BBL 1015940040 · BIN 1051399 · Manhattan · Block 01594, Lot 0040

1316 5TH AVENUE

Article 321Pathway source: CBL PDF row · CP3_article_321_one_timeCBL revision date 2026-06-16Open CBL source PDF
Buildings on lot 1
← Buildings

Article 321 · prescriptive compliance pathway

This building is on the Article 321 pathway. Article 321 does not use a numerical cap; compliance is demonstrated via the prescriptive measures package (per methodology · Article 321), which DOB does not currently publish per building. Cap, delta, and penalty columns are intentionally suppressed on Article 321 rows in this product.

2024-29
Occupancy: R-2
GFA: 25,721 sqft
Methodology: v1.0
2030-34
Occupancy: R-2
GFA: 25,721 sqft
Methodology: v1.0

LL84 GHG emissions history

Actual tCO2e reported to LL84 by report year. Each bar links to the raw LL84 row identifier under the chart for auditability.

2021323.1 tCO2e2022305.9 tCO2e2023360.5 tCO2e2024369.1 tCO2e
YearProperty typeGHGProperty GFASite EUISource EUIES scoreSource
2021Multifamily Housing323.1 tCO2e25,721 sqft198.1321.617x5e-2fxh / 6690535
2022Multifamily Housing305.9 tCO2e25,721 sqft191.6296.715zyy-y8am / 6690535
2023Multifamily Housing360.5 tCO2e25,721 sqft202.5315.115zyy-y8am / 6690535
2024Multifamily Housing369.1 tCO2e25,721 sqft202.9314.015zyy-y8am / 6690535

Enforcement events (all DOB + ECB + OATH data cross-linked to this BBL)

Open on enforcement page →
0 LL97-specific events · 11 building-scoped context events.
DOB violation filed0 LL97 · 7 scoped
ECB summons issued0 LL97 · 3 scoped
Safety context record0 LL97 · 1 scoped
StageEvent dateViolationSeverityStatusPenaltySource
DOB violation filedbuilding-scoped2026-05-16
C-CONSTRUCTION OTHER OPTIONAL
FTM BLDG EXTERIOR WALLS & APPURT IN A CODE COMPLIANT MANNER. AT TIME OF INSPECTION, OBSERVED CRACKED WINDOW LINTEL MASONRY DECOR, MULTI LOCATIONS, AT EXP 2 EAST ELEVATION, SPALLED CONCRETE STUCCO, CRACKED/ SPALLED BRICKS MULTI LOCATIONS AT EXP 3 SOUTH ELEVATIONS. REMEDY: OWNER TO REPAIR AND/OR REPLACE
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9
ECB summons issuedbuilding-scoped2026-04-01
Construction
28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER
ECB #39182934R
CLASS - 2ACTIVE$1,2806bgk-3dad
Safety context recordbuilding-scoped2026-01-08
FTF-PL-PER
Cycle 2, Sub-cycle A (premises is in Community District 10)
-Dismissed-855j-jady
DOB violation filedbuilding-scoped2025-03-18
C-CONSTRUCTION OTHER OPTIONAL
FAILURE TO MAINTAIN BUILDING EXTERIOR FACADE AND APPURTENANCES IN A CO DE COMPLIANT MANNER.AT TIME OF INSPECTION,IT WAS OBSERVED AT EXP1 NORT H ELEV CRACKED STONE AND SPALLING,AND DAMAGED WINDOW LINTEL.AT EXP2 DA MAGED/DETERIORATED MORTAR JOINTS AND CRACKED STONES WERE OBSERVED.AT E XP3 SPALLING BRICK,STUCCO FACADE.REMEDY:REPAIR AND/OR REPLACE
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9
ECB summons issuedbuilding-scoped2025-01-14
Construction
BC3307.1.1/BC3307.4.6 POSTING OF UNLAWFUL SIGNS/INFO/PICTURES/ADS ON PROTECTIVE STRUCTURES
ECB #39135473L
CLASS - 2RESOLVE$2,5006bgk-3dad
DOB violation filedbuilding-scoped2024-10-03
C-CONSTRUCTION OTHER OPTIONAL
FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.OBSERVED AT EXP1 NORTH ELEV DAMAGED COPING AND SPALLING AT WINDOW LINTELS.EXP2 DAMAGED JOINTS AND CRACKED STONE ON MULTIPLE FLOORS.EXP3 DAMAGED BULGING AT PA RAPET AND 1 FLOOR SET BACK.EXP4 DAMAGED JOINTS.REMEDY:MAINTAIN BUILDIN G.REPAIR AND/OR REPLACE
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9
DOB violation filedbuilding-scoped2024-05-23
IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL
REMEDY: PROVIDE APPROX 30' TOTAL LINEAR FEET (APPROX. 30 LF AT SOUTHWE ST CORNER) OF SIDEWALK SHED AT EXPOSURE #3 SOUTH ELEVATION
-V*-DOB VIOLATION - DISMISSED-3h2n-5cm9
DOB violation filedbuilding-scoped2024-05-23
C-CONSTRUCTION OTHER OPTIONAL
VACATE ORDER DUE TO SPALLING STUCCO ABOVE EXP3 SOUTH ELEV COURTYARD.CO NDITION POSES HAZARD TO TENANTS AND PROPERTY.REMEDY:EXP3 SOUTH ELEV CO URTYARD TO BE VACATED AND TAKE MEASURES TO PREVENT ACCESS TO VACATED A REA
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9
DOB violation filedbuilding-scoped2024-05-10
C-CONSTRUCTION OTHER OPTIONAL
FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER.AS NOTED AT TH E TIME OF INSPECTION,I OBSERVED ON EXP1 NORTH ELEV AND EXP2 CRACKED AN D SPALLING TERRA COTTA AT WINDOW ENCLOSURE ON MULTIPLE FLOORS.EXP3 SOU TH ELEV SPALLING,BULGING,CRACKED STUCCO AT PARAPET.REMEDY:REPAIR AND/O R REPLACE DAMAGED FACADE
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9
DOB violation filedbuilding-scoped2024-05-10
C-CONSTRUCTION OTHER OPTIONAL
EMERGENCY WORK ORDER DUE TO HAZARDOUS CONDITION ON EXPOSURE#3 S ELEV AT THE PARAPET WALL. AT THE TIME OF INSPECTION, I OBSERVED BULGING CRACKS & SPALLING STUCCO AT PARAPET WITH AN UNPROTECTED PARKING LOT BELOW. REMEDY:IMMEDIATELY PROVIDE SAFETY MEASURES TO PROTECT THE PUBLIC SECURE LICENSED PROFESSIONAL TO SUPERVISE WORK
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9
ECB summons issuedbuilding-scoped2024-03-04
Construction
BC 3307.6,27-1021 SIDEWALK SHED DOES NOT MEET CODE SPECIFICATIONS
ECB #39526106H
CLASS - 2RESOLVE$2,4006bgk-3dad

