325 EAST 60 STREET
CP0_article_320_2024CBL revision date 2026-06-16Open CBL source PDFArticle 320 · numerical caps & computed exposure
How this is computed| Period | Occupancy | GFA | Cap | Actual | Delta | Est. penalty | Status | Methodology |
|---|---|---|---|---|---|---|---|---|
| 2024-29 | A(high) | 95,500 sqft | 1,025.7 tCO2e | 2,264.2 tCO2e | +1,238.5 | $331,929 | Over cap | v1.0 |
| 2030-34 | A(high) | 95,500 sqft | 401.1 tCO2e | 2,264.2 tCO2e | +1,863.1 | $499,313 | Over cap | v1.0 |
Cap = Σ (occupancy_coefficient × gross_floor_area) using DOB LL97 rules; actual GHG is the most recent LL84 filing. Delta is positive when actual exceeds cap. Estimated penalty is DOB's public $268/tCO2e × delta with a 30-day grace applied via penalty_estimate_usd.
LL84 GHG emissions history
Actual tCO2e reported to LL84 by report year. Each bar links to the raw LL84 row identifier under the chart for auditability.
| Year | Property type | GHG | Property GFA | Site EUI | Source EUI | ES score | Source |
|---|---|---|---|---|---|---|---|
| 2021 | Fitness Center/Health Club/Gym | 1,347.8 tCO2e | 95,500 sqft | 215.8 | 450.9 | - | 7x5e-2fxh / 3526401 |
| 2022 | Fitness Center/Health Club/Gym | 1,717.5 tCO2e | 95,500 sqft | 254.1 | 516.8 | - | 5zyy-y8am / 16507231 |
| 2023 | Fitness Center/Health Club/Gym | 2,039.3 tCO2e | 95,500 sqft | 255.2 | 513.4 | - | 5zyy-y8am / 16507231 |
| 2024 | Fitness Center/Health Club/Gym | 2,264.2 tCO2e | 95,500 sqft | 279.5 | 543.8 | - | 5zyy-y8am / 16507231 |
Enforcement events (all DOB + ECB + OATH data cross-linked to this BBL)
Open on enforcement page →| Stage | Event date | Violation | Severity | Status | Penalty | Source |
|---|---|---|---|---|---|---|
| DOB violation filedbuilding-scoped | 2026-04-28 | C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER. NOTED, AT THE TIME OF INSPECTION I OBSERVED LONG VERTICAL CRACKS AT MULTIPLE LOCATIONS ON ALL EXPOSURES. DETERIORATED MORTAR JOINTS OBSERVED ON EXPOSURE 2 AND EXPOSURE 4. REMEDY: REPAIR AND/OR REPLACE | - | V-DOB VIOLATION - ACTIVE | - | 3h2n-5cm9 |
| ECB summons issuedbuilding-scoped | 2026-04-28 | Construction BC 3307.6,27-1021 SIDEWALK SHED DOES NOT MEET CODE SPECIFICATIONS ECB #35727061Z | CLASS - 2 | RESOLVE | $2,400 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2026-03-19 | Construction 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER ECB #39181121P | CLASS - 1 | ACTIVE | $2,500 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2026-02-19 | Construction AC 28-204.4 FAIL TO COMPLY W/COMMISSIONER ORDER TO FILE CERT OF CORRECTION W/DOB ECB #39177846K | CLASS - 2 | RESOLVE | $0 | 6bgk-3dad |
| DOB violation filedbuilding-scoped | 2025-04-30 | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION | - | V*-DOB VIOLATION - DISMISSED | - | 3h2n-5cm9 |
| Safety context recordbuilding-scoped | 2025-04-30 | FTC-AEU-HAZ | - | Dismissed | - | 855j-jady |
| DOB violation filedbuilding-scoped | 2025-01-08 | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION | - | V*-DOB VIOLATION - DISMISSED | - | 3h2n-5cm9 |
| Safety context recordbuilding-scoped | 2025-01-08 | FTC-AEU-HAZ | - | Active | - | 855j-jady |
| ECB summons issuedbuilding-scoped | 2024-11-07 | Construction 28-105.12.2 WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR APPROV ECB #39129690R | CLASS - 1 | RESOLVE | $0 | 6bgk-3dad |
| DOB violation filedbuilding-scoped | 2024-10-03 | C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. OBSERVED CRACKS ON MASONRY AT SEVERAL LOCATIONS ON EXP#1;2;3&4 (N,E,S & W ELEV).ALSO OBSERVED LOOSE/MISSING MORTAR JOINT AT PARAPET LEVEL OF EXP#4 W.ELEV, & STEP CRACKS AT ROOF BULKHEAD DIRECTLY FACING EXP#3 (S.ELEV). REMEDY: FIX AND/OR REPLACE | - | V-DOB VIOLATION - ACTIVE | - | 3h2n-5cm9 |
| ECB summons issuedbuilding-scoped | 2024-10-01 | Construction AC 1RCNY-MISC,RS-MISC MISCELLANEOUS VIOLATIONS ECB #37030789Y | CLASS - 1 | RESOLVE | $1,250 | 6bgk-3dad |
