BBL 1003620001 · BIN 1077507 · Manhattan · Block 00362, Lot 0001

134 AVENUE D

Article 320Pathway source: CBL PDF row · CP4_city_portfolioCBL revision date 2026-06-16Open CBL source PDF
Buildings on lot 5
← Buildings

Article 320 · numerical caps & computed exposure

How this is computed
PeriodOccupancyGFACapActualDeltaEst. penaltyStatusMethodology
2024-29R-2(high)478,800 sqft3,231.9 tCO2e10,933 tCO2e+7,700.8$2,063,825
Over capEJ · PEJA fallback
v1.0
2030-34R-2(high)478,800 sqft1,948.7 tCO2e10,933 tCO2e+8,984$2,407,718
Over capEJ · PEJA fallback
v1.0

Cap = Σ (occupancy_coefficient × gross_floor_area) using DOB LL97 rules; actual GHG is the most recent LL84 filing. Delta is positive when actual exceeds cap. Estimated penalty is DOB's public $268/tCO2e × delta with a 30-day grace applied via penalty_estimate_usd.

LL84 GHG emissions history

Actual tCO2e reported to LL84 by report year. Each bar links to the raw LL84 row identifier under the chart for auditability.

202410,933 tCO2e
YearProperty typeGHGProperty GFASite EUISource EUIES scoreSource
2024Multifamily Housing10,933 tCO2e478,800 sqft198.4555.515zyy-y8am / 53302092

Enforcement events (all DOB + ECB + OATH data cross-linked to this BBL)

