250 WEST 50TH STREET
CP2_article_320_2035CBL revision date 2026-06-16Open CBL source PDFArticle 320 · numerical caps & computed exposure
How this is computed| Period | Occupancy | GFA | Cap | Actual | Delta | Est. penalty | Status | Methodology |
|---|---|---|---|---|---|---|---|---|
| 2024-29 | R-2(high) | 533,099 sqft | 3,598.4 tCO2e | 4,271.9 tCO2e | +673.5 | $180,498 | Over cap | v1.0 |
| 2030-34 | R-2(high) | 533,099 sqft | 2,169.7 tCO2e | 4,271.9 tCO2e | +2,102.2 | $563,391 | Over cap | v1.0 |
Cap = Σ (occupancy_coefficient × gross_floor_area) using DOB LL97 rules; actual GHG is the most recent LL84 filing. Delta is positive when actual exceeds cap. Estimated penalty is DOB's public $268/tCO2e × delta with a 30-day grace applied via penalty_estimate_usd.
LL84 GHG emissions history
Actual tCO2e reported to LL84 by report year. Each bar links to the raw LL84 row identifier under the chart for auditability.
| Year | Property type | GHG | Property GFA | Site EUI | Source EUI | ES score | Source |
|---|---|---|---|---|---|---|---|
| 2021 | Multifamily Housing | 3,271.1 tCO2e | 533,099 sqft | 100.7 | 172.4 | 10 | 7x5e-2fxh / 4156458 |
| 2022 | Multifamily Housing | 3,460 tCO2e | 533,099 sqft | 100.4 | 169.9 | 13 | 5zyy-y8am / 4156458 |
| 2023 | Multifamily Housing | 3,628.3 tCO2e | 533,099 sqft | 90.6 | 157.9 | 15 | 5zyy-y8am / 4156458 |
| 2024 | Multifamily Housing | 4,271.9 tCO2e | 533,099 sqft | 101.8 | 180.5 | 6 | 5zyy-y8am / 4156458 |
Enforcement events (all DOB + ECB + OATH data cross-linked to this BBL)
Open on enforcement page →| Stage | Event date | Violation | Severity | Status | Penalty | Source |
|---|---|---|---|---|---|---|
| ECB summons issuedbuilding-scoped | 2026-06-29 | Elevators 28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLAINT MANNER:SERVICE EQUIPMEN ECB #39194180H | CLASS - 2 | ACTIVE | $625 | 6bgk-3dad |
| Safety context recordbuilding-scoped | 2026-03-17 | FTC-AEU-HAZ | - | Active | - | 855j-jady |
| ECB summons issuedbuilding-scoped | 2025-08-21 | Elevators 28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLAINT MANNER:SERVICE EQUIPMEN ECB #39157988H | CLASS - 2 | RESOLVE | $310 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2025-08-21 | Elevators 28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLAINT MANNER:SERVICE EQUIPMEN ECB #39157989J | CLASS - 1 | ACTIVE | $625 | 6bgk-3dad |
| DOB violation filedbuilding-scoped | 2024-06-23 | EARCX-FAILURE TO SUBMIT EER NONE FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 IN 2023 | - | V*-DOB VIOLATION - DISMISSED | - | 3h2n-5cm9 |
| Safety context recordbuilding-scoped | 2024-06-23 | FTF-EN-EARCX | - | Dismissed | - | 855j-jady |
Records are the union of DOB Violations (3h2n-5cm9), ECB (6bgk-3dad), Safety Violations (855j-jady), OATH Hearings (jz4z-kudi), and OATH Trials (y3hw-z6bm) that we could link back to this BBL via BIN or address parsing. Events not tagged LL97-specific are shown as building-scoped context. See methodology · enforcement linking.
Fields we cannot show here (internal DOB data not yet public)
Processing lifecycleDOB's internal BEAM system tracks per-building compliance stages, RCE / decarbonization plans, and mitigation credits. Those fields are not yet published as an open dataset. When DOB releases them, this product will show them here without a schema migration. Until then, the following are known gaps for this building:
- Simulated · internal DOB data not yet publicAssessed penalty (vs theoretical)Actual penalty DOB assessed against a building, distinct from the theoretical over-cap exposure computed from LL84 emissions.Best-effort shadow field:
ecb_summons_issuedPublic release status: announced_not_yet_released - Simulated · internal DOB data not yet publicAudit assignmentBuildings selected by DOB for LL97 filing audit and the audit stage.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicAudit outcomeResult of an LL97 audit (accepted / correction ordered / penalty referred).Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicExtension flagWhether a per-building filing was accepted under a filing extension (June 30 grace or BEAM extension to August 29).Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicFiling received dateTimestamp DOB received a per-building LL97 compliance filing.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicGood-faith effort applicationWhether an owner has applied for a good-faith effort determination and its status.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicMediated resolution applicationApplication for the LL97 mediated resolution process and its outcome.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicNotice of deficiency statusWhether a notice of deficiency has been issued for a building and its current stage.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicPer-building filing statusFiling status for each covered BBL/BIN combination (filed / late / non-filed / exempt) as tracked in DOB's BEAM system.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicPre-OATH correspondenceDOB correspondence with owners before an OATH matter is opened (notice of deficiency, cure letters).Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicRDP attestationRegistered Design Professional attestation attached to each per-building compliance filing.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicRECs / offsets claimedRenewable Energy Credits and beneficial-use offsets claimed to reduce reported emissions.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet public60-day cure windowThe 60-day cure window state for a building under LL97 enforcement (open / cured / expired).Public release status: announced_not_yet_released