1316 5TH AVENUE
CP3_article_321_one_timeCBL revision date 2026-06-16Open CBL source PDFArticle 321 · prescriptive compliance pathway
This building is on the Article 321 pathway. Article 321 does not use a numerical cap; compliance is demonstrated via the prescriptive measures package (per methodology · Article 321), which DOB does not currently publish per building. Cap, delta, and penalty columns are intentionally suppressed on Article 321 rows in this product.
LL84 GHG emissions history
Actual tCO2e reported to LL84 by report year. Each bar links to the raw LL84 row identifier under the chart for auditability.
| Year | Property type | GHG | Property GFA | Site EUI | Source EUI | ES score | Source |
|---|---|---|---|---|---|---|---|
| 2021 | Multifamily Housing | 323.1 tCO2e | 25,721 sqft | 198.1 | 321.6 | 1 | 7x5e-2fxh / 6690535 |
| 2022 | Multifamily Housing | 305.9 tCO2e | 25,721 sqft | 191.6 | 296.7 | 1 | 5zyy-y8am / 6690535 |
| 2023 | Multifamily Housing | 360.5 tCO2e | 25,721 sqft | 202.5 | 315.1 | 1 | 5zyy-y8am / 6690535 |
| 2024 | Multifamily Housing | 369.1 tCO2e | 25,721 sqft | 202.9 | 314.0 | 1 | 5zyy-y8am / 6690535 |
Enforcement events (all DOB + ECB + OATH data cross-linked to this BBL)
Open on enforcement page →| Stage | Event date | Violation | Severity | Status | Penalty | Source |
|---|---|---|---|---|---|---|
| DOB violation filedbuilding-scoped | 2026-05-16 | C-CONSTRUCTION OTHER OPTIONAL FTM BLDG EXTERIOR WALLS & APPURT IN A CODE COMPLIANT MANNER. AT TIME OF INSPECTION, OBSERVED CRACKED WINDOW LINTEL MASONRY DECOR, MULTI LOCATIONS, AT EXP 2 EAST ELEVATION, SPALLED CONCRETE STUCCO, CRACKED/ SPALLED BRICKS MULTI LOCATIONS AT EXP 3 SOUTH ELEVATIONS. REMEDY: OWNER TO REPAIR AND/OR REPLACE | - | V-DOB VIOLATION - ACTIVE | - | 3h2n-5cm9 |
| ECB summons issuedbuilding-scoped | 2026-04-01 | Construction 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER ECB #39182934R | CLASS - 2 | ACTIVE | $1,280 | 6bgk-3dad |
| Safety context recordbuilding-scoped | 2026-01-08 | FTF-PL-PER Cycle 2, Sub-cycle A (premises is in Community District 10) | - | Dismissed | - | 855j-jady |
| DOB violation filedbuilding-scoped | 2025-03-18 | C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN BUILDING EXTERIOR FACADE AND APPURTENANCES IN A CO DE COMPLIANT MANNER.AT TIME OF INSPECTION,IT WAS OBSERVED AT EXP1 NORT H ELEV CRACKED STONE AND SPALLING,AND DAMAGED WINDOW LINTEL.AT EXP2 DA MAGED/DETERIORATED MORTAR JOINTS AND CRACKED STONES WERE OBSERVED.AT E XP3 SPALLING BRICK,STUCCO FACADE.REMEDY:REPAIR AND/OR REPLACE | - | V-DOB VIOLATION - ACTIVE | - | 3h2n-5cm9 |
| ECB summons issuedbuilding-scoped | 2025-01-14 | Construction BC3307.1.1/BC3307.4.6 POSTING OF UNLAWFUL SIGNS/INFO/PICTURES/ADS ON PROTECTIVE STRUCTURES ECB #39135473L | CLASS - 2 | RESOLVE | $2,500 | 6bgk-3dad |
| DOB violation filedbuilding-scoped | 2024-10-03 | C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.OBSERVED AT EXP1 NORTH ELEV DAMAGED COPING AND SPALLING AT WINDOW LINTELS.EXP2 DAMAGED JOINTS AND CRACKED STONE ON MULTIPLE FLOORS.EXP3 DAMAGED BULGING AT PA RAPET AND 1 FLOOR SET BACK.EXP4 DAMAGED JOINTS.REMEDY:MAINTAIN BUILDIN G.REPAIR AND/OR REPLACE | - | V-DOB VIOLATION - ACTIVE | - | 3h2n-5cm9 |
| DOB violation filedbuilding-scoped | 2024-05-23 | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL REMEDY: PROVIDE APPROX 30' TOTAL LINEAR FEET (APPROX. 30 LF AT SOUTHWE ST CORNER) OF SIDEWALK SHED AT EXPOSURE #3 SOUTH ELEVATION | - | V*-DOB VIOLATION - DISMISSED | - | 3h2n-5cm9 |
| DOB violation filedbuilding-scoped | 2024-05-23 | C-CONSTRUCTION OTHER OPTIONAL VACATE ORDER DUE TO SPALLING STUCCO ABOVE EXP3 SOUTH ELEV COURTYARD.CO NDITION POSES HAZARD TO TENANTS AND PROPERTY.REMEDY:EXP3 SOUTH ELEV CO URTYARD TO BE VACATED AND TAKE MEASURES TO PREVENT ACCESS TO VACATED A REA | - | V-DOB VIOLATION - ACTIVE | - | 3h2n-5cm9 |
