261 CANAL STREET
CP3_article_321_one_timeCBL revision date 2026-06-16Open CBL source PDFArticle 321 · prescriptive compliance pathway
This building is on the Article 321 pathway. Article 321 does not use a numerical cap; compliance is demonstrated via the prescriptive measures package (per methodology · Article 321), which DOB does not currently publish per building. Cap, delta, and penalty columns are intentionally suppressed on Article 321 rows in this product.
LL84 GHG emissions history
Actual tCO2e reported to LL84 by report year. Each bar links to the raw LL84 row identifier under the chart for auditability.
| Year | Property type | GHG | Property GFA | Site EUI | Source EUI | ES score | Source |
|---|---|---|---|---|---|---|---|
| 2021 | Office | 207.7 tCO2e | 103,047 sqft | 28.8 | 71.3 | 96 | 7x5e-2fxh / 11987147 |
| 2022 | Office | 269.6 tCO2e | 103,047 sqft | 31.4 | 85.7 | 92 | 5zyy-y8am / 11987147 |
| 2023 | Office | 372 tCO2e | 103,047 sqft | 34.2 | 92.4 | 90 | 5zyy-y8am / 30687916 |
| 2024 | Office | 382.5 tCO2e | 103,047 sqft | 33.8 | 89.6 | 91 | 5zyy-y8am / 30687916 |
Enforcement events (all DOB + ECB + OATH data cross-linked to this BBL)
Open on enforcement page →| Stage | Event date | Violation | Severity | Status | Penalty | Source |
|---|---|---|---|---|---|---|
| Safety context recordbuilding-scoped | 2026-03-17 | FTC-AEU-HAZ | - | Dismissed | - | 855j-jady |
| ECB summons issuedbuilding-scoped | 2025-12-05 | Construction 28-201.1 UNLAWFUL ACTS. FAILURE TO COMPLY WITH AN ORDER OF THE COMMISSIONER ECB #35718943X | CLASS - 1 | ACTIVE | $12,500 | 6bgk-3dad |
| Safety context recordbuilding-scoped | 2025-11-14 | HBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL HGH PRESSURE INSPECTION | - | Active | - | 855j-jady |
| Safety context recordbuilding-scoped | 2025-11-14 | HBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 INTERNAL HGH PRESSURE INSPECTION | - | Active | - | 855j-jady |
| DOB violation filedbuilding-scoped | 2025-11-14 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2024 INTERNAL HGH PRESSURE INSPECTION | - | V-DOB VIOLATION - ACTIVE | - | 3h2n-5cm9 |
| DOB violation filedbuilding-scoped | 2025-11-14 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL HGH PRESSURE INSPECTION | - | V-DOB VIOLATION - ACTIVE | - | 3h2n-5cm9 |
| DOB violation filedbuilding-scoped | 2025-10-23 | C-CONSTRUCTION OTHER OPTIONAL FTC W/COMMISSIONER'S ORDER CONTROL#347825 VIO#081125PI10201SB DATED 8/11/25 REQURING OWNET TP PROVIDE A CORRECTIVE ACTION PLAN BY 9/11/25 & START BLDG REPRS UNDER PERMIT BY 10/11/25 AS OF 10/23/25 A CAP AND EVIDENCE WAS NOT REC'D. IMMED COMPLY W/COMSSIONER'S ORDER CONTROL# 347825 VIO#081125PI10201SB TO PROVIDE A CORRECTIVE ACTION PLAN | - | V-DOB VIOLATION - ACTIVE | - | 3h2n-5cm9 |
| DOB violation filedbuilding-scoped | 2025-08-12 | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL PROVIDE APPX 100 LINEAR FEET OF SIDEWAL SHED AT THE FULL WIDTH OF EXP #1 ALONG CANAL STREET, TOTAL APPRX 100 LINEAR FEET OF SIDEWALK SHED | - | V*-DOB VIOLATION - DISMISSED | - | 3h2n-5cm9 |
| DOB violation filedbuilding-scoped | 2025-08-11 | C-CONSTRUCTION OTHER OPTIONAL CORRECTIVE ACTION PLAN REQ'D-OBSVD @ EXP1 CRACKED WINDOW SILL ON THE 2FL & DETERIORATED MORTAR UNDER THE WATERTABLE ON 2FL. OBSVD SPALLING STUCCO @ EXP3&4. OBSVD A MSONRY CRACK @ INTERIOR WALL @ BSMT.OWNER TO IMMED RETAIN REG DESIGN PROF IN GOOD STANDING W/DOB&NYS TO SUBMIT A CORRECTIVE ACTION PLAN BY SEPT 11 2025 BLDG T/BE REPAIRED UNDER PERMIT | - | V-DOB VIOLATION - ACTIVE | - | 3h2n-5cm9 |
| ECB summons issuedbuilding-scoped | 2025-08-11 | Construction 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER ECB #35719076L | CLASS - 1 | ACTIVE | $2,530 | 6bgk-3dad |
| DOB violation filedbuilding-scoped | 2025-04-09 | C-CONSTRUCTION OTHER OPTIONAL EMERGENCY WORK ORDER.ON 4/19/25,THE REAR WALL OF THE TERRACOTA ENCLOSURE OF THE WATER TANK@THE ROOF SOUTH-EAST CORNER COLLAPSED.THE REMAINDER OF THE TERRACOTA WALLS IS IN DANGER OF COLLAPSE.IMMED DEMO THE WATER POWER ENCLOSURE UNDR DRCT&CNTINOUS SPRVSN OF PE 1.PRVDE MEANS&METHDS TO XCELO@BUILDINGS.NYC.GOV | - | V*-DOB VIOLATION - DISMISSED | - | 3h2n-5cm9 |