Records are the union of DOB Violations (3h2n-5cm9), ECB (6bgk-3dad), Safety Violations (855j-jady), OATH Hearings (jz4z-kudi), and OATH Trials (y3hw-z6bm) that we could link back to this BBL via BIN or address parsing. Events not tagged LL97-specific are shown as building-scoped context. See methodology · enforcement linking.

Fields we cannot show here (internal DOB data not yet public)

Processing lifecycle

DOB's internal BEAM system tracks per-building compliance stages, RCE / decarbonization plans, and mitigation credits. Those fields are not yet published as an open dataset. When DOB releases them, this product will show them here without a schema migration. Until then, the following are known gaps for this building:

  • Assessed penalty (vs theoretical)
    Actual penalty DOB assessed against a building, distinct from the theoretical over-cap exposure computed from LL84 emissions.
    Simulated · internal DOB data not yet public
    Best-effort shadow field: ecb_summons_issued
    Public release status: announced_not_yet_released
  • Audit assignment
    Buildings selected by DOB for LL97 filing audit and the audit stage.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Audit outcome
    Result of an LL97 audit (accepted / correction ordered / penalty referred).
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Extension flag
    Whether a per-building filing was accepted under a filing extension (June 30 grace or BEAM extension to August 29).
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Filing received date
    Timestamp DOB received a per-building LL97 compliance filing.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Good-faith effort application
    Whether an owner has applied for a good-faith effort determination and its status.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Mediated resolution application
    Application for the LL97 mediated resolution process and its outcome.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Notice of deficiency status
    Whether a notice of deficiency has been issued for a building and its current stage.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Per-building filing status
    Filing status for each covered BBL/BIN combination (filed / late / non-filed / exempt) as tracked in DOB's BEAM system.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Pre-OATH correspondence
    DOB correspondence with owners before an OATH matter is opened (notice of deficiency, cure letters).
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • RDP attestation
    Registered Design Professional attestation attached to each per-building compliance filing.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • RECs / offsets claimed
    Renewable Energy Credits and beneficial-use offsets claimed to reduce reported emissions.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • 60-day cure window
    The 60-day cure window state for a building under LL97 enforcement (open / cured / expired).
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
Every number on this page traces back to a Socrata dataset row or a CBL PDF revision. Where DOB does not publish a computable field (pathway, internal BEAM stage, compliance decision), we say so on the record instead of hiding the gap. See methodology.