1 COLUMBUS CIRCLE
CP0_article_320_2024CBL revision date 2026-06-16Open CBL source PDFArticle 320 · numerical caps & computed exposure
How this is computed| Period | Occupancy | GFA | Cap | Actual | Delta | Est. penalty | Status | Methodology |
|---|---|---|---|---|---|---|---|---|
| 2024-29 | B(ambiguous) | 2,598,958 sqft | 21,987 tCO2e | 29,493 tCO2e | +7,506 | $2,011,607 | Over cap | v1.0 |
| 2030-34 | B(ambiguous) | 2,598,958 sqft | 11,773 tCO2e | 29,493 tCO2e | +17,720 | $4,748,933 | Over cap | v1.0 |
Cap = Σ (occupancy_coefficient × gross_floor_area) using DOB LL97 rules; actual GHG is the most recent LL84 filing. Delta is positive when actual exceeds cap. Estimated penalty is DOB's public $268/tCO2e × delta with a 30-day grace applied via penalty_estimate_usd.
LL84 GHG emissions history
Actual tCO2e reported to LL84 by report year. Each bar links to the raw LL84 row identifier under the chart for auditability.
| Year | Property type | GHG | Property GFA | Site EUI | Source EUI | ES score | Source |
|---|---|---|---|---|---|---|---|
| 2021 | Mixed Use Property | 17,377 tCO2e | 2,588,546 sqft | 95.5 | 204.4 | - | 7x5e-2fxh / 1261447 |
| 2022 | Mixed Use Property | 22,959 tCO2e | 2,588,546 sqft | 117.0 | 243.1 | - | 5zyy-y8am / 1261447 |
| 2023 | Mixed Use Property | 26,970 tCO2e | 2,588,546 sqft | 118.4 | 241.2 | - | 5zyy-y8am / 1261447 |
| 2024 | Mixed Use Property | 29,493 tCO2e | 2,598,958 sqft | 124.5 | 253.2 | - | 5zyy-y8am / 1261447 |
Enforcement events (all DOB + ECB + OATH data cross-linked to this BBL)
Open on enforcement page →| Stage | Event date | Violation | Severity | Status | Penalty | Source |
|---|---|---|---|---|---|---|
| Safety context recordbuilding-scoped | 2025-10-10 | FTC-VT-CAT1-NJ Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction | - | Dismissed | - | 855j-jady |
| Safety context recordbuilding-scoped | 2025-10-10 | FTC-VT-CAT1-CO Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction | - | Dismissed | - | 855j-jady |
| Safety context recordbuilding-scoped | 2025-10-10 | FTC-VT-PER-CO Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction | - | Active | - | 855j-jady |
| Safety context recordbuilding-scoped | 2025-10-10 | FTC-VT-PER-CO Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction | - | Dismissed | - | 855j-jady |
| Safety context recordbuilding-scoped | 2025-10-10 | FTC-VT-PER-CO Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction | - | Active | - | 855j-jady |
| Safety context recordbuilding-scoped | 2025-10-10 | FTC-VT-PER-CO Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction | - | Active | - | 855j-jady |
| Safety context recordbuilding-scoped | 2025-10-10 | FTC-VT-PER-CO Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction | - | Dismissed | - | 855j-jady |
| Safety context recordbuilding-scoped | 2025-10-10 | FTC-VT-PER-CO Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction | - | Active | - | 855j-jady |
| Safety context recordbuilding-scoped | 2025-10-10 | FTC-VT-PER-CO Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction | - | Active | - | 855j-jady |
| Safety context recordbuilding-scoped | 2025-10-10 | FTC-VT-PER-CO Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction | - | Dismissed | - | 855j-jady |
| Safety context recordbuilding-scoped | 2025-10-10 | FTC-VT-PER-CO Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction | - | Active | - | 855j-jady |
| Safety context recordbuilding-scoped | 2025-10-10 | FTC-VT-CAT1-CO Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction | - | Dismissed | - | 855j-jady |
| Safety context recordbuilding-scoped | 2025-10-10 | FTC-VT-PER-CO Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction | - | Dismissed | - | 855j-jady |
| Safety context recordbuilding-scoped | 2025-10-10 | FTC-VT-PER-CO Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction | - | Dismissed | - | 855j-jady |
| Safety context recordbuilding-scoped | 2025-10-10 | FTC-VT-PER-CO Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction | - | Dismissed | - | 855j-jady |
