131 RIVINGTON STREET
CP3_article_321_one_timeCBL revision date 2026-06-16Open CBL source PDFArticle 321 · prescriptive compliance pathway
This building is on the Article 321 pathway. Article 321 does not use a numerical cap; compliance is demonstrated via the prescriptive measures package (per methodology · Article 321), which DOB does not currently publish per building. Cap, delta, and penalty columns are intentionally suppressed on Article 321 rows in this product.
LL84 GHG emissions history
Actual tCO2e reported to LL84 by report year. Each bar links to the raw LL84 row identifier under the chart for auditability.
| Year | Property type | GHG | Property GFA | Site EUI | Source EUI | ES score | Source |
|---|---|---|---|---|---|---|---|
| 2021 | Multifamily Housing | 130.9 tCO2e | 25,650 sqft | 88.7 | 126.6 | 64 | 7x5e-2fxh / 6720754 |
| 2022 | Multifamily Housing | 141.3 tCO2e | 25,650 sqft | 92.2 | 130.9 | 62 | 5zyy-y8am / 6720754 |
| 2023 | Multifamily Housing | 146.2 tCO2e | 25,650 sqft | 88.7 | 124.2 | 62 | 5zyy-y8am / 6720754 |
| 2024 | Multifamily Housing | 153.4 tCO2e | 25,650 sqft | 93.7 | 126.8 | 61 | 5zyy-y8am / 6720754 |
Enforcement events (all DOB + ECB + OATH data cross-linked to this BBL)
Open on enforcement page →| Stage | Event date | Violation | Severity | Status | Penalty | Source |
|---|---|---|---|---|---|---|
| ECB summons issuedbuilding-scoped | 2025-04-08 | Local Law 28-302.4 FAILURE TO SUBMIT A REQUIRED REPORT OF CRITICAL EXAMINATION DOCUMENTIN ECB #37034502X | CLASS - 2 | ACTIVE | $10,000 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2024-12-24 | Construction 28-105.12.2 WRK DOESN'T CONFORM TO APPROV DOCS AND/OR APPROV AMENDMENTS ECB #39535334Y | CLASS - 2 | ACTIVE | $1,250 | 6bgk-3dad |
| DOB violation filedbuilding-scoped | 2024-04-09 | C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER.AT TIME OF INS PECTION OBSERVED MULTIPLE AREAS OF CRACKED/SPALLING STONE AT EXP1.AT E XP2 OBSERVED MULTIPLE AREAS OF CRACLED/SPALLED STONE IN MULTIPLE LOCAT IONS OF THE BUILDING.EXP1 DAMAGED WINDOW SILLS.OBSERVED CRACKED STUCCO AT EXP1 STREET LEVEL.REMEDY:REPAIR AND/OR REPLACE | - | V-DOB VIOLATION - ACTIVE | - | 3h2n-5cm9 |
| DOB violation filedbuilding-scoped | 2024-04-09 | C-CONSTRUCTION OTHER OPTIONAL EMERGENCY WORK ORDER DUE TO HAZRDOUS LOOSE MATERIAL OBSERVED AT EXP1 L OOSE CRACKED STONE AT MULTIPLE LOCATIONS.AT EXP2 OBSERVED LOOSE CRACKE D STONE AT MULTIPLE LOCATIONS.REMEDY:IMMEDIATELY REMOVE LOOSE HAZARDOU S MATERIAL NOTED.PROVIDE SAFETY MEASURES UNDER THE DIRECTION OF A LIC PROFESSIONAL.INSTALL SIDEWALK SHED | - | V-DOB VIOLATION - ACTIVE | - | 3h2n-5cm9 |
| DOB violation filedbuilding-scoped | 2024-03-06 | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION | - | V*-DOB VIOLATION - DISMISSED | - | 3h2n-5cm9 |
| Safety context recordbuilding-scoped | 2024-03-06 | FTC-AEU-HAZ | - | Dismissed | - | 855j-jady |
| ECB summons issuedbuilding-scoped | 2024-03-04 | Construction 28-302.1 FAILURE TO MAINTAIN BLDG WALL(S) OR APPURTENANCES ECB #35682084P | CLASS - 2 | ACTIVE | $1,250 | 6bgk-3dad |
| DOB violation filedbuilding-scoped | 2024-02-22 | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024 | - | V-DOB VIOLATION - ACTIVE | - | 3h2n-5cm9 |
| Safety context recordbuilding-scoped | 2024-02-22 | FISPNRF FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024 | - | Active | - | 855j-jady |
| DOB violation filedbuilding-scoped | 2024-02-07 | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION | - | V*-DOB VIOLATION - DISMISSED | - | 3h2n-5cm9 |
| Safety context recordbuilding-scoped | 2024-02-07 | FTC-AEU-HAZ | - | Dismissed | - | 855j-jady |
Records are the union of DOB Violations (3h2n-5cm9), ECB (6bgk-3dad), Safety Violations (855j-jady), OATH Hearings (jz4z-kudi), and OATH Trials (y3hw-z6bm) that we could link back to this BBL via BIN or address parsing. Events not tagged LL97-specific are shown as building-scoped context. See methodology · enforcement linking.
Fields we cannot show here (internal DOB data not yet public)
Processing lifecycleDOB's internal BEAM system tracks per-building compliance stages, RCE / decarbonization plans, and mitigation credits. Those fields are not yet published as an open dataset. When DOB releases them, this product will show them here without a schema migration. Until then, the following are known gaps for this building:
- Simulated · internal DOB data not yet publicAssessed penalty (vs theoretical)Actual penalty DOB assessed against a building, distinct from the theoretical over-cap exposure computed from LL84 emissions.Best-effort shadow field:
ecb_summons_issuedPublic release status: announced_not_yet_released - Simulated · internal DOB data not yet publicAudit assignmentBuildings selected by DOB for LL97 filing audit and the audit stage.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicAudit outcomeResult of an LL97 audit (accepted / correction ordered / penalty referred).Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicExtension flagWhether a per-building filing was accepted under a filing extension (June 30 grace or BEAM extension to August 29).Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicFiling received dateTimestamp DOB received a per-building LL97 compliance filing.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicGood-faith effort applicationWhether an owner has applied for a good-faith effort determination and its status.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicMediated resolution applicationApplication for the LL97 mediated resolution process and its outcome.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicNotice of deficiency statusWhether a notice of deficiency has been issued for a building and its current stage.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicPer-building filing statusFiling status for each covered BBL/BIN combination (filed / late / non-filed / exempt) as tracked in DOB's BEAM system.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicPre-OATH correspondenceDOB correspondence with owners before an OATH matter is opened (notice of deficiency, cure letters).Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicRDP attestationRegistered Design Professional attestation attached to each per-building compliance filing.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicRECs / offsets claimedRenewable Energy Credits and beneficial-use offsets claimed to reduce reported emissions.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet public60-day cure windowThe 60-day cure window state for a building under LL97 enforcement (open / cured / expired).Public release status: announced_not_yet_released