329 2ND AVENUE
CP3_article_321_one_timeCBL revision date 2026-06-16Open CBL source PDFArticle 321 · prescriptive compliance pathway
This building is on the Article 321 pathway. Article 321 does not use a numerical cap; compliance is demonstrated via the prescriptive measures package (per methodology · Article 321), which DOB does not currently publish per building. Cap, delta, and penalty columns are intentionally suppressed on Article 321 rows in this product.
LL84 GHG emissions history
Actual tCO2e reported to LL84 by report year. Each bar links to the raw LL84 row identifier under the chart for auditability.
| Year | Property type | GHG | Property GFA | Site EUI | Source EUI | ES score | Source |
|---|---|---|---|---|---|---|---|
| 2021 | Multifamily Housing | 1,305 tCO2e | 272,000 sqft | 79.6 | 115.4 | 69 | 7x5e-2fxh / 2669295 |
| 2022 | Multifamily Housing | 1,348.8 tCO2e | 272,000 sqft | 80.8 | 122.0 | 64 | 5zyy-y8am / 2669295 |
| 2023 | Multifamily Housing | 1,343.6 tCO2e | 272,000 sqft | 72.6 | 109.3 | 71 | 5zyy-y8am / 2669295 |
| 2024 | Multifamily Housing | 1,430.7 tCO2e | 272,000 sqft | 75.8 | 114.4 | 66 | 5zyy-y8am / 2669295 |
Enforcement events (all DOB + ECB + OATH data cross-linked to this BBL)
Open on enforcement page →| Stage | Event date | Violation | Severity | Status | Penalty | Source |
|---|---|---|---|---|---|---|
| DOB violation filedbuilding-scoped | 2026-05-05 | C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER.AS NOTED AT TH E TIME OF INSPECTION,I OBSERVED ON EXP2 WEST ELEV,DAMAGED/CRACKED MORT AR JOINTS AROUND BRICK.AT 11TH FLOOR LINTEL BRICK;ON EXP3 NORTH ELEV C RACK IN BALCONY CONCRETE RAILING BASE ON THE 12TH FLOOR;SPALLING/MISSI NG BRICK ON 18TH FL SETBACK PARAPET.REMEDY:REPAIR AND/OR REPLACE DAMAG | - | V-DOB VIOLATION - ACTIVE | - | 3h2n-5cm9 |
| ECB summons issuedbuilding-scoped | 2026-05-05 | Construction BC 3307.6,27-1021 SIDEWALK SHED DOES NOT MEET CODE SPECIFICATIONS ECB #35726814J | CLASS - 2 | RESOLVE | $2,400 | 6bgk-3dad |
| Safety context recordbuilding-scoped | 2026-03-17 | FTC-AEU-HAZ | - | Dismissed | - | 855j-jady |
| Safety context recordbuilding-scoped | 2026-03-17 | FTC-AEU-HAZ | - | Dismissed | - | 855j-jady |
| Safety context recordbuilding-scoped | 2026-03-06 | FTP-EN-EGRDEA FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER AD CODE SEC. 28-309.12.3 | - | Active | - | 855j-jady |
| DOB violation filedbuilding-scoped | 2025-09-24 | C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN PARKING STRUCTURE.AS NOTED,THE PARKING STRUCTURE O VERHEAD SLAB NEAR THE SW CORNER IF VISIBLY DEFECTED.QPSI EDG SUBMITTED REPORT NOTING THAT THEIR STRUCTURAL ANALYSIS CONFIRMED THE EXISTING RE INFORCEMENT IN THE SLAB IS UNDERSIZED FOR THE EXPECTED LOADS.REMEDY:IM PLEMENT SAFETY MEASURES SHORING UNDER THE SUPERVISION OF A QPSI | - | V*-DOB VIOLATION - DISMISSED | - | 3h2n-5cm9 |
| ECB summons issuedbuilding-scoped | 2025-09-17 | Construction 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER ECB #39160682M | CLASS - 2 | RESOLVE | $0 | 6bgk-3dad |
| DOB violation filedbuilding-scoped | 2025-07-19 | C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN.THE 1-STORY EXTERIOR WALL ALNG THE EXP3(REAR/WEST) PROPERTY LINE IS A RELINGUISHD PRTY WALL SERVNG AS THE UNDERGROUND PRKNG STRCTRE ENTRANCE FACADE WALL&IN A STATE OF EXT DSRPR.1.NYSPE STRCTRL ENG TO IMMED EVAL ENT OF THESE 2 WALLS IN DISREPAIR&DSGN RPAIRS,2.FILE FOR RPAIRS BY 8/30/24,3.OBTN PRMT | - | V*-DOB VIOLATION - DISMISSED | - | 3h2n-5cm9 |
| DOB violation filedbuilding-scoped | 2025-03-21 | C-CONSTRUCTION OTHER OPTIONAL EWO PARKING STRUCTUR CONSIST OF 2 LVL, OBSERVED DEFLECTING SLAB @ SUB CELLAR LVL. REMDY:RETAIN A NYS RDP TO DIRECT/SUPERV THE IMMEDITE INSTA -LLATIN OF SAFTY MEAS & PROVIDE SHORNG OF THE FAILED STRUCTURL ELEMENT WORK TO BE UNDER F/T SUPERV OF NYS RDP & PROVIDE REPORTS TO PARKING @BUILDING.NYC.GOV.PROTECT SHORED/UNSAFE AREA, ENSURING CLEAR DELINEATN | - | V*-DOB VIOLATION - DISMISSED | - | 3h2n-5cm9 |
| ECB summons issuedbuilding-scoped | 2025-03-21 | Construction 27-/28-/BC-MISC MISCELLANEOUS VIOLATIONS ECB #35716674H | CLASS - 1 | RESOLVE | $2,500 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2025-03-21 | Construction 27-/28-/BC-MISC MISCELLANEOUS VIOLATIONS ECB #35716672Y | CLASS - 1 | RESOLVE | $2,500 | 6bgk-3dad |
| Safety context recordbuilding-scoped | 2024-12-31 | FTC-PS-UNSAFE Unsafe report of parking structures filed. | - | Active | - | 855j-jady |
