NYC Prototypes
Skip to main content
BBL 1007320007 · BIN 1012857 · Manhattan · Block 00732, Lot 0007

455 WEST 34TH STREET

Article 321Pathway source: CBL PDF row · CP3_article_321_one_timeCBL revision date 2026-06-16Open CBL source PDF
Buildings on lot 1
← Buildings

Article 321 · prescriptive compliance pathway

This building is on the Article 321 pathway. Article 321 does not use a numerical cap; compliance is demonstrated via the prescriptive measures package (per methodology · Article 321), which DOB does not currently publish per building. Cap, delta, and penalty columns are intentionally suppressed on Article 321 rows in this product.

2024-29
Occupancy: R-2
GFA: 103,624 sqft
Methodology: v1.0
2030-34
Occupancy: R-2
GFA: 103,624 sqft
Methodology: v1.0

LL84 GHG emissions history

Actual tCO2e reported to LL84 by report year. Each bar links to the raw LL84 row identifier under the chart for auditability.

2021494.5 tCO2e2022510.5 tCO2e2023495.1 tCO2e2024483.4 tCO2e
YearProperty typeGHGProperty GFASite EUISource EUIES scoreSource
2021Multifamily Housing494.5 tCO2e97,857 sqft87.5126.3647x5e-2fxh / 2669081
2022Multifamily Housing510.5 tCO2e97,857 sqft87.6123.4705zyy-y8am / 2669081
2023Multifamily Housing495.1 tCO2e103,624 sqft72.6105.2795zyy-y8am / 2669081
2024Multifamily Housing483.4 tCO2e103,624 sqft68.7100.8845zyy-y8am / 2669081

Enforcement events (all DOB + ECB + OATH data cross-linked to this BBL)

