NYC Prototypes
Skip to main content
BBL 1010280017 · BIN 1024894 · Manhattan · Block 01028, Lot 0017

1752 BROADWAY

Article 320Pathway source: CBL PDF row · CP1_article_320_2026CBL revision date 2026-06-16Open CBL source PDF
Buildings on lot 1
← Buildings

Article 320 · numerical caps & computed exposure

How this is computed
PeriodOccupancyGFACapActualDeltaEst. penaltyStatusMethodology
2024-29R-2(high)249,089 sqft1,681.4 tCO2e2,024 tCO2e+342.7$91,841
Over cap
v1.0
2030-34R-2(high)249,089 sqft1,013.8 tCO2e2,024 tCO2e+1,010.2$270,746
Over cap
v1.0

Cap = Σ (occupancy_coefficient × gross_floor_area) using DOB LL97 rules; actual GHG is the most recent LL84 filing. Delta is positive when actual exceeds cap. Estimated penalty is DOB's public $268/tCO2e × delta with a 30-day grace applied via penalty_estimate_usd.

LL84 GHG emissions history

Actual tCO2e reported to LL84 by report year. Each bar links to the raw LL84 row identifier under the chart for auditability.

20212,421.5 tCO2e20222,971.6 tCO2e20231,948.1 tCO2e20242,024 tCO2e
YearProperty typeGHGProperty GFASite EUISource EUIES scoreSource
2021Multifamily Housing2,421.5 tCO2e344,775 sqft124.2166.597x5e-2fxh / 4491465
2022Multifamily Housing2,971.6 tCO2e289,265 sqft178.4231.815zyy-y8am / 4491465
2023Multifamily Housing1,948.1 tCO2e289,265 sqft102.5145.3325zyy-y8am / 4491465
2024Multifamily Housing2,024 tCO2e249,089 sqft123.0174.1245zyy-y8am / 55447492

Enforcement events (all DOB + ECB + OATH data cross-linked to this BBL)

Open on enforcement page →
0 LL97-specific events · 7 building-scoped context events.
DOB violation filed0 LL97 · 1 scoped
ECB summons issued0 LL97 · 6 scoped
StageEvent dateViolationSeverityStatusPenaltySource
DOB violation filedbuilding-scoped2026-03-06
C-CONSTRUCTION OTHER OPTIONAL
FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. AT THE TIME OF INSPECTION OBSERVED DEFECTED CONDITIONS AT EXPOSURE 1 SOUTH ELEVATION DAMAGED MASONRY ABOVE MAIN ENTRANCE LINTEL AND OPEN STONE JOINT CORNER OF EXPOSURE 1 AND 4. REMEDY: REPAIR AND OR REPLACE
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9
ECB summons issuedbuilding-scoped2025-01-10
Construction
BC3307.1.1/BC3307.4.6 POSTING OF UNLAWFUL SIGNS/INFO/PICTURES/ADS ON PROTECTIVE STRUCTURES
ECB #39135210J
CLASS - 2RESOLVE$06bgk-3dad
ECB summons issuedbuilding-scoped2024-12-18
Elevators
28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER: SERVICE EQUIPME
ECB #39133194J
CLASS - 1RESOLVE$1,2506bgk-3dad
ECB summons issuedbuilding-scoped2024-12-18
Elevators
28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER: SERVICE EQUIPME
ECB #39133192X
CLASS - 1RESOLVE$1,2506bgk-3dad
ECB summons issuedbuilding-scoped2024-12-18
Elevators
28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER: SERVICE EQUIPME
ECB #39133195L
CLASS - 1RESOLVE$1,2506bgk-3dad
ECB summons issuedbuilding-scoped2024-12-18
Elevators
28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER: SERVICE EQUIPME
ECB #39133191Y
CLASS - 1RESOLVE$1,2506bgk-3dad
ECB summons issuedbuilding-scoped2024-12-18
Elevators
28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER: SERVICE EQUIPME
ECB #39133193H
CLASS - 1RESOLVE$1,2506bgk-3dad

Records are the union of DOB Violations (3h2n-5cm9), ECB (6bgk-3dad), Safety Violations (855j-jady), OATH Hearings (jz4z-kudi), and OATH Trials (y3hw-z6bm) that we could link back to this BBL via BIN or address parsing. Events not tagged LL97-specific are shown as building-scoped context. See methodology · enforcement linking.

Data quality flags

  • default_value_reportedSee methodology for the exact definition of this flag; behavior may vary by pathway or period.

Full flag catalog: methodology · data quality flags

Fields we cannot show here (internal DOB data not yet public)

Processing lifecycle

DOB's internal BEAM system tracks per-building compliance stages, RCE / decarbonization plans, and mitigation credits. Those fields are not yet published as an open dataset. When DOB releases them, this product will show them here without a schema migration. Until then, the following are known gaps for this building:

  • Assessed penalty (vs theoretical)
    Actual penalty DOB assessed against a building, distinct from the theoretical over-cap exposure computed from LL84 emissions.
    Simulated · internal DOB data not yet public
    Best-effort shadow field: ecb_summons_issued
    Public release status: announced_not_yet_released
  • Audit assignment
    Buildings selected by DOB for LL97 filing audit and the audit stage.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Audit outcome
    Result of an LL97 audit (accepted / correction ordered / penalty referred).
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Extension flag
    Whether a per-building filing was accepted under a filing extension (June 30 grace or BEAM extension to August 29).
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Filing received date
    Timestamp DOB received a per-building LL97 compliance filing.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Good-faith effort application
    Whether an owner has applied for a good-faith effort determination and its status.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Mediated resolution application
    Application for the LL97 mediated resolution process and its outcome.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Notice of deficiency status
    Whether a notice of deficiency has been issued for a building and its current stage.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Per-building filing status
    Filing status for each covered BBL/BIN combination (filed / late / non-filed / exempt) as tracked in DOB's BEAM system.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Pre-OATH correspondence
    DOB correspondence with owners before an OATH matter is opened (notice of deficiency, cure letters).
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • RDP attestation
    Registered Design Professional attestation attached to each per-building compliance filing.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • RECs / offsets claimed
    Renewable Energy Credits and beneficial-use offsets claimed to reduce reported emissions.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • 60-day cure window
    The 60-day cure window state for a building under LL97 enforcement (open / cured / expired).
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
Every number on this page traces back to a Socrata dataset row or a CBL PDF revision. Where DOB does not publish a computable field (pathway, internal BEAM stage, compliance decision), we say so on the record instead of hiding the gap. See methodology.