| DOB violation filedbuilding-scoped | 2024-10-18 | C-CONSTRUCTION OTHER OPTIONAL ADDITIONAL INFO.FEU OBSRVED A RETAINING WALL ADJ TO PROPRTY LINE ABUTTNG 241 E19TH ST IN DISREPAIR W/MULT LARGE CRCKS&NAREA W/OUTWRD BULGE.CRCK GAUGES WERE OBSRVD ON MULT CRCKS W/MVMNT.1.IMMED ESTABLSH MONITORNG CAMPAING AS PER NYSPE,MONITORNG RPORTS TO DOB FEU W/ INTERPRETATION OF STBILITY | - | V*-DOB VIOLATION - DISMISSED | - | 3h2n-5cm9 |
| DOB violation filedbuilding-scoped | 2024-07-19 | C-CONSTRUCTION OTHER OPTIONAL MASONRY RETAINING WALLS LOCATED AT WEST COURTYARD ALONG PROPERTY LINE WITH ADJACENT VACANT LOT AT 241 EAST 19TH ST ARE IN DISREPAIR WITH SIGNIFICANT VERTICAL CRACKS IN WALLS EXTENDING FROM TOP OF WALL TO BOTTOM OF WALL. NOTE CRACKS ARE IN VICINITY OF EMERGENCY EXIT FROM PARKING GARAGE TO COURTYARD. | - | V*-DOB VIOLATION - DISMISSED | - | 3h2n-5cm9 |
| DOB violation filedbuilding-scoped | 2024-07-19 | C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN. MASONRY RETAINING WALLS LOCATED AT WEST COURTYARD ALONG PROPERTY LINE WITH ADJACENT VACANT LOT AT 241 EAST 19TH ST ARE IN DISREPAIR WITH SIGNIFICANT VERTICAL CRACKS IN WALLS EXTENDING FROM TOP OF WALL TO BOTTOM OF WALL. NOTE CRACKS ARE IN VICINITY OF EMERGENCY EXIT FROM PARKING GARAGE TO COURTYARD. | - | V*-DOB VIOLATION - DISMISSED | - | 3h2n-5cm9 |
Records are the union of DOB Violations (3h2n-5cm9), ECB (6bgk-3dad), Safety Violations (855j-jady), OATH Hearings (jz4z-kudi), and OATH Trials (y3hw-z6bm) that we could link back to this BBL via BIN or address parsing. Events not tagged LL97-specific are shown as building-scoped context. See methodology · enforcement linking.
Data quality flags
- default_value_reportedSee methodology for the exact definition of this flag; behavior may vary by pathway or period.
Full flag catalog: methodology · data quality flags
Fields we cannot show here (internal DOB data not yet public)
Processing lifecycleDOB's internal BEAM system tracks per-building compliance stages, RCE / decarbonization plans, and mitigation credits. Those fields are not yet published as an open dataset. When DOB releases them, this product will show them here without a schema migration. Until then, the following are known gaps for this building:
- Simulated · internal DOB data not yet publicAssessed penalty (vs theoretical)Actual penalty DOB assessed against a building, distinct from the theoretical over-cap exposure computed from LL84 emissions.Best-effort shadow field:
ecb_summons_issuedPublic release status: announced_not_yet_released - Simulated · internal DOB data not yet publicAudit assignmentBuildings selected by DOB for LL97 filing audit and the audit stage.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicAudit outcomeResult of an LL97 audit (accepted / correction ordered / penalty referred).Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicExtension flagWhether a per-building filing was accepted under a filing extension (June 30 grace or BEAM extension to August 29).Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicFiling received dateTimestamp DOB received a per-building LL97 compliance filing.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicGood-faith effort applicationWhether an owner has applied for a good-faith effort determination and its status.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicMediated resolution applicationApplication for the LL97 mediated resolution process and its outcome.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicNotice of deficiency statusWhether a notice of deficiency has been issued for a building and its current stage.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicPer-building filing statusFiling status for each covered BBL/BIN combination (filed / late / non-filed / exempt) as tracked in DOB's BEAM system.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicPre-OATH correspondenceDOB correspondence with owners before an OATH matter is opened (notice of deficiency, cure letters).Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicRDP attestationRegistered Design Professional attestation attached to each per-building compliance filing.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicRECs / offsets claimedRenewable Energy Credits and beneficial-use offsets claimed to reduce reported emissions.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet public60-day cure windowThe 60-day cure window state for a building under LL97 enforcement (open / cured / expired).Public release status: announced_not_yet_released