NYC Prototypes
Skip to main content
BBL 1016150014 · BIN 1051601 · Manhattan · Block 01615, Lot 0014

1632 MADISON AVENUE

Article 321Pathway source: CBL PDF row · CP3_article_321_one_timeCBL revision date 2026-06-16Open CBL source PDF
Buildings on lot 1
← Buildings

Article 321 · prescriptive compliance pathway

This building is on the Article 321 pathway. Article 321 does not use a numerical cap; compliance is demonstrated via the prescriptive measures package (per methodology · Article 321), which DOB does not currently publish per building. Cap, delta, and penalty columns are intentionally suppressed on Article 321 rows in this product.

2024-29
Occupancy: R-2
GFA: 59,280 sqft
Methodology: v1.0
2030-34
Occupancy: R-2
GFA: 59,280 sqft
Methodology: v1.0

LL84 GHG emissions history

Actual tCO2e reported to LL84 by report year. Each bar links to the raw LL84 row identifier under the chart for auditability.

2021475.1 tCO2e2022475.6 tCO2e2023427.3 tCO2e2024400.9 tCO2e
YearProperty typeGHGProperty GFASite EUISource EUIES scoreSource
2021Multifamily Housing475.1 tCO2e59,280 sqft138.6200.867x5e-2fxh / 5029858
2022Multifamily Housing475.6 tCO2e59,280 sqft132.9193.2215zyy-y8am / 5029858
2023Multifamily Housing427.3 tCO2e59,280 sqft104.7161.5395zyy-y8am / 35461446
2024Multifamily Housing400.9 tCO2e59,280 sqft90.7150.295zyy-y8am / 46270751

Enforcement events (all DOB + ECB + OATH data cross-linked to this BBL)

Open on enforcement page →
0 LL97-specific events · 13 building-scoped context events.
DOB violation filed0 LL97 · 5 scoped
ECB summons issued0 LL97 · 3 scoped
Safety context record0 LL97 · 5 scoped
StageEvent dateViolationSeverityStatusPenaltySource
DOB violation filedbuilding-scoped2026-04-15
C-CONSTRUCTION OTHER OPTIONAL
BUILDING HAS BEEN OBSERVED HAVING SPECIAL INSPECTOR WITHDRAWN FROM JOB #M0113295. NEW SPECIAL INSPECTOR MUST SUPERSEDE TO PREVENT THE ISSUANCE OF A REVOCATION OF THE PERMIT FOR THIS JOB.
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9
ECB summons issuedbuilding-scoped2026-04-13
Elevators
28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLAINT MANNER:SERVICE EQUIPMEN
ECB #39184331R
CLASS - 2ACTIVE$6556bgk-3dad
ECB summons issuedbuilding-scoped2025-12-15
Boilers
28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: SERVICE EQUIPME
ECB #39170447L
CLASS - 3ACTIVE$5006bgk-3dad
Safety context recordbuilding-scoped2025-10-10
FTC-VT-PER-CO
Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction
-Active-855j-jady
Safety context recordbuilding-scoped2025-08-29
FTF-VT-CAT1-CO
Violation Issued-Failure To File 2024 Cat1 Test Report
-Active-855j-jady
ECB summons issuedbuilding-scoped2025-05-22
Elevators
28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLAINT MANNER:SERVICE EQUIPMEN
ECB #39148799Y
CLASS - 2ACTIVE$3,1256bgk-3dad
Safety context recordbuilding-scoped2025-01-31
FTF-PL-PER
Cycle 1, Sub-cycle D (premises is in Community District 11)
-Active-855j-jady
Safety context recordbuilding-scoped2024-10-11
FTC-VT-PER-CO
Violation Issued-Failure To File 2023 Periodic Inspection Affirmation of Correction
-Active-855j-jady
DOB violation filedbuilding-scoped2024-05-13
C-CONSTRUCTION OTHER OPTIONAL
FAILURE TO MAINTAIN.BLDG THAT SUSTAINED FIRE DAMAGES ON 5/16/24 ROOF OPEN CHARRED ROOF JOISTS.COLLAPSED CEILING FINISHES@6THFL &5TH FLRS MISSING WINDOWS.OWNR TO ENGAGE NYS PE&TO EVAL&REPAIR THE BLDG UNDR PRMT.FILE FOR PERMIT BY 6/1/24,COMPLETE BY 9/1/24
-V*-DOB VIOLATION - DISMISSED-3h2n-5cm9
DOB violation filedbuilding-scoped2024-05-13
C-CONSTRUCTION OTHER OPTIONAL
EMERGENCY WORK.DETACHED MASONRY WALLS&WOOD FLOORS BLDG THAT SUSTAINED FIRE DAMAGE ON 5/12/24.ROOF IS OPEN,ROOF JOISTS CHARRED&DEBRIS NOTED@ 6TH FL.1.IMMEDIATELY MAKE BLDG TEMPORARILY WEATHER TIGHT.SEAL ALL ROOF OPENINGS,2.INSTALL TEMP SHORNG IF/WHERE REQ'D
-V*-DOB VIOLATION - DISMISSED-3h2n-5cm9
DOB violation filedbuilding-scoped2024-05-12
C-CONSTRUCTION OTHER OPTIONAL
STRUCTURE RENDER NON COMPLIANT. DUE TO A FIRE IN APARTMENT 6B THE BUILDING SUSTAINED EXTENSIVE FIRE DAMAGE TO APARTMENT 6A AND 6B. THE ROOF SUSTAINED FIRE CHARRED RAFTERS AND OPENING IN ROOF VARIOUS LOCATION. WATER, SMOKE, FIRE FIGHTING OPERATION VARIOUS APARTMENT.
-V*-DOB VIOLATION - DISMISSED-3h2n-5cm9
Safety context recordbuilding-scoped2024-05-02
FTF-EN-BENCH
-Dismissed-855j-jady
DOB violation filedbuilding-scoped2024-05-02
BENCH-FAILURE TO BENCHMARK NONE
FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
-V*-DOB VIOLATION - DISMISSED-3h2n-5cm9