| DOB violation filedbuilding-scoped | 2024-05-10 | C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER.AS NOTED AT TH E TIME OF INSPECTION,I OBSERVED ON EXP1 NORTH ELEV AND EXP2 CRACKED AN D SPALLING TERRA COTTA AT WINDOW ENCLOSURE ON MULTIPLE FLOORS.EXP3 SOU TH ELEV SPALLING,BULGING,CRACKED STUCCO AT PARAPET.REMEDY:REPAIR AND/O R REPLACE DAMAGED FACADE | - | V-DOB VIOLATION - ACTIVE | - | 3h2n-5cm9 |
| DOB violation filedbuilding-scoped | 2024-05-10 | C-CONSTRUCTION OTHER OPTIONAL EMERGENCY WORK ORDER DUE TO HAZARDOUS CONDITION ON EXPOSURE#3 S ELEV AT THE PARAPET WALL. AT THE TIME OF INSPECTION, I OBSERVED BULGING CRACKS & SPALLING STUCCO AT PARAPET WITH AN UNPROTECTED PARKING LOT BELOW. REMEDY:IMMEDIATELY PROVIDE SAFETY MEASURES TO PROTECT THE PUBLIC SECURE LICENSED PROFESSIONAL TO SUPERVISE WORK | - | V-DOB VIOLATION - ACTIVE | - | 3h2n-5cm9 |
| ECB summons issuedbuilding-scoped | 2024-03-04 | Construction BC 3307.6,27-1021 SIDEWALK SHED DOES NOT MEET CODE SPECIFICATIONS ECB #39526106H | CLASS - 2 | RESOLVE | $2,400 | 6bgk-3dad |
Records are the union of DOB Violations (3h2n-5cm9), ECB (6bgk-3dad), Safety Violations (855j-jady), OATH Hearings (jz4z-kudi), and OATH Trials (y3hw-z6bm) that we could link back to this BBL via BIN or address parsing. Events not tagged LL97-specific are shown as building-scoped context. See methodology · enforcement linking.
Fields we cannot show here (internal DOB data not yet public)
Processing lifecycleDOB's internal BEAM system tracks per-building compliance stages, RCE / decarbonization plans, and mitigation credits. Those fields are not yet published as an open dataset. When DOB releases them, this product will show them here without a schema migration. Until then, the following are known gaps for this building:
- Simulated · internal DOB data not yet publicAssessed penalty (vs theoretical)Actual penalty DOB assessed against a building, distinct from the theoretical over-cap exposure computed from LL84 emissions.Best-effort shadow field:
ecb_summons_issuedPublic release status: announced_not_yet_released - Simulated · internal DOB data not yet publicAudit assignmentBuildings selected by DOB for LL97 filing audit and the audit stage.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicAudit outcomeResult of an LL97 audit (accepted / correction ordered / penalty referred).Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicExtension flagWhether a per-building filing was accepted under a filing extension (June 30 grace or BEAM extension to August 29).Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicFiling received dateTimestamp DOB received a per-building LL97 compliance filing.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicGood-faith effort applicationWhether an owner has applied for a good-faith effort determination and its status.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicMediated resolution applicationApplication for the LL97 mediated resolution process and its outcome.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicNotice of deficiency statusWhether a notice of deficiency has been issued for a building and its current stage.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicPer-building filing statusFiling status for each covered BBL/BIN combination (filed / late / non-filed / exempt) as tracked in DOB's BEAM system.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicPre-OATH correspondenceDOB correspondence with owners before an OATH matter is opened (notice of deficiency, cure letters).Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicRDP attestationRegistered Design Professional attestation attached to each per-building compliance filing.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicRECs / offsets claimedRenewable Energy Credits and beneficial-use offsets claimed to reduce reported emissions.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet public60-day cure windowThe 60-day cure window state for a building under LL97 enforcement (open / cured / expired).Public release status: announced_not_yet_released