NYC Prototypes
Skip to main content
BBL 1009000027 · BIN 1019603 · Manhattan · Block 00900, Lot 0027

329 2ND AVENUE

Article 321Pathway source: CBL PDF row · CP3_article_321_one_timeCBL revision date 2026-06-16Open CBL source PDF
Buildings on lot 1
← Buildings

Article 321 · prescriptive compliance pathway

This building is on the Article 321 pathway. Article 321 does not use a numerical cap; compliance is demonstrated via the prescriptive measures package (per methodology · Article 321), which DOB does not currently publish per building. Cap, delta, and penalty columns are intentionally suppressed on Article 321 rows in this product.

2024-29
Occupancy: R-2
GFA: 272,000 sqft
Methodology: v1.0
2030-34
Occupancy: R-2
GFA: 272,000 sqft
Methodology: v1.0

LL84 GHG emissions history

Actual tCO2e reported to LL84 by report year. Each bar links to the raw LL84 row identifier under the chart for auditability.

20211,305 tCO2e20221,348.8 tCO2e20231,343.6 tCO2e20241,430.7 tCO2e
YearProperty typeGHGProperty GFASite EUISource EUIES scoreSource
2021Multifamily Housing1,305 tCO2e272,000 sqft79.6115.4697x5e-2fxh / 2669295
2022Multifamily Housing1,348.8 tCO2e272,000 sqft80.8122.0645zyy-y8am / 2669295
2023Multifamily Housing1,343.6 tCO2e272,000 sqft72.6109.3715zyy-y8am / 2669295
2024Multifamily Housing1,430.7 tCO2e272,000 sqft75.8114.4665zyy-y8am / 2669295

Enforcement events (all DOB + ECB + OATH data cross-linked to this BBL)

Open on enforcement page →
0 LL97-specific events · 15 building-scoped context events.
DOB violation filed0 LL97 · 7 scoped
ECB summons issued0 LL97 · 4 scoped
Safety context record0 LL97 · 4 scoped
StageEvent dateViolationSeverityStatusPenaltySource
DOB violation filedbuilding-scoped2026-05-05
C-CONSTRUCTION OTHER OPTIONAL
FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER.AS NOTED AT TH E TIME OF INSPECTION,I OBSERVED ON EXP2 WEST ELEV,DAMAGED/CRACKED MORT AR JOINTS AROUND BRICK.AT 11TH FLOOR LINTEL BRICK;ON EXP3 NORTH ELEV C RACK IN BALCONY CONCRETE RAILING BASE ON THE 12TH FLOOR;SPALLING/MISSI NG BRICK ON 18TH FL SETBACK PARAPET.REMEDY:REPAIR AND/OR REPLACE DAMAG
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9
ECB summons issuedbuilding-scoped2026-05-05
Construction
BC 3307.6,27-1021 SIDEWALK SHED DOES NOT MEET CODE SPECIFICATIONS
ECB #35726814J
CLASS - 2RESOLVE$2,4006bgk-3dad
Safety context recordbuilding-scoped2026-03-17
FTC-AEU-HAZ
-Dismissed-855j-jady
Safety context recordbuilding-scoped2026-03-17
FTC-AEU-HAZ
-Dismissed-855j-jady
Safety context recordbuilding-scoped2026-03-06
FTP-EN-EGRDEA
FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER AD CODE SEC. 28-309.12.3
-Active-855j-jady
DOB violation filedbuilding-scoped2025-09-24
C-CONSTRUCTION OTHER OPTIONAL
FAILURE TO MAINTAIN PARKING STRUCTURE.AS NOTED,THE PARKING STRUCTURE O VERHEAD SLAB NEAR THE SW CORNER IF VISIBLY DEFECTED.QPSI EDG SUBMITTED REPORT NOTING THAT THEIR STRUCTURAL ANALYSIS CONFIRMED THE EXISTING RE INFORCEMENT IN THE SLAB IS UNDERSIZED FOR THE EXPECTED LOADS.REMEDY:IM PLEMENT SAFETY MEASURES SHORING UNDER THE SUPERVISION OF A QPSI
-V*-DOB VIOLATION - DISMISSED-3h2n-5cm9
ECB summons issuedbuilding-scoped2025-09-17
Construction
28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER
ECB #39160682M
CLASS - 2RESOLVE$06bgk-3dad
DOB violation filedbuilding-scoped2025-07-19
C-CONSTRUCTION OTHER OPTIONAL
FAILURE TO MAINTAIN.THE 1-STORY EXTERIOR WALL ALNG THE EXP3(REAR/WEST) PROPERTY LINE IS A RELINGUISHD PRTY WALL SERVNG AS THE UNDERGROUND PRKNG STRCTRE ENTRANCE FACADE WALL&IN A STATE OF EXT DSRPR.1.NYSPE STRCTRL ENG TO IMMED EVAL ENT OF THESE 2 WALLS IN DISREPAIR&DSGN RPAIRS,2.FILE FOR RPAIRS BY 8/30/24,3.OBTN PRMT
-V*-DOB VIOLATION - DISMISSED-3h2n-5cm9
DOB violation filedbuilding-scoped2025-03-21
C-CONSTRUCTION OTHER OPTIONAL
EWO PARKING STRUCTUR CONSIST OF 2 LVL, OBSERVED DEFLECTING SLAB @ SUB CELLAR LVL. REMDY:RETAIN A NYS RDP TO DIRECT/SUPERV THE IMMEDITE INSTA -LLATIN OF SAFTY MEAS & PROVIDE SHORNG OF THE FAILED STRUCTURL ELEMENT WORK TO BE UNDER F/T SUPERV OF NYS RDP & PROVIDE REPORTS TO PARKING @BUILDING.NYC.GOV.PROTECT SHORED/UNSAFE AREA, ENSURING CLEAR DELINEATN
-V*-DOB VIOLATION - DISMISSED-3h2n-5cm9
ECB summons issuedbuilding-scoped2025-03-21
Construction
27-/28-/BC-MISC MISCELLANEOUS VIOLATIONS
ECB #35716674H
CLASS - 1RESOLVE$2,5006bgk-3dad
ECB summons issuedbuilding-scoped2025-03-21
Construction
27-/28-/BC-MISC MISCELLANEOUS VIOLATIONS
ECB #35716672Y
CLASS - 1RESOLVE$2,5006bgk-3dad
Safety context recordbuilding-scoped2024-12-31
FTC-PS-UNSAFE
Unsafe report of parking structures filed.
-Active-855j-jady
DOB violation filedbuilding-scoped2024-10-18
C-CONSTRUCTION OTHER OPTIONAL
ADDITIONAL INFO.FEU OBSRVED A RETAINING WALL ADJ TO PROPRTY LINE ABUTTNG 241 E19TH ST IN DISREPAIR W/MULT LARGE CRCKS&NAREA W/OUTWRD BULGE.CRCK GAUGES WERE OBSRVD ON MULT CRCKS W/MVMNT.1.IMMED ESTABLSH MONITORNG CAMPAING AS PER NYSPE,MONITORNG RPORTS TO DOB FEU W/ INTERPRETATION OF STBILITY
-V*-DOB VIOLATION - DISMISSED-3h2n-5cm9
DOB violation filedbuilding-scoped2024-07-19
C-CONSTRUCTION OTHER OPTIONAL
MASONRY RETAINING WALLS LOCATED AT WEST COURTYARD ALONG PROPERTY LINE WITH ADJACENT VACANT LOT AT 241 EAST 19TH ST ARE IN DISREPAIR WITH SIGNIFICANT VERTICAL CRACKS IN WALLS EXTENDING FROM TOP OF WALL TO BOTTOM OF WALL. NOTE CRACKS ARE IN VICINITY OF EMERGENCY EXIT FROM PARKING GARAGE TO COURTYARD.
-V*-DOB VIOLATION - DISMISSED-3h2n-5cm9
DOB violation filedbuilding-scoped2024-07-19
C-CONSTRUCTION OTHER OPTIONAL
FAILURE TO MAINTAIN. MASONRY RETAINING WALLS LOCATED AT WEST COURTYARD ALONG PROPERTY LINE WITH ADJACENT VACANT LOT AT 241 EAST 19TH ST ARE IN DISREPAIR WITH SIGNIFICANT VERTICAL CRACKS IN WALLS EXTENDING FROM TOP OF WALL TO BOTTOM OF WALL. NOTE CRACKS ARE IN VICINITY OF EMERGENCY EXIT FROM PARKING GARAGE TO COURTYARD.
-V*-DOB VIOLATION - DISMISSED-3h2n-5cm9

