its current stage.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Per-building filing status
    Filing status for each covered BBL/BIN combination (filed / late / non-filed / exempt) as tracked in DOB's BEAM system.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Pre-OATH correspondence
    DOB correspondence with owners before an OATH matter is opened (notice of deficiency, cure letters).
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • RDP attestation
    Registered Design Professional attestation attached to each per-building compliance filing.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • RECs / offsets claimed
    Renewable Energy Credits and beneficial-use offsets claimed to reduce reported emissions.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • 60-day cure window
    The 60-day cure window state for a building under LL97 enforcement (open / cured / expired).
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
Every number on this page traces back to a Socrata dataset row or a CBL PDF revision. Where DOB does not publish a computable field (pathway, internal BEAM stage, compliance decision), we say so on the record instead of hiding the gap. See methodology.