240 WEST 73RD STREET
CP0_article_320_2024CBL revision date 2026-06-16Open CBL source PDFArticle 320 · numerical caps & computed exposure
How this is computed| Period | Occupancy | GFA | Cap | Actual | Delta | Est. penalty | Status | Methodology |
|---|---|---|---|---|---|---|---|---|
| 2024-29 | R-2(high) | 116,940 sqft | 789.3 tCO2e | 1,403.1 tCO2e | +613.7 | $164,476 | Over cap | v1.0 |
| 2030-34 | R-2(high) | 116,940 sqft | 475.9 tCO2e | 1,403.1 tCO2e | +927.1 | $248,467 | Over cap | v1.0 |
Cap = Σ (occupancy_coefficient × gross_floor_area) using DOB LL97 rules; actual GHG is the most recent LL84 filing. Delta is positive when actual exceeds cap. Estimated penalty is DOB's public $268/tCO2e × delta with a 30-day grace applied via penalty_estimate_usd.
LL84 GHG emissions history
Actual tCO2e reported to LL84 by report year. Each bar links to the raw LL84 row identifier under the chart for auditability.
| Year | Property type | GHG | Property GFA | Site EUI | Source EUI | ES score | Source |
|---|---|---|---|---|---|---|---|
| 2021 | Multifamily Housing | 510.5 tCO2e | 110,504 sqft | 76.4 | 127.8 | 76 | 7x5e-2fxh / 2630596 |
| 2022 | Multifamily Housing | 1,206.7 tCO2e | 110,504 sqft | 171.2 | 281.5 | 1 | 5zyy-y8am / 2630596 |
| 2024 | Multifamily Housing | 1,403.1 tCO2e | 116,940 sqft | 161.8 | 266.0 | 27 | 5zyy-y8am / 64856192 |
Enforcement events (all DOB + ECB + OATH data cross-linked to this BBL)
Open on enforcement page →| Stage | Event date | Violation | Severity | Status | Penalty | Source |
|---|---|---|---|---|---|---|
| ECB summons issuedbuilding-scoped | 2026-04-20 | Local Law 28-302.5 FAILURE TO FILE AN AMENDED REPORT ACCEPTABLE TO THIS DEPARTMENT INDICA ECB #37036483Z | CLASS - 2 | ACTIVE | $3,125 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2026-04-13 | Elevators 28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER: SERVICE EQUIPME ECB #39184236Z | CLASS - 1 | RESOLVE | $1,250 | 6bgk-3dad |
| DOB violation filedbuilding-scoped | 2026-04-08 | C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. AT TIME OF INSPECTION, OBSERVED VERTICAL STEP CRACKS & EXPOSURE 1, EXPOSURE 2 & EXPOSURE 4. AT EXPOSURE 3, DAMAGED & DETERIORATED WINDOW SILL OBSERVED. WATER TANK IS LEAKING AT THE ROOF. REMEDY: REPAIR AND/OR REPLACE | - | V-DOB VIOLATION - ACTIVE | - | 3h2n-5cm9 |
| ECB summons issuedbuilding-scoped | 2026-01-08 | Elevators 28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER: SERVICE EQUIPME ECB #39173122R | CLASS - 1 | RESOLVE | $1,250 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2025-10-29 | Elevators 28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER: SERVICE EQUIPME ECB #39166017J | CLASS - 1 | RESOLVE | $1,250 | 6bgk-3dad |
| DOB violation filedbuilding-scoped | 2025-09-09 | C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER. AS NOTED AT TIME OF INSPECTION OBSERVED VERTICLE STEP CRACKS AT EXPOSURE 1 AND EXPOSURE 2 AND DAMAGED AND DETERIORATED WINDOW SILL AT EXPOSURE 3 REMEDY: REPAIR AND/OR REPLACE | - | V-DOB VIOLATION - ACTIVE | - | 3h2n-5cm9 |
| DOB violation filedbuilding-scoped | 2024-11-26 | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION | - | V-DOB VIOLATION - ACTIVE | - | 3h2n-5cm9 |
| Safety context recordbuilding-scoped | 2024-11-26 | FTC-AEU-HAZ | - | Active | - | 855j-jady |
| ECB summons issuedbuilding-scoped | 2024-11-14 | Construction 28-302.1 FAILURE TO MAINTAIN BLDG WALL(S) OR APPURTENANCES ECB #35686591H | CLASS - 2 | ACTIVE | $6,250 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2024-09-25 | Construction 28-302.1 FAILURE TO MAINTAIN BLDG WALL(S) OR APPURTENANCES ECB #35686625R | CLASS - 1 | ACTIVE | $12,500 | 6bgk-3dad |
| DOB violation filedbuilding-scoped | 2024-09-18 | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION | - | V*-DOB VIOLATION - DISMISSED | - | 3h2n-5cm9 |
| Safety context recordbuilding-scoped | 2024-09-18 | FTC-AEU-HAZ | - | Dismissed | - | 855j-jady |
| Safety context recordbuilding-scoped | 2024-09-11 | FTF-VT-CAT1-CO Violation Issued-Failure To File 2023 Cat1 Test Report | - | Active | - | 855j-jady |
| Safety context recordbuilding-scoped | 2024-09-11 | FTF-VT-PER-CO Violation Issued-Failure To File 2023 Periodic Inspection Report | - | Active | - | 855j-jady |
| Safety context recordbuilding-scoped | 2024-09-11 | FTF-VT-PER-CO Violation Issued-Failure To File 2023 Periodic Inspection Report | - | Active | - | 855j-jady |
| Safety context recordbuilding-scoped | 2024-09-11 | FTF-VT-PER-CO Violation Issued-Failure To File 2023 Periodic Inspection Report | - | Active | - | 855j-jady |
| Safety context recordbuilding-scoped | 2024-09-11 | FTF-VT-CAT1-CO Violation Issued-Failure To File 2023 Cat1 Test Report | - | Active | - | 855j-jady |
| Safety context recordbuilding-scoped | 2024-09-11 | FTF-VT-CAT1-CO Violation Issued-Failure To File 2023 Cat1 Test Report | - | Active | - | 855j-jady |