| Safety context recordbuilding-scoped | 2025-10-10 | FTC-VT-PER-CO Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction | - | Dismissed | - | 855j-jady |
| Safety context recordbuilding-scoped | 2025-10-10 | FTC-VT-PER-CO Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction | - | Dismissed | - | 855j-jady |
| Safety context recordbuilding-scoped | 2025-10-10 | FTC-VT-PER-CO Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction | - | Dismissed | - | 855j-jady |
| Safety context recordbuilding-scoped | 2025-10-10 | FTC-VT-PER-CO Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction | - | Dismissed | - | 855j-jady |
| Safety context recordbuilding-scoped | 2025-10-10 | FTC-VT-PER-CO Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction | - | Dismissed | - | 855j-jady |
| Safety context recordbuilding-scoped | 2025-10-10 | FTC-VT-PER-CO Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction | - | Dismissed | - | 855j-jady |
| Safety context recordbuilding-scoped | 2025-10-10 | FTC-VT-PER-CO Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction | - | Dismissed | - | 855j-jady |
| Safety context recordbuilding-scoped | 2025-10-10 | FTC-VT-CAT1-CO Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction | - | Dismissed | - | 855j-jady |
| Safety context recordbuilding-scoped | 2025-10-10 | FTC-VT-PER-CO Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction | - | Dismissed | - | 855j-jady |
| Safety context recordbuilding-scoped | 2025-10-10 | FTC-VT-PER-CO Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction | - | Dismissed | - | 855j-jady |
| Safety context recordbuilding-scoped | 2025-10-10 | FTC-VT-PER-CO Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction | - | Dismissed | - | 855j-jady |
| Safety context recordbuilding-scoped | 2025-10-10 | FTC-VT-PER-CO Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction | - | Dismissed | - | 855j-jady |
| Safety context recordbuilding-scoped | 2025-10-10 | FTC-VT-CAT1-CO Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction | - | Dismissed | - | 855j-jady |
| Safety context recordbuilding-scoped | 2025-10-10 | FTC-VT-PER-CO Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction | - | Dismissed | - | 855j-jady |
| DOB violation filedbuilding-scoped | 2025-09-16 | C-CONSTRUCTION OTHER OPTIONAL STRUCTURE RENDERED NON COMPLIANT DUE TO BROKEN WINDOWS AT 4TH FLOOR. WINDOWS WERE VANDALIZED BY UNKNOWN FOREIGN OBJECT WHICH CAUSED THE OUTER GLASS PANES TO SHATTER. | - | V*-DOB VIOLATION - DISMISSED | - | 3h2n-5cm9 |
| Safety context recordbuilding-scoped | 2025-08-29 | FTF-VT-CAT1-NJ Violation Issued-Failure To File 2024 Cat1 Test Report | - | Active | - | 855j-jady |
| ECB summons issuedbuilding-scoped | 2025-04-30 | Elevators 28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER: SERVICE EQUIPME ECB #39146661M | CLASS - 1 | RESOLVE | $3,125 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2025-04-04 | Site Safety BC 3301.7 (2014 CODE) FAILURE TO MAINTAIN/DISPLAY ON SITE DOCUMENTS REQUIRED BY BC CHAPTER 3 ECB #39143908L | CLASS - 1 | RESOLVE | $2,500 | 6bgk-3dad |
| DOB violation filedbuilding-scoped | 2025-02-28 | C-CONSTRUCTION OTHER OPTIONAL AT TIME OF INSPECTION INSPECTION BEING CONDUCTED BY BUILDING ENGINEER USING DAVIT SYSTEM. BASKET MADE CONTACT WITH 3 WINDOWS AT APT.78 LEVEL FOR UNKNOWN REASON CAUSING WINDOWS TO BREAK. | - | V*-DOB VIOLATION - DISMISSED | - | 3h2n-5cm9 |
| DOB violation filedbuilding-scoped | 2025-01-08 | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION | - | V*-DOB VIOLATION - DISMISSED | - | 3h2n-5cm9 |
| DOB violation filedbuilding-scoped | 2025-01-08 | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION | - | V*-DOB VIOLATION - DISMISSED | - | 3h2n-5cm9 |
| Safety context recordbuilding-scoped | 2025-01-08 | FTC-AEU-HAZ | - | Dismissed | - | 855j-jady |
| Safety context recordbuilding-scoped | 2025-01-08 | FTC-AEU-HAZ | - | Dismissed | - | 855j-jady |