Open on enforcement page →
0 LL97-specific events · 40 building-scoped context events.
DOB violation filed0 LL97 · 15 scoped
ECB summons issued0 LL97 · 9 scoped
Safety context record0 LL97 · 16 scoped
StageEvent dateViolationSeverityStatusPenaltySource
ECB summons issuedbuilding-scoped2026-02-13
Construction
28-302.1 FAILURE TO MAINTAIN BLDG WALL(S) OR APPURTENANCES
ECB #35726694Y
CLASS - 1ACTIVE$5,0006bgk-3dad
Safety context recordbuilding-scoped2026-01-14
FTC-FC-UNSAFE
Unsafe report filed
-Waived - Pending Dismissal-855j-jady
Safety context recordbuilding-scoped2025-10-10
FTC-VT-CAT1-HA
Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction
-Dismissed-855j-jady
Safety context recordbuilding-scoped2025-10-10
FTC-VT-CAT1-HA
Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction
-Dismissed-855j-jady
DOB violation filedbuilding-scoped2025-05-07
FISPFCS-FAILURE TO CORRECT SWARMP CONDITIONS (FACADE) FACADE REQUIRED
CYCLE 9 FAILURE TO CORRECT SWARMP CONDITIONS
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9
Safety context recordbuilding-scoped2025-05-07
FISPFCS
CYCLE 9 FAILURE TO CORRECT SWARMP CONDITIONS
-Active-855j-jady
ECB summons issuedbuilding-scoped2025-03-28
Construction
28-302.5 FAIL TO TAKE REQUIRED MEASURES TO SECURE PUBLIC SAFWTY-UNSAFE FACADE
ECB #35716638K
CLASS - 1ACTIVE$10,0006bgk-3dad
ECB summons issuedbuilding-scoped2025-03-28
Construction
28-302.5 FAIL TO TAKE REQUIRED MEASURES TO SECURE PUBLIC SAFWTY-UNSAFE FACADE
ECB #35716637Z
CLASS - 1RESOLVE$10,0006bgk-3dad
Safety context recordbuilding-scoped2025-02-18
FISPHAZ
NYCHA CYCLE 9C UNSAFE REPORT FILED
-Active-855j-jady
Safety context recordbuilding-scoped2025-02-18
FISPHAZ
NYCHA CYCLE 9C UNSAFE REPORT FILED
-Active-855j-jady
Safety context recordbuilding-scoped2025-02-18
FISPHAZ
NYCHA CYCLE 9C UNSAFE REPORT FILED
-Active-855j-jady
DOB violation filedbuilding-scoped2025-02-18
FISPFCS-FAILURE TO CORRECT SWARMP CONDITIONS (FACADE) FACADE REQUIRED
NYCHA CYCLE 9C FAILURE TO CORRECT SWARMP CONDITIONS
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9
DOB violation filedbuilding-scoped2025-02-18
FISPHAZ-HAZARDOUS CONDITION (FACADE) FACADE REQUIRED
NYCHA CYCLE 9C UNSAFE REPORT FILED
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9
Safety context recordbuilding-scoped2025-02-18
FISPHAZ
NYCHA CYCLE 9C UNSAFE REPORT FILED
-Active-855j-jady
DOB violation filedbuilding-scoped2025-02-18
FISPHAZ-HAZARDOUS CONDITION (FACADE) FACADE REQUIRED
NYCHA CYCLE 9C UNSAFE REPORT FILED
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9
DOB violation filedbuilding-scoped2025-02-18
FISPHAZ-HAZARDOUS CONDITION (FACADE) FACADE REQUIRED
NYCHA CYCLE 9C UNSAFE REPORT FILED
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9
Safety context recordbuilding-scoped2025-02-18
FISPHAZ
NYCHA CYCLE 9C UNSAFE REPORT FILED
-Active-855j-jady
DOB violation filedbuilding-scoped2025-02-18
FISPHAZ-HAZARDOUS CONDITION (FACADE) FACADE REQUIRED
NYCHA CYCLE 9C UNSAFE REPORT FILED
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9
DOB violation filedbuilding-scoped2025-02-18
FISPHAZ-HAZARDOUS CONDITION (FACADE) FACADE REQUIRED
NYCHA CYCLE 9C UNSAFE REPORT FILED
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9
DOB violation filedbuilding-scoped2025-02-18
FISPHAZ-HAZARDOUS CONDITION (FACADE) FACADE REQUIRED
NYCHA CYCLE 9C UNSAFE REPORT FILED
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9
ECB summons issuedbuilding-scoped2025-01-23
Construction
28-302.5 FAIL TO TAKE REQUIRED MEASURES TO SECURE PUBLIC SAFWTY-UNSAFE FACADE
ECB #35689386M
CLASS - 1RESOLVE$10,0006bgk-3dad
ECB summons issuedbuilding-scoped2025-01-23
Construction
28-302.5 FAIL TO TAKE REQUIRED MEASURES TO SECURE PUBLIC SAFWTY-UNSAFE FACADE
ECB #35689387Y
CLASS - 1RESOLVE$10,0006bgk-3dad
ECB summons issuedbuilding-scoped2025-01-14
Construction
28-302.5 FAIL TO TAKE REQUIRED MEASURES TO SECURE PUBLIC SAFWTY-UNSAFE FACADE
ECB #35689216J
CLASS - 1RESOLVE$10,0006bgk-3dad
ECB summons issuedbuilding-scoped2025-01-14
Construction
28-302.5 FAIL TO TAKE REQUIRED MEASURES TO SECURE PUBLIC SAFWTY-UNSAFE FACADE
ECB #35689217L
CLASS - 1RESOLVE$10,0006bgk-3dad
ECB summons issuedbuilding-scoped2025-01-06
Construction
28-302.5 FAIL TO TAKE REQUIRED MEASURES TO SECURE PUBLIC SAFWTY-UNSAFE FACADE
ECB #35689760N
CLASS - 1RESOLVE$10,0006bgk-3dad
ECB summons issuedbuilding-scoped2025-01-06
Construction
28-302.5 FAIL TO TAKE REQUIRED MEASURES TO SECURE PUBLIC SAFWTY-UNSAFE FACADE
ECB #35689757M
CLASS - 1RESOLVE$10,0006bgk-3dad
Safety context recordbuilding-scoped2024-06-23
FTF-EN-EARCX
-Dismissed-855j-jady
DOB violation filedbuilding-scoped2024-06-23
EARCX-FAILURE TO SUBMIT EER NONE
FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 IN 2023
-V*-DOB VIOLATION - DISMISSED-3h2n-5cm9
DOB violation filedbuilding-scoped2024-02-22
FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED
FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024
-V*-DOB VIOLATION - DISMISSED-3h2n-5cm9
DOB violation filedbuilding-scoped2024-02-22
FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED
FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9
DOB violation filedbuilding-scoped2024-02-22
FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED
FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9
DOB violation filedbuilding-scoped2024-02-22
FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED
FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9
DOB violation filedbuilding-scoped2024-02-22
FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED
FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024
-V*-DOB VIOLATION - DISMISSED-3h2n-5cm9
Safety context recordbuilding-scoped2024-02-22
FISPNRF
FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024
-Active-855j-jady
Safety context recordbuilding-scoped2024-02-22
FISPNRF
FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024
-Dismissed-855j-jady
Safety context recordbuilding-scoped2024-02-22
FISPNRF
FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024
-Dismissed-855j-jady
Safety context recordbuilding-scoped2024-02-22
FISPNRF
FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024
-Active-855j-jady
Safety context recordbuilding-scoped2024-02-22
FISPNRF
FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024
-Active-855j-jady
Safety context recordbuilding-scoped2024-02-22
FISPNRF
FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024
-Dismissed-855j-jady
DOB violation filedbuilding-scoped2024-02-22
FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED
FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024
-V*-DOB VIOLATION - DISMISSED-3h2n-5cm9