Records are the union of DOB Violations (3h2n-5cm9), ECB (6bgk-3dad), Safety Violations (855j-jady), OATH Hearings (jz4z-kudi), and OATH Trials (y3hw-z6bm) that we could link back to this BBL via BIN or address parsing. Events not tagged LL97-specific are shown as building-scoped context. See methodology · enforcement linking.

Data quality flags

  • default_value_reportedSee methodology for the exact definition of this flag; behavior may vary by pathway or period.

Full flag catalog: methodology · data quality flags

Fields we cannot show here (internal DOB data not yet public)

Processing lifecycle

DOB's internal BEAM system tracks per-building compliance stages, RCE / decarbonization plans, and mitigation credits. Those fields are not yet published as an open dataset. When DOB releases them, this product will show them here without a schema migration. Until then, the following are known gaps for this building:

  • Assessed penalty (vs theoretical)
    Actual penalty DOB assessed against a building, distinct from the theoretical over-cap exposure computed from LL84 emissions.
    Simulated · internal DOB data not yet public
    Best-effort shadow field: ecb_summons_issued
    Public release status: announced_not_yet_released
  • Audit assignment
    Buildings selected by DOB for LL97 filing audit and the audit stage.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Audit outcome
    Result of an LL97 audit (accepted / correction ordered / penalty referred).
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Extension flag
    Whether a per-building filing was accepted under a filing extension (June 30 grace or BEAM extension to August 29).
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Filing received date
    Timestamp DOB received a per-building LL97 compliance filing.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Good-faith effort application
    Whether an owner has applied for a good-faith effort determination and its status.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Mediated resolution application
    Application for the LL97 mediated resolution process and its outcome.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Notice of deficiency status
    Whether a notice of deficiency has been issued for a building and its current stage.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Per-building filing status
    Filing status for each covered BBL/BIN combination (filed / late / non-filed / exempt) as tracked in DOB's BEAM system.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Pre-OATH correspondence
    DOB correspondence with owners before an OATH matter is opened (notice of deficiency, cure letters).
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • RDP attestation
    Registered Design Professional attestation attached to each per-building compliance filing.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • RECs / offsets claimed
    Renewable Energy Credits and beneficial-use offsets claimed to reduce reported emissions.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • 60-day cure window
    The 60-day cure window state for a building under LL97 enforcement (open / cured / expired).
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
Every number on this page traces back to a Socrata dataset row or a CBL PDF revision. Where DOB does not publish a computable field (pathway, internal BEAM stage, compliance decision), we say so on the record instead of hiding the gap. See methodology.