Open on enforcement page →
0 LL97-specific events · 41 building-scoped context events.
DOB violation filed0 LL97 · 12 scoped
ECB summons issued0 LL97 · 22 scoped
Safety context record0 LL97 · 7 scoped
StageEvent dateViolationSeverityStatusPenaltySource
ECB summons issuedbuilding-scoped2026-06-18
Construction
1 RCNY$103-04(B)(5)(III) REMOVAL OF SHED OR PROTECTIVE MEASURE WITHOUT DEPARTMENT APPROVAL
ECB #35726594R
CLASS - 2ACTIVE$1,2506bgk-3dad
DOB violation filedbuilding-scoped2026-06-18
C-CONSTRUCTION OTHER OPTIONAL
EMERGENCY WORK ORDER:OWNER REMOVED 20' EXTENSION OF CODE REQUIRED SIDE WALK SHED @ EXP1,#4 WITHOUT DEPARMENT APPROVAL EXPOSING PUBLIC TO SUBSTANTIAL OVERHEAD HAZARD. THE FACADE IS DOCUEMNTED UNSAFE IN THE FISP. REMEDY: IMMEDIATELY IMPLEMENT PUBLIC PROTECTION (SW SHED,ETC) OF CODE REQUIRED LENGTH & DIMENSION TO PROTECTION PUBLIC FROM UNSAFE FACA
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9
ECB summons issuedbuilding-scoped2026-04-20
Local Law
28-302.5 FAILURE TO FILE AN AMENDED REPORT ACCEPTABLE TO THIS DEPARTMENT INDICA
ECB #37036408Z
CLASS - 2ACTIVE$6,2506bgk-3dad
DOB violation filedbuilding-scoped2026-02-09
C-CONSTRUCTION OTHER OPTIONAL
FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER.OBSERVED AT EX P1 SOUTH ELEV,CRACKS & STEP CRACKS EXTENDING FROM 13TH FL TO THE 16TH FL.ALSO OBSERVED AT EXP4 EAST ELEV CRACKS & STEP CRACKS EXTENDING FROM THE 5TH FL TO THE 16TH FL.OBJECT HANGING FROM 8TH FL SPANDRELS.REMEDY: REPAIR AND/OR REPLACE DEFECTIVE BRICK WORKS
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9
ECB summons issuedbuilding-scoped2025-11-24
Construction
AC 28-204.4 FAIL TO COMPLY W/COMMISSIONER ORDER TO FILE CERT OF CORRECTION W/DOB
ECB #39547262M
CLASS - 2RESOLVE$1,2506bgk-3dad
ECB summons issuedbuilding-scoped2025-11-24
Construction
AC 28-204.4 FAIL TO COMPLY W/COMMISSIONER ORDER TO FILE CERT OF CORRECTION W/DOB
ECB #39547260Z
CLASS - 2RESOLVE$1,2506bgk-3dad
Safety context recordbuilding-scoped2025-10-10
FTC-VT-CAT1-CO
Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction
-Active-855j-jady
Safety context recordbuilding-scoped2025-10-10
FTC-VT-CAT1-CO
Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction
-Active-855j-jady
ECB summons issuedbuilding-scoped2025-09-22
Construction
AC 28-204.4 FAIL TO COMPLY W/COMMISSIONER ORDER TO FILE CERT OF CORRECTION W/DOB
ECB #39545170X
CLASS - 2RESOLVE$6256bgk-3dad
ECB summons issuedbuilding-scoped2025-09-22
Construction
AC 28-204.4 FAIL TO COMPLY W/COMMISSIONER ORDER TO FILE CERT OF CORRECTION W/DOB
ECB #39545171H
CLASS - 2RESOLVE$06bgk-3dad
ECB summons issuedbuilding-scoped2025-08-19
Construction
BC 3307.6,27-1021 SIDEWALK SHED DOES NOT MEET CODE SPECIFICATIONS
ECB #35718413Z
CLASS - 2RESOLVE$06bgk-3dad
DOB violation filedbuilding-scoped2025-08-19
C-CONSTRUCTION OTHER OPTIONAL
FTM BLDG IN A CODE CPOMPLIANT MANNER NOTE AT TIME OF INSPECT OBSERVED AT EXP 1 MISSING/REMOVE MORTAR AT AROUND 15 FLOOR LINTEL OBSERVED DAMAGED WINDOW SILLS MULTIPLE LOCATIONS AT EXP 1 AT EXP 4 OBSERVED CRACKED SPALLED BRICK FACES AT LINTELS MULTIPLE LOCATIONS. REMEDY: REPAIR AND OR REPLACE
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9
ECB summons issuedbuilding-scoped2025-07-25
Unknown
ECB #39542818X
CLASS - 2RESOLVE$2,5006bgk-3dad
ECB summons issuedbuilding-scoped2025-07-25
Site Safety
BC 3301.7 (2014 CODE) FAILURE TO MAINTAIN/DISPLAY ON SITE DOCUMENTS REQUIRED BY BC CHAPTER 3
ECB #39542819H
CLASS - 1RESOLVE$2,5006bgk-3dad
ECB summons issuedbuilding-scoped2025-07-25
Construction
MISC. CHAPTER 4 OF TITLE 28-UNLICENSED ACTIVITY ILLEGALLY ENGAGING IN ANY BUSINESS OR OCCUPATION WITHOUT A REQUIRED LI
ECB #39542815K
CLASS - 1RESOLVE$5,0006bgk-3dad
ECB summons issuedbuilding-scoped2025-07-25
Construction
BC 3314.4.5 & 26-204.1(A) ERECTED, DISMANTLED REPAIRED, MAINTAINED, MODIFIED OR REMOVED SUPPORTE
ECB #39542817Y
CLASS - 1RESOLVE$5,0006bgk-3dad
ECB summons issuedbuilding-scoped2025-07-25
Construction
BC 3310.5,27-1009(D) FAIL TO HAVE SITE SAFETY MGR/COORDINATOR PRESENT AS REQUIRED
ECB #39542816M
CLASS - 1RESOLVE$10,0006bgk-3dad
DOB violation filedbuilding-scoped2024-12-04
C-CONSTRUCTION OTHER OPTIONAL
BLKHD ON BLDG ROOF,STATE OF DISREPAIR W/CRACKS&BULGES,PERMANENT REPAIR S REQ'D. REPAIR DWGS APPRVD PENDING PERMIT. BLKHD LONGTERM STABILITY & CONDITIONS NON-COMPLIANT & POSES DANGER TO PUBLIC & ADJ PROP. REMEDY: RETAIN GC TO COMPLETE REQ'D REPAIR WRK.BY 12/6 & BEGIN WRK BY 12/9/24 RETAIN NYS PE TO PERFORM MONTHLY SS INSPCT & PROVIDE RPTS TO DOB ON RE