Records are the union of DOB Violations (3h2n-5cm9), ECB (6bgk-3dad), Safety Violations (855j-jady), OATH Hearings (jz4z-kudi), and OATH Trials (y3hw-z6bm) that we could link back to this BBL via BIN or address parsing. Events not tagged LL97-specific are shown as building-scoped context. See methodology · enforcement linking.

Fields we cannot show here (internal DOB data not yet public)

Processing lifecycle

DOB's internal BEAM system tracks per-building compliance stages, RCE / decarbonization plans, and mitigation credits. Those fields are not yet published as an open dataset. When DOB releases them, this product will show them here without a schema migration. Until then, the following are known gaps for this building:

  • Assessed penalty (vs theoretical)
    Actual penalty DOB assessed against a building, distinct from the theoretical over-cap exposure computed from LL84 emissions.
    Simulated · internal DOB data not yet public
    Best-effort shadow field: ecb_summons_issued
    Public release status: announced_not_yet_released
  • Audit assignment
    Buildings selected by DOB for LL97 filing audit and the audit stage.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Audit outcome
    Result of an LL97 audit (accepted / correction ordered / penalty referred).
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Extension flag
    Whether a per-building filing was accepted under a filing extension (June 30 grace or BEAM extension to August 29).
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Filing received date
    Timestamp DOB received a per-building LL97 compliance filing.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Good-faith effort application
    Whether an owner has applied for a good-faith effort determination and its status.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Mediated resolution application
    Application for the LL97 mediated resolution process and its outcome.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Notice of deficiency status
    Whether a notice of deficiency has been issued for a building and its current stage.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Per-building filing status
    Filing status for each covered BBL/BIN combination (filed / late / non-filed / exempt) as tracked in DOB's BEAM system.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Pre-OATH correspondence
    DOB correspondence with owners before an OATH matter is opened (notice of deficiency, cure letters).
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • RDP attestation
    Registered Design Professional attestation attached to each per-building compliance filing.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • RECs / offsets claimed
    Renewable Energy Credits and beneficial-use offsets claimed to reduce reported emissions.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • 60-day cure window
    The 60-day cure window state for a building under LL97 enforcement (open / cured / expired).
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
Every number on this page traces back to a Socrata dataset row or a CBL PDF revision. Where DOB does not publish a computable field (pathway, internal BEAM stage, compliance decision), we say so on the record instead of hiding the gap. See methodology.