| DOB violation filedbuilding-scoped | 2025-04-09 | C-CONSTRUCTION OTHER OPTIONAL APPROXIMATELY 10 FOOT BY 18-FOOT-HIGH REAR SECTION OF ROOF MOUNTED TERRACOTTA SPRINKLER TANK BULKHEAD WALL HAS DISLODGED AND COLLAPSED TO SETBACK BELOW WITH A 3 X 4 FOOT REMAINING SECTION IN DANGER OF COLLAPSING TO SETBACK BELOW. | - | V*-DOB VIOLATION - DISMISSED | - | 3h2n-5cm9 |
| ECB summons issuedbuilding-scoped | 2025-04-09 | Construction 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER ECB #39144454K | CLASS - 1 | RESOLVE | $12,500 | 6bgk-3dad |
| Safety context recordbuilding-scoped | 2024-09-23 | HBLVIO VIOLATION ISSUED-FAILURE TO FILE 2023 INTERNAL HGH PRESSURE INSPECTION | - | Active | - | 855j-jady |
| Safety context recordbuilding-scoped | 2024-09-23 | HBLVIO VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL HGH PRESSURE INSPECTION | - | Active | - | 855j-jady |
| DOB violation filedbuilding-scoped | 2024-09-23 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2023 INTERNAL HGH PRESSURE INSPECTION | - | V-DOB VIOLATION - ACTIVE | - | 3h2n-5cm9 |
| DOB violation filedbuilding-scoped | 2024-09-23 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL HGH PRESSURE INSPECTION | - | V-DOB VIOLATION - ACTIVE | - | 3h2n-5cm9 |
| ECB summons issuedbuilding-scoped | 2024-04-05 | Construction 28-118.3.2 OCC CONTRARY TO THAT ALLOWED BY THE C OF O OR DOB RECORDS ECB #39110859N | CLASS - 2 | ACTIVE | $500 | 6bgk-3dad |
Records are the union of DOB Violations (3h2n-5cm9), ECB (6bgk-3dad), Safety Violations (855j-jady), OATH Hearings (jz4z-kudi), and OATH Trials (y3hw-z6bm) that we could link back to this BBL via BIN or address parsing. Events not tagged LL97-specific are shown as building-scoped context. See methodology · enforcement linking.
Fields we cannot show here (internal DOB data not yet public)
Processing lifecycleDOB's internal BEAM system tracks per-building compliance stages, RCE / decarbonization plans, and mitigation credits. Those fields are not yet published as an open dataset. When DOB releases them, this product will show them here without a schema migration. Until then, the following are known gaps for this building:
- Simulated · internal DOB data not yet publicAssessed penalty (vs theoretical)Actual penalty DOB assessed against a building, distinct from the theoretical over-cap exposure computed from LL84 emissions.Best-effort shadow field:
ecb_summons_issuedPublic release status: announced_not_yet_released - Simulated · internal DOB data not yet publicAudit assignmentBuildings selected by DOB for LL97 filing audit and the audit stage.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicAudit outcomeResult of an LL97 audit (accepted / correction ordered / penalty referred).Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicExtension flagWhether a per-building filing was accepted under a filing extension (June 30 grace or BEAM extension to August 29).Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicFiling received dateTimestamp DOB received a per-building LL97 compliance filing.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicGood-faith effort applicationWhether an owner has applied for a good-faith effort determination and its status.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicMediated resolution applicationApplication for the LL97 mediated resolution process and its outcome.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicNotice of deficiency statusWhether a notice of deficiency has been issued for a building and its current stage.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicPer-building filing statusFiling status for each covered BBL/BIN combination (filed / late / non-filed / exempt) as tracked in DOB's BEAM system.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicPre-OATH correspondenceDOB correspondence with owners before an OATH matter is opened (notice of deficiency, cure letters).Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicRDP attestationRegistered Design Professional attestation attached to each per-building compliance filing.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicRECs / offsets claimedRenewable Energy Credits and beneficial-use offsets claimed to reduce reported emissions.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet public60-day cure windowThe 60-day cure window state for a building under LL97 enforcement (open / cured / expired).Public release status: announced_not_yet_released