| DOB violation filedbuilding-scoped | 2024-05-07 | C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. OBSERVED CRACKED CMU BLOCK/STONES AT EXP #1. OBSERVED MISSING DAMAGE MOTAR JOINTS AT THE PARAPET LEVEL OF EXP #1,2,3,4. OBSERVED CRACKS IN MULTIPLE LOCATIONS & SPALLING CMU BLOCK/STONE AT EXP #1,3,4 REMEDY: REPAIR/REPLACE | - | V-DOB VIOLATION - ACTIVE | - | 3h2n-5cm9 |
| DOB violation filedbuilding-scoped | 2024-03-06 | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION | - | V-DOB VIOLATION - ACTIVE | - | 3h2n-5cm9 |
| Safety context recordbuilding-scoped | 2024-03-06 | FTC-AEU-HAZ | - | Active | - | 855j-jady |
| DOB violation filedbuilding-scoped | 2024-01-11 | C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER.CRACKED STONES VERTICAL BRICK CRACKS AND DAMAGEDMORTAR JOINTS AT MULTIPLE LOCATIONS REMEDY:FIX AND/OR REPLACE | - | V-DOB VIOLATION - ACTIVE | - | 3h2n-5cm9 |
Records are the union of DOB Violations (3h2n-5cm9), ECB (6bgk-3dad), Safety Violations (855j-jady), OATH Hearings (jz4z-kudi), and OATH Trials (y3hw-z6bm) that we could link back to this BBL via BIN or address parsing. Events not tagged LL97-specific are shown as building-scoped context. See methodology · enforcement linking.
Data quality flags
- temporary_value_reportedSee methodology for the exact definition of this flag; behavior may vary by pathway or period.
Full flag catalog: methodology · data quality flags
Fields we cannot show here (internal DOB data not yet public)
Processing lifecycleDOB's internal BEAM system tracks per-building compliance stages, RCE / decarbonization plans, and mitigation credits. Those fields are not yet published as an open dataset. When DOB releases them, this product will show them here without a schema migration. Until then, the following are known gaps for this building:
- Simulated · internal DOB data not yet publicAssessed penalty (vs theoretical)Actual penalty DOB assessed against a building, distinct from the theoretical over-cap exposure computed from LL84 emissions.Best-effort shadow field:
ecb_summons_issuedPublic release status: announced_not_yet_released - Simulated · internal DOB data not yet publicAudit assignmentBuildings selected by DOB for LL97 filing audit and the audit stage.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicAudit outcomeResult of an LL97 audit (accepted / correction ordered / penalty referred).Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicExtension flagWhether a per-building filing was accepted under a filing extension (June 30 grace or BEAM extension to August 29).Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicFiling received dateTimestamp DOB received a per-building LL97 compliance filing.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicGood-faith effort applicationWhether an owner has applied for a good-faith effort determination and its status.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicMediated resolution applicationApplication for the LL97 mediated resolution process and its outcome.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicNotice of deficiency statusWhether a notice of deficiency has been issued for a building and its current stage.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicPer-building filing statusFiling status for each covered BBL/BIN combination (filed / late / non-filed / exempt) as tracked in DOB's BEAM system.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicPre-OATH correspondenceDOB correspondence with owners before an OATH matter is opened (notice of deficiency, cure letters).Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicRDP attestationRegistered Design Professional attestation attached to each per-building compliance filing.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicRECs / offsets claimedRenewable Energy Credits and beneficial-use offsets claimed to reduce reported emissions.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet public60-day cure windowThe 60-day cure window state for a building under LL97 enforcement (open / cured / expired).Public release status: announced_not_yet_released