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9
Safety context recordbuilding-scoped2024-10-11
FTC-VT-CAT1-CO
Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction
-Active-855j-jady
Safety context recordbuilding-scoped2024-10-11
FTC-VT-CAT1-CO
Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction
-Active-855j-jady
Safety context recordbuilding-scoped2024-06-26
FTC-AEU-HAZ
-Dismissed-855j-jady
DOB violation filedbuilding-scoped2024-06-26
AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
-V*-DOB VIOLATION - DISMISSED-3h2n-5cm9
ECB summons issuedbuilding-scoped2024-06-21
Construction
28-302.1 FAILURE TO MAINTAIN BLDG WALL(S) OR APPURTENANCES
ECB #35685173K
CLASS - 2RESOLVE$1,2506bgk-3dad
Safety context recordbuilding-scoped2024-05-29
FTC-AEU-HAZ
-Dismissed-855j-jady
DOB violation filedbuilding-scoped2024-05-29
AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
-V*-DOB VIOLATION - DISMISSED-3h2n-5cm9
DOB violation filedbuilding-scoped2024-05-15
AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
-V*-DOB VIOLATION - DISMISSED-3h2n-5cm9
Safety context recordbuilding-scoped2024-05-15
FTC-AEU-HAZ
-Dismissed-855j-jady
ECB summons issuedbuilding-scoped2024-05-14
Construction
28-201.1 UNLAWFUL ACTS. FAILURE TO COMPLY WITH AN ORDER OF THE COMMISSIONER
ECB #35681867R
CLASS - 1RESOLVE$06bgk-3dad
DOB violation filedbuilding-scoped2024-05-01
C-CONSTRUCTION OTHER OPTIONAL
EMERGENCY WORK ORDER DUE TO DEFECTED FIRE ESCAPE LOCATED AT REAR FACAD E EXP3 NORTH ELEV.REMEDY: OWNER TO IMMEDIATELY RETAIN NYS RD PROFESSIO NAL AND LICENSED GENERAL CONTRACTOR TO REPAIR FIRE ESCAPE UNDER FULL T IME NYS RD PROFESSIONAL ON SITE SUPERVISION.START WORK AND CONTINUE DA ILU UNTIL REPAIRS ARE COMPLETED.PROVIDE CERT FIRE GUARD AT ALL TIMES
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9
ECB summons issuedbuilding-scoped2024-04-29
Unknown
ECB #39528090L
CLASS - 2RESOLVE$2,5006bgk-3dad
ECB summons issuedbuilding-scoped2024-04-29
Unknown
ECB #39528092P
CLASS - 2RESOLVE$06bgk-3dad
ECB summons issuedbuilding-scoped2024-03-08
Construction
28-302.1 FAILURE TO MAINTAIN BLDG WALL(S) OR APPURTENANCES
ECB #35682350Z
CLASS - 1RESOLVE$2,5006bgk-3dad
DOB violation filedbuilding-scoped2024-03-08
C-CONSTRUCTION OTHER OPTIONAL
EMER WRK ORD DUE TO VERTICAL CRACKS ON FACADE MASONRY BRICKS AT EXP#1 (SOUTH ELEV), EXP #4, INADEQUATE SAFETY MEASURES AT EXP#4. REMEDY: I IMMEDIATELY TAKE SAFETY MEASURES TO SECURE PUBLIC PROTECTION AT EXP #4 (EAST ELEVATION). REMEDY: MAKE IMMEDIATE REPAIRS UNDER SUPERVISION OF LICENSED PROFESSIONAL
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9
ECB summons issuedbuilding-scoped2024-03-08
Construction
28-105.1 WORK WITHOUT A PERMIT
ECB #35682367P
CLASS - 2RESOLVE$06bgk-3dad
DOB violation filedbuilding-scoped2024-03-08
C-CONSTRUCTION OTHER OPTIONAL
CRACKS & DISPLACEMNT OF BULKHEAD W TELECOM EQUIPMENT TO COMPROMISED BULKHEAD REMEDY: REMOVE TELECOM EQPMNT FROM BULKHEAD BY 3/13/24. COORDINATE W.UTILITY CO. IF REQRD
-V*-DOB VIOLATION - DISMISSED-3h2n-5cm9
DOB violation filedbuilding-scoped2024-03-05
C-CONSTRUCTION OTHER OPTIONAL
CRACKS AND DISPLACEMENT OF BULKHEAD W/ UNPERMITTED SHORING POSES DANGR TO PUBLIC. REMEDY: EMER WRK ORDR: RETAIN NYS PE & SSM TO OVERSEE STABILIZATION & ADJ SPACE PROTECTION. PE SUBMIT STABILIZATION DRWGS TO CONSTRUCTION SAFETY ENGINEERING FOR ACCEPTANCE BY 3/7/24
-V*-DOB VIOLATION - DISMISSED-3h2n-5cm9
DOB violation filedbuilding-scoped2024-03-05
C-CONSTRUCTION OTHER OPTIONAL
CRACKS AND DISPLACEMENT OF BULKHEAD W/ UNPERMITTED SHORING,POSES DANGER TO PUBLIC. REMEDY: RETAIN NYS PE TO EST DAILY MONITORING PROTOCOL, CONDUCT DAILY STRUCTRL STABILITY INSPECTIONS. 1ST REPORT DUE 3/7/24
-V*-DOB VIOLATION - DISMISSED-3h2n-5cm9
ECB summons issuedbuilding-scoped2024-03-01
Unknown
ECB #39526071R
CLASS - 1RESOLVE$06bgk-3dad
ECB summons issuedbuilding-scoped2024-03-01
Unknown
ECB #39526088N
CLASS - 1RESOLVE$2,5006bgk-3dad
ECB summons issuedbuilding-scoped2024-03-01
Construction
28-105.1 WORK WITHOUT A PERMIT
ECB #39526055R
CLASS - 1RESOLVE$2,5006bgk-3dad
ECB summons issuedbuilding-scoped2024-01-16
Local Law
28-302.5 FAILURE TO FILE AN AMENDED REPORT ACCEPTABLE TO THIS DEPARTMENT INDICA
ECB #37026295M
CLASS - 2ACTIVE$1,2506bgk-3dad