| ECB summons issuedbuilding-scoped | 2024-07-17 | Elevators 28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER: SERVICE EQUIPME ECB #39119329R | CLASS - 1 | RESOLVE | $1,250 | 6bgk-3dad |
| Safety context recordbuilding-scoped | 2024-05-29 | FTC-AEU-HAZ | - | Dismissed | - | 855j-jady |
| DOB violation filedbuilding-scoped | 2024-05-29 | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION | - | V*-DOB VIOLATION - DISMISSED | - | 3h2n-5cm9 |
| DOB violation filedbuilding-scoped | 2024-03-26 | C-CONSTRUCTION OTHER OPTIONAL THE DOB HEREBY ORDERS YOU TO STOP ALL WORK UNDER JOB #140991880 AT FACADE - EXCEPT TO MAKE SITE SAFE - DUE TO APPLICANT WITHDRAWAL | - | V-DOB VIOLATION - ACTIVE | - | 3h2n-5cm9 |
| DOB violation filedbuilding-scoped | 2024-03-26 | C-CONSTRUCTION OTHER OPTIONAL THE DOB HEREBY ORDERS YOU TO STOP ALL WORK UNDER JOB #140991880 AT FACADE - EXCEPT TO MAKE SITE SAFE - DUE TO APPLICANT WITHDRAWAL | - | V-DOB VIOLATION - ACTIVE | - | 3h2n-5cm9 |
| DOB violation filedbuilding-scoped | 2024-03-25 | C-CONSTRUCTION OTHER OPTIONAL THE DOB HEREBY ORDERS YOU TO STOP ALL WORK UNDER JOB #140899240 - EXCEPT TO MAKE SITE SAFE - DUE TO APPLICANT WITHDRAWAL | - | V-DOB VIOLATION - ACTIVE | - | 3h2n-5cm9 |
| DOB violation filedbuilding-scoped | 2024-03-25 | C-CONSTRUCTION OTHER OPTIONAL THE DOB HEREBY ORDERS YOU TO STOP ALL WORK UNDER JOB #140899240 IMMEDIATELY - EXCEPT TO MAKE SITE SAFE - DUE TO APPLICANT WITHDRAWAL | - | V-DOB VIOLATION - ACTIVE | - | 3h2n-5cm9 |
| ECB summons issuedbuilding-scoped | 2024-03-20 | Elevators 28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER: SERVICE EQUIPME ECB #39109376K | CLASS - 1 | RESOLVE | $1,250 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2024-01-16 | Local Law 28-302.5 FAILURE TO FILE AN AMENDED REPORT ACCEPTABLE TO THIS DEPARTMENT INDICA ECB #37026345L | CLASS - 2 | ACTIVE | $6,250 | 6bgk-3dad |
Records are the union of DOB Violations (3h2n-5cm9), ECB (6bgk-3dad), Safety Violations (855j-jady), OATH Hearings (jz4z-kudi), and OATH Trials (y3hw-z6bm) that we could link back to this BBL via BIN or address parsing. Events not tagged LL97-specific are shown as building-scoped context. See methodology · enforcement linking.
Fields we cannot show here (internal DOB data not yet public)
Processing lifecycleDOB's internal BEAM system tracks per-building compliance stages, RCE / decarbonization plans, and mitigation credits. Those fields are not yet published as an open dataset. When DOB releases them, this product will show them here without a schema migration. Until then, the following are known gaps for this building:
- Simulated · internal DOB data not yet publicAssessed penalty (vs theoretical)Actual penalty DOB assessed against a building, distinct from the theoretical over-cap exposure computed from LL84 emissions.Best-effort shadow field:
ecb_summons_issuedPublic release status: announced_not_yet_released - Simulated · internal DOB data not yet publicAudit assignmentBuildings selected by DOB for LL97 filing audit and the audit stage.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicAudit outcomeResult of an LL97 audit (accepted / correction ordered / penalty referred).Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicExtension flagWhether a per-building filing was accepted under a filing extension (June 30 grace or BEAM extension to August 29).Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicFiling received dateTimestamp DOB received a per-building LL97 compliance filing.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicGood-faith effort applicationWhether an owner has applied for a good-faith effort determination and its status.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicMediated resolution applicationApplication for the LL97 mediated resolution process and its outcome.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicNotice of deficiency statusWhether a notice of deficiency has been issued for a building and its current stage.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicPer-building filing statusFiling status for each covered BBL/BIN combination (filed / late / non-filed / exempt) as tracked in DOB's BEAM system.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicPre-OATH correspondenceDOB correspondence with owners before an OATH matter is opened (notice of deficiency, cure letters).Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicRDP attestationRegistered Design Professional attestation attached to each per-building compliance filing.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicRECs / offsets claimedRenewable Energy Credits and beneficial-use offsets claimed to reduce reported emissions.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet public60-day cure windowThe 60-day cure window state for a building under LL97 enforcement (open / cured / expired).Public release status: announced_not_yet_released