| ECB summons issuedbuilding-scoped | 2024-10-31 | Elevators 28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER: SERVICE EQUIPME ECB #39129074N | CLASS - 1 | RESOLVE | $1,280 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2024-10-31 | Elevators 28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER: SERVICE EQUIPME ECB #39129075P | CLASS - 1 | RESOLVE | $1,280 | 6bgk-3dad |
| Safety context recordbuilding-scoped | 2024-10-11 | FTC-VT-CAT1-CO Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction | - | Dismissed | - | 855j-jady |
| Safety context recordbuilding-scoped | 2024-10-11 | FTC-VT-CAT1-CO Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction | - | Dismissed | - | 855j-jady |
| Safety context recordbuilding-scoped | 2024-10-11 | FTC-VT-CAT1-CO Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction | - | Dismissed | - | 855j-jady |
| Safety context recordbuilding-scoped | 2024-10-11 | FTC-VT-CAT1-CO Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction | - | Dismissed | - | 855j-jady |
| Safety context recordbuilding-scoped | 2024-10-11 | FTC-VT-CAT1-CO Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction | - | Dismissed | - | 855j-jady |
| Safety context recordbuilding-scoped | 2024-10-11 | FTC-VT-CAT1-CO Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction | - | Dismissed | - | 855j-jady |
| Safety context recordbuilding-scoped | 2024-10-11 | FTC-VT-CAT1-CO Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction | - | Dismissed | - | 855j-jady |
| Safety context recordbuilding-scoped | 2024-10-11 | FTC-VT-CAT1-CO Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction | - | Dismissed | - | 855j-jady |
| Safety context recordbuilding-scoped | 2024-10-11 | FTC-VT-CAT1-CO Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction | - | Dismissed | - | 855j-jady |
| Safety context recordbuilding-scoped | 2024-10-11 | FTC-VT-CAT1-CO Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction | - | Dismissed | - | 855j-jady |
| Safety context recordbuilding-scoped | 2024-10-11 | FTC-VT-CAT1-CO Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction | - | Dismissed | - | 855j-jady |
| Safety context recordbuilding-scoped | 2024-10-11 | FTC-VT-CAT1-CO Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction | - | Dismissed | - | 855j-jady |
| Safety context recordbuilding-scoped | 2024-10-11 | FTC-VT-PER-CO Violation Issued-Failure To File 2023 Periodic Inspection Affirmation of Correction | - | Dismissed | - | 855j-jady |
| Safety context recordbuilding-scoped | 2024-10-11 | FTC-VT-PER-CO Violation Issued-Failure To File 2023 Periodic Inspection Affirmation of Correction | - | Dismissed | - | 855j-jady |
| Safety context recordbuilding-scoped | 2024-10-11 | FTC-VT-CAT1-CO Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction | - | Dismissed | - | 855j-jady |
| Safety context recordbuilding-scoped | 2024-10-11 | FTC-VT-PER-CO Violation Issued-Failure To File 2023 Periodic Inspection Affirmation of Correction | - | Dismissed | - | 855j-jady |
| Safety context recordbuilding-scoped | 2024-10-11 | FTC-VT-CAT1-CO Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction | - | Dismissed | - | 855j-jady |
| Safety context recordbuilding-scoped | 2024-10-11 | FTC-VT-CAT1-CO Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction | - | Dismissed | - | 855j-jady |
| Safety context recordbuilding-scoped | 2024-10-11 | FTC-VT-CAT1-CO Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction | - | Dismissed | - | 855j-jady |
| Safety context recordbuilding-scoped | 2024-10-11 | FTC-VT-CAT1-CO Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction | - | Dismissed | - | 855j-jady |
| Safety context recordbuilding-scoped | 2024-09-11 | FTF-VT-PER-CO Violation Issued-Failure To File 2023 Periodic Inspection Report | - | Dismissed | - | 855j-jady |
| Safety context recordbuilding-scoped | 2024-09-11 | FTF-VT-CAT1-CO Violation Issued-Failure To File 2023 Cat1 Test Report | - | Dismissed | - | 855j-jady |