Records are the union of DOB Violations (3h2n-5cm9), ECB (6bgk-3dad), Safety Violations (855j-jady), OATH Hearings (jz4z-kudi), and OATH Trials (y3hw-z6bm) that we could link back to this BBL via BIN or address parsing. Events not tagged LL97-specific are shown as building-scoped context. See methodology · enforcement linking.

Fields we cannot show here (internal DOB data not yet public)

Processing lifecycle

DOB's internal BEAM system tracks per-building compliance stages, RCE / decarbonization plans, and mitigation credits. Those fields are not yet published as an open dataset. When DOB releases them, this product will show them here without a schema migration. Until then, the following are known gaps for this building:

  • Assessed penalty (vs theoretical)
    Actual penalty DOB assessed against a building, distinct from the theoretical over-cap exposure computed from LL84 emissions.
    Simulated · internal DOB data not yet public
    Best-effort shadow field: ecb_summons_issued
    Public release status: announced_not_yet_released
  • Audit assignment
    Buildings selected by DOB for LL97 filing audit and the audit stage.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Audit outcome
    Result of an LL97 audit (accepted / correction ordered / penalty referred).
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Extension flag
    Whether a per-building filing was accepted under a filing extension (June 30 grace or BEAM extension to August 29).
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Filing received date
    Timestamp DOB received a per-building LL97 compliance filing.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Good-faith effort application
    Whether an owner has applied for a good-faith effort determination and its status.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Mediated resolution application
    Application for the LL97 mediated resolution process and its outcome.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Notice of deficiency status
    Whether a notice of deficiency has been issued for a building and its current stage.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Per-building filing status
    Filing status for each covered BBL/BIN combination (filed / late / non-filed / exempt) as tracked in DOB's BEAM system.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Pre-OATH correspondence
    DOB correspondence with owners before an OATH matter is opened (notice of deficiency, cure letters).
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • RDP attestation
    Registered Design Professional attestation attached to each per-building compliance filing.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • RECs / offsets claimed
    Renewable Energy Credits and beneficial-use offsets claimed to reduce reported emissions.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • 60-day cure window
    The 60-day cure window state for a building under LL97 enforcement (open / cured / expired).
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
Every number on this page traces back to a Socrata dataset row or a CBL PDF revision. Where DOB does not publish a computable field (pathway, internal BEAM stage, compliance decision), we say so on the record instead of hiding the gap. See methodology.