Records are the union of DOB Violations (3h2n-5cm9), ECB (6bgk-3dad), Safety Violations (855j-jady), OATH Hearings (jz4z-kudi), and OATH Trials (y3hw-z6bm) that we could link back to this BBL via BIN or address parsing. Events not tagged LL97-specific are shown as building-scoped context. See methodology · enforcement linking.

Data quality flags

  • default_value_reportedSee methodology for the exact definition of this flag; behavior may vary by pathway or period.

Full flag catalog: methodology · data quality flags

Fields we cannot show here (internal DOB data not yet public)

Processing lifecycle

DOB's internal BEAM system tracks per-building compliance stages, RCE / decarbonization plans, and mitigation credits. Those fields are not yet published as an open dataset. When DOB releases them, this product will show them here without a schema migration. Until then, the following are known gaps for this building:

  • Assessed penalty (vs theoretical)
    Actual penalty DOB assessed against a building, distinct from the theoretical over-cap exposure computed from LL84 emissions.
    Simulated · internal DOB data not yet public
    Best-effort shadow field: ecb_summons_issued
    Public release status: announced_not_yet_released
  • Audit assignment
    Buildings selected by DOB for LL97 filing audit and the audit stage.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Audit outcome
    Result of an LL97 audit (accepted / correction ordered / penalty referred).
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Extension flag
    Whether a per-building filing was accepted under a filing extension (June 30 grace or BEAM extension to August 29).
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Filing received date
    Timestamp DOB received a per-building LL97 compliance filing.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Good-faith effort application
    Whether an owner has applied for a good-faith effort determination and its status.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Mediated resolution application
    Application for the LL97 mediated resolution process and its outcome.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Notice of deficiency status
    Whether a notice of deficiency has been issued for a building and its current stage.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Per-building filing status
    Filing status for each covered BBL/BIN combination (filed / late / non-filed / exempt) as tracked in DOB's BEAM system.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Pre-OATH correspondence
    DOB correspondence with owners before an OATH matter is opened (notice of deficiency, cure letters).
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • RDP attestation
    Registered Design Professional attestation attached to each per-building compliance filing.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • RECs / offsets claimed
    Renewable Energy Credits and beneficial-use offsets claimed to reduce reported emissions.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • 60-day cure window
    The 60-day cure window state for a building under LL97 enforcement (open / cured / expired).
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
Every number on this page traces back to a Socrata dataset row or a CBL PDF revision. Where DOB does not publish a computable field (pathway, internal BEAM stage, compliance decision), we say so on the record instead of hiding the gap. See methodology.