781 5TH AVENUE
CP0_article_320_2024CBL revision date 2026-06-16Open CBL source PDFArticle 320 · numerical caps & computed exposure
How this is computed| Period | Occupancy | GFA | Cap | Actual | Delta | Est. penalty | Status | Methodology |
|---|---|---|---|---|---|---|---|---|
| 2024-29 | B(ambiguous) | 314,509 sqft | 2,660.7 tCO2e | 3,495.7 tCO2e | +834.9 | $223,757 | Over cap | v1.0 |
| 2030-34 | B(ambiguous) | 314,509 sqft | 1,424.7 tCO2e | 3,495.7 tCO2e | +2,070.9 | $555,010 | Over cap | v1.0 |
Cap = Σ (occupancy_coefficient × gross_floor_area) using DOB LL97 rules; actual GHG is the most recent LL84 filing. Delta is positive when actual exceeds cap. Estimated penalty is DOB's public $268/tCO2e × delta with a 30-day grace applied via penalty_estimate_usd.
LL84 GHG emissions history
Actual tCO2e reported to LL84 by report year. Each bar links to the raw LL84 row identifier under the chart for auditability.
| Year | Property type | GHG | Property GFA | Site EUI | Source EUI | ES score | Source |
|---|---|---|---|---|---|---|---|
| 2021 | Mixed Use Property | 2,829.8 tCO2e | 314,509 sqft | 123.4 | 220.3 | - | 7x5e-2fxh / 15500581 |
| 2022 | Mixed Use Property | 2,932.8 tCO2e | 314,509 sqft | 127.9 | 228.2 | - | 5zyy-y8am / 15500581 |
| 2023 | Mixed Use Property | 3,470.9 tCO2e | 314,509 sqft | 134.4 | 244.2 | - | 5zyy-y8am / 15500581 |
| 2024 | Mixed Use Property | 3,495.7 tCO2e | 314,509 sqft | 130.8 | 239.5 | - | 5zyy-y8am / 15500581 |
Enforcement events (all DOB + ECB + OATH data cross-linked to this BBL)
Open on enforcement page →| Stage | Event date | Violation | Severity | Status | Penalty | Source |
|---|---|---|---|---|---|---|
| Safety context recordbuilding-scoped | 2026-06-15 | FTC-AEU-HAZ | - | Active | - | 855j-jady |
| ECB summons issuedbuilding-scoped | 2026-05-06 | Construction 28-105.12.2 WRK DOESN'T CONFORM TO APPROV DOCS AND/OR APPROV AMENDMENTS ECB #39553877J | CLASS - 2 | ACTIVE | $1,250 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2026-05-06 | Construction 28-105.12.2 WRK DOESN'T CONFORM TO APPROV DOCS AND/OR APPROV AMENDMENTS ECB #39553876H | CLASS - 2 | ACTIVE | $1,250 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2026-05-06 | Unknown ECB #39553875X | CLASS - 1 | ACTIVE | $5,000 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2026-05-06 | Cranes and Derricks BC 3314.1.1 & 27-1050.1 FAILED TO NOTIFY DEPARTMENT/OBTAIN PERMIT PRIOR TO USE/INST. OFF C-HOO ECB #39553874Y | CLASS - 2 | RESOLVE | $800 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2026-02-05 | Unknown ECB #39549997M | CLASS - 1 | RESOLVE | $5,000 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2025-09-30 | Construction 28-105.12.2 WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR APPROV ECB #39545488X | CLASS - 1 | RESOLVE | $6,250 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2025-09-30 | Unknown ECB #39545489H | CLASS - 1 | RESOLVE | $5,000 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2025-09-30 | Construction BC 3301.2,27-1009(A) FAIL TO SAFEGUARD PERS/PROPERTY AFFECTED BY CONSTRUCTION OP ECB #39545509X | CLASS - 1 | RESOLVE | $10,000 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2025-07-09 | Construction BC 3301.2,27-1009(A) FAIL TO SAFEGUARD PERS/PROPERTY AFFECTED BY CONSTRUCTION OP ECB #39542200Y | CLASS - 2 | ACTIVE | $5,000 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2025-01-14 | Unknown ECB #39535964Z | CLASS - 1 | RESOLVE | $0 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2024-12-18 | Construction BC 3301.1.3 (2014 CODE) FAILURE TO COMPLY WITH MANUFACTURER SPECIFICATIONS ECB #39535233P | CLASS - 1 | RESOLVE | $2,530 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2024-12-18 | Construction BC 3301.2,27-1009(A) FAIL TO SAFEGUARD PERS/PROPERTY AFFECTED BY CONSTRUCTION OP ECB #39535232N | CLASS - 1 | RESOLVE | $25,000 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2024-04-03 | Construction BC3307.1.1/BC3307.4.6 POSTING OF UNLAWFUL SIGNS/INFO/PICTURES/ADS ON PROTECTIVE STRUCTURES ECB #39527067Z | CLASS - 2 | RESOLVE | $2,500 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2024-04-03 | Construction BC 3307.6,27-1021 SIDEWALK SHED DOES NOT MEET CODE SPECIFICATIONS ECB #39527062J | CLASS - 2 | RESOLVE | $2,400 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2024-04-03 | Construction BC 3301.9,27-10009(C) FAIL TO PROVIDE/POST SIGN(S) AT JB SITE PURSUANT TO SUBSEC ECB #39527070J | CLASS - 2 | RESOLVE | $0 | 6bgk-3dad |
Records are the union of DOB Violations (3h2n-5cm9), ECB (6bgk-3dad), Safety Violations (855j-jady), OATH Hearings (jz4z-kudi), and OATH Trials (y3hw-z6bm) that we could link back to this BBL via BIN or address parsing. Events not tagged LL97-specific are shown as building-scoped context. See methodology · enforcement linking.
Fields we cannot show here (internal DOB data not yet public)
Processing lifecycleDOB's internal BEAM system tracks per-building compliance stages, RCE / decarbonization plans, and mitigation credits. Those fields are not yet published as an open dataset. When DOB releases them, this product will show them here without a schema migration. Until then, the following are known gaps for this building:
- Simulated · internal DOB data not yet publicAssessed penalty (vs theoretical)Actual penalty DOB assessed against a building, distinct from the theoretical over-cap exposure computed from LL84 emissions.Best-effort shadow field:
ecb_summons_issuedPublic release status: announced_not_yet_released - Simulated · internal DOB data not yet publicAudit assignmentBuildings selected by DOB for LL97 filing audit and the audit stage.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicAudit outcomeResult of an LL97 audit (accepted / correction ordered / penalty referred).Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicExtension flagWhether a per-building filing was accepted under a filing extension (June 30 grace or BEAM extension to August 29).Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicFiling received dateTimestamp DOB received a per-building LL97 compliance filing.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicGood-faith effort applicationWhether an owner has applied for a good-faith effort determination and its status.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicMediated resolution applicationApplication for the LL97 mediated resolution process and its outcome.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicNotice of deficiency statusWhether a notice of deficiency has been issued for a building and its current stage.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicPer-building filing statusFiling status for each covered BBL/BIN combination (filed / late / non-filed / exempt) as tracked in DOB's BEAM system.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicPre-OATH correspondenceDOB correspondence with owners before an OATH matter is opened (notice of deficiency, cure letters).Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicRDP attestationRegistered Design Professional attestation attached to each per-building compliance filing.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicRECs / offsets claimedRenewable Energy Credits and beneficial-use offsets claimed to reduce reported emissions.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet public60-day cure windowThe 60-day cure window state for a building under LL97 enforcement (open / cured / expired).Public release status: announced_not_yet_released