| Safety context recordbuilding-scoped | 2024-09-11 | FTF-VT-CAT1-NJ Violation Issued-Failure To File 2023 Cat1 Test Report | - | Active | - | 855j-jady |
| ECB summons issuedbuilding-scoped | 2024-05-10 | Construction 28-201.1 UNLAWFUL ACTS. FAILURE TO COMPLY WITH AN ORDER OF THE COMMISSIONER ECB #39114058L | CLASS - 1 | RESOLVE | $0 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2024-02-14 | Construction 28-201.1 UNLAWFUL ACTS. FAILURE TO COMPLY WITH AN ORDER OF THE COMMISSIONER ECB #39106003Y | CLASS - 1 | RESOLVE | $2,500 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2024-02-08 | Elevators 28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER: SERVICE EQUIPME ECB #39105630Z | CLASS - 1 | RESOLVE | $1,250 | 6bgk-3dad |
Records are the union of DOB Violations (3h2n-5cm9), ECB (6bgk-3dad), Safety Violations (855j-jady), OATH Hearings (jz4z-kudi), and OATH Trials (y3hw-z6bm) that we could link back to this BBL via BIN or address parsing. Events not tagged LL97-specific are shown as building-scoped context. See methodology · enforcement linking.
Data quality flags
- default_value_reportedSee methodology for the exact definition of this flag; behavior may vary by pathway or period.
- temporary_value_reportedSee methodology for the exact definition of this flag; behavior may vary by pathway or period.
Full flag catalog: methodology · data quality flags
Fields we cannot show here (internal DOB data not yet public)
Processing lifecycleDOB's internal BEAM system tracks per-building compliance stages, RCE / decarbonization plans, and mitigation credits. Those fields are not yet published as an open dataset. When DOB releases them, this product will show them here without a schema migration. Until then, the following are known gaps for this building:
- Simulated · internal DOB data not yet publicAssessed penalty (vs theoretical)Actual penalty DOB assessed against a building, distinct from the theoretical over-cap exposure computed from LL84 emissions.Best-effort shadow field:
ecb_summons_issuedPublic release status: announced_not_yet_released - Simulated · internal DOB data not yet publicAudit assignmentBuildings selected by DOB for LL97 filing audit and the audit stage.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicAudit outcomeResult of an LL97 audit (accepted / correction ordered / penalty referred).Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicExtension flagWhether a per-building filing was accepted under a filing extension (June 30 grace or BEAM extension to August 29).Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicFiling received dateTimestamp DOB received a per-building LL97 compliance filing.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicGood-faith effort applicationWhether an owner has applied for a good-faith effort determination and its status.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicMediated resolution applicationApplication for the LL97 mediated resolution process and its outcome.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicNotice of deficiency statusWhether a notice of deficiency has been issued for a building and its current stage.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicPer-building filing statusFiling status for each covered BBL/BIN combination (filed / late / non-filed / exempt) as tracked in DOB's BEAM system.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicPre-OATH correspondenceDOB correspondence with owners before an OATH matter is opened (notice of deficiency, cure letters).Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicRDP attestationRegistered Design Professional attestation attached to each per-building compliance filing.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicRECs / offsets claimedRenewable Energy Credits and beneficial-use offsets claimed to reduce reported emissions.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet public60-day cure windowThe 60-day cure window state for a building under LL97 enforcement (open / cured / expired).Public release status: announced_not_yet_released