NYC Prototypes
Skip to main content
BBL 1008130064 · BIN 1015263 · Manhattan · Block 00813, Lot 0064

515 7TH AVENUE

Article 320Pathway source: CBL PDF row · CP0_article_320_2024CBL revision date 2026-06-16Open CBL source PDF
Buildings on lot 1
← Buildings

Article 320 · numerical caps & computed exposure

How this is computed
PeriodOccupancyGFACapActualDeltaEst. penaltyStatusMethodology
2024-29S-2(high)33,061 sqft140.8 tCO2e1,343.9 tCO2e+1,203$322,415
Over cap
v1.0
2030-34S-2(high)33,061 sqft36.4 tCO2e1,343.9 tCO2e+1,307.5$350,413
Over cap
v1.0

Cap = Σ (occupancy_coefficient × gross_floor_area) using DOB LL97 rules; actual GHG is the most recent LL84 filing. Delta is positive when actual exceeds cap. Estimated penalty is DOB's public $268/tCO2e × delta with a 30-day grace applied via penalty_estimate_usd.

LL84 GHG emissions history

Actual tCO2e reported to LL84 by report year. Each bar links to the raw LL84 row identifier under the chart for auditability.

2021531.2 tCO2e2022637.5 tCO2e2023855.5 tCO2e20241,343.9 tCO2e
YearProperty typeGHGProperty GFASite EUISource EUIES scoreSource
2021Office531.2 tCO2e102,836 sqft72.8141.4567x5e-2fxh / 3772766
2022Parking637.5 tCO2e33,061 sqft266.9551.4-5zyy-y8am / 24127172
2023Parking855.5 tCO2e33,061 sqft318.2601.3-5zyy-y8am / 24127172
2024Parking1,343.9 tCO2e33,061 sqft571.4870.1-5zyy-y8am / 24127172

Enforcement events (all DOB + ECB + OATH data cross-linked to this BBL)

Open on enforcement page →
0 LL97-specific events · 12 building-scoped context events.
DOB violation filed0 LL97 · 4 scoped
ECB summons issued0 LL97 · 3 scoped
Safety context record0 LL97 · 5 scoped
StageEvent dateViolationSeverityStatusPenaltySource
Safety context recordbuilding-scoped2025-09-18
FTF-PL-PER
Cycle 1, Sub-cycle B (premises is in Community District 5)
-Active-855j-jady
DOB violation filedbuilding-scoped2025-05-22
C-CONSTRUCTION OTHER OPTIONAL
VEHICLE STRUCK ONE SUPPORT AND MOVED IT APPROXIMATELY 12"
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9
Safety context recordbuilding-scoped2024-12-31
FTC-PS-UNSAFE
Unsafe report of parking structures filed.
-Active-855j-jady
Safety context recordbuilding-scoped2024-11-25
FTF-PS-INITL
Failure to file sub cycle 1A compliance report by 12/31/2023
-Active-855j-jady
ECB summons issuedbuilding-scoped2024-07-09
Construction
28-201.1 UNLAWFUL ACTS. FAILURE TO COMPLY WITH AN ORDER OF THE COMMISSIONER
ECB #35685571X
CLASS - 1ACTIVE$2,5306bgk-3dad
DOB violation filedbuilding-scoped2024-06-12
AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
-V*-DOB VIOLATION - DISMISSED-3h2n-5cm9
Safety context recordbuilding-scoped2024-06-12
FTC-AEU-HAZ
-Dismissed-855j-jady
DOB violation filedbuilding-scoped2024-05-29
AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
-V*-DOB VIOLATION - DISMISSED-3h2n-5cm9
Safety context recordbuilding-scoped2024-05-29
FTC-AEU-HAZ
-Dismissed-855j-jady
ECB summons issuedbuilding-scoped2024-03-22
Construction
27-/28-/BC-MISC MISCELLANEOUS VIOLATIONS
ECB #35682432M
CLASS - 1RESOLVE$2,5006bgk-3dad
ECB summons issuedbuilding-scoped2024-03-22
Construction
27-/28-/BC-MISC MISCELLANEOUS VIOLATIONS
ECB #35682433Y
CLASS - 1RESOLVE$2,5006bgk-3dad
DOB violation filedbuilding-scoped2024-03-22
C-CONSTRUCTION OTHER OPTIONAL
EMERG WORK ORD.ON AN ACTIVE PS SPALLING CONCRETE EXPOSED REBAR/STEEL BEAM AT ALL FLOORS @ SEVERAL LOCATIONS CAUSING HAZARD TO TRAFFIC REMEDY: OWNER TO RETAIN NYS REG DESIGN PROF (RDP) TO SUPERVISE INSTALLTION OF SAFETY MEASURES. (RDP) IS TO PROVIDE DAILY PROGRESS REPORT TO PARKINGSTRUCTURE@BUILDINGS.NYC.GOV
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9

Records are the union of DOB Violations (3h2n-5cm9), ECB (6bgk-3dad), Safety Violations (855j-jady), OATH Hearings (jz4z-kudi), and OATH Trials (y3hw-z6bm) that we could link back to this BBL via BIN or address parsing. Events not tagged LL97-specific are shown as building-scoped context. See methodology · enforcement linking.

Data quality flags

  • default_value_reportedSee methodology for the exact definition of this flag; behavior may vary by pathway or period.

Full flag catalog: methodology · data quality flags

Fields we cannot show here (internal DOB data not yet public)

Processing lifecycle

DOB's internal BEAM system tracks per-building compliance stages, RCE / decarbonization plans, and mitigation credits. Those fields are not yet published as an open dataset. When DOB releases them, this product will show them here without a schema migration. Until then, the following are known gaps for this building:

  • Assessed penalty (vs theoretical)
    Actual penalty DOB assessed against a building, distinct from the theoretical over-cap exposure computed from LL84 emissions.
    Simulated · internal DOB data not yet public
    Best-effort shadow field: ecb_summons_issued
    Public release status: announced_not_yet_released
  • Audit assignment
    Buildings selected by DOB for LL97 filing audit and the audit stage.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Audit outcome
    Result of an LL97 audit (accepted / correction ordered / penalty referred).
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Extension flag
    Whether a per-building filing was accepted under a filing extension (June 30 grace or BEAM extension to August 29).
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Filing received date
    Timestamp DOB received a per-building LL97 compliance filing.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Good-faith effort application
    Whether an owner has applied for a good-faith effort determination and its status.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Mediated resolution application
    Application for the LL97 mediated resolution process and its outcome.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Notice of deficiency status
    Whether a notice of deficiency has been issued for a building and its current stage.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Per-building filing status
    Filing status for each covered BBL/BIN combination (filed / late / non-filed / exempt) as tracked in DOB's BEAM system.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Pre-OATH correspondence
    DOB correspondence with owners before an OATH matter is opened (notice of deficiency, cure letters).
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • RDP attestation
    Registered Design Professional attestation attached to each per-building compliance filing.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • RECs / offsets claimed
    Renewable Energy Credits and beneficial-use offsets claimed to reduce reported emissions.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • 60-day cure window
    The 60-day cure window state for a building under LL97 enforcement (open / cured / expired).
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
Every number on this page traces back to a Socrata dataset row or a CBL PDF revision. Where DOB does not publish a computable field (pathway, internal BEAM stage, compliance decision), we say so on the record instead of hiding the gap. See methodology.