NYC Prototypes
Skip to main content
BBL 1016290030 · BIN 1051847 · Manhattan · Block 01629, Lot 0030

177 EAST 101ST STREET

Article 321Pathway source: CBL PDF row · CP3_article_321_one_timeCBL revision date 2026-06-16Open CBL source PDF
Buildings on lot 1
← Buildings

Article 321 · prescriptive compliance pathway

This building is on the Article 321 pathway. Article 321 does not use a numerical cap; compliance is demonstrated via the prescriptive measures package (per methodology · Article 321), which DOB does not currently publish per building. Cap, delta, and penalty columns are intentionally suppressed on Article 321 rows in this product.

2024-29
Occupancy: R-2
GFA: 38,164 sqft
Methodology: v1.0
2030-34
Occupancy: R-2
GFA: 38,164 sqft
Methodology: v1.0

LL84 GHG emissions history

Actual tCO2e reported to LL84 by report year. Each bar links to the raw LL84 row identifier under the chart for auditability.

2021210.9 tCO2e2022192.3 tCO2e2023206.2 tCO2e2024201.4 tCO2e
YearProperty typeGHGProperty GFASite EUISource EUIES scoreSource
2021Multifamily Housing210.9 tCO2e38,164 sqft101.4118.3537x5e-2fxh / 21009376
2022Multifamily Housing192.3 tCO2e38,164 sqft86.8114.9615zyy-y8am / 21009376
2023Multifamily Housing206.2 tCO2e38,164 sqft86.8116.0495zyy-y8am / 21009376
2024Multifamily Housing201.4 tCO2e38,164 sqft82.1112.1625zyy-y8am / 21009376

Enforcement events (all DOB + ECB + OATH data cross-linked to this BBL)

Open on enforcement page →
0 LL97-specific events · 8 building-scoped context events.
DOB violation filed0 LL97 · 3 scoped
ECB summons issued0 LL97 · 4 scoped
Safety context record0 LL97 · 1 scoped
StageEvent dateViolationSeverityStatusPenaltySource
ECB summons issuedbuilding-scoped2026-04-20
Local Law
28-302.5 FAILURE TO FILE AN AMENDED REPORT ACCEPTABLE TO THIS DEPARTMENT INDICA
ECB #37036781R
CLASS - 2ACTIVE$1,2506bgk-3dad
ECB summons issuedbuilding-scoped2025-10-07
Boilers
28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: SERVICE EQUIPME
ECB #39162803Z
CLASS - 3ACTIVE$5006bgk-3dad
DOB violation filedbuilding-scoped2025-04-02
IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL
REMEDY: PROVIDE APPROXIMATLY110 LINEAR FEET FOR SIDEWALK SHED AT EXPOSURE#1, SOUTH ELEVATION (EAST 101 ST)
-V*-DOB VIOLATION - DISMISSED-3h2n-5cm9
ECB summons issuedbuilding-scoped2025-03-20
Construction
28-201.1 UNLAWFUL ACTS. FAILURE TO COMPLY WITH AN ORDER OF THE COMMISSIONER
ECB #35690015L
CLASS - 1ACTIVE$12,5006bgk-3dad
Safety context recordbuilding-scoped2025-02-20
FISPHAZ
CYCLE 9A UNSAFE REPORT FILED
-Active-855j-jady
DOB violation filedbuilding-scoped2025-02-20
FISPHAZ-HAZARDOUS CONDITION (FACADE) FACADE REQUIRED
CYCLE 9A UNSAFE REPORT FILED
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9
ECB summons issuedbuilding-scoped2024-12-19
Construction
28-302.5 FAIL TO TAKE REQUIRED MEASURES TO SECURE PUBLIC SAFWTY-UNSAFE FACADE
ECB #35686723K
CLASS - 1ACTIVE$25,0006bgk-3dad
DOB violation filedbuilding-scoped2024-12-09
C-CONSTRUCTION OTHER OPTIONAL
EMRGNCY WRK ORDER: TO SECURE PUBLIC SAFETY-UNSAFE FISP3 FILED BY QEWI 12/3/24. NOTE: DUE TO IMMINET HAZ CONDITIONS OBSERVED AT TIME OF INSPECTION, CRACKED, SPALLED, LOOSE STUCO MATERIALS, CRACKED STONE, DEFECTIVE MORTAR JOINTS AT EXP 1,2,3,4 (SOUTH, WEST, NORTH, EAST ELEV) OWNER TO PRVDE ADEQ SFTY MEASURE TO ALL EXP IMMEDIATELY AS PER CODE
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9

Records are the union of DOB Violations (3h2n-5cm9), ECB (6bgk-3dad), Safety Violations (855j-jady), OATH Hearings (jz4z-kudi), and OATH Trials (y3hw-z6bm) that we could link back to this BBL via BIN or address parsing. Events not tagged LL97-specific are shown as building-scoped context. See methodology · enforcement linking.

Fields we cannot show here (internal DOB data not yet public)

Processing lifecycle

DOB's internal BEAM system tracks per-building compliance stages, RCE / decarbonization plans, and mitigation credits. Those fields are not yet published as an open dataset. When DOB releases them, this product will show them here without a schema migration. Until then, the following are known gaps for this building:

  • Assessed penalty (vs theoretical)
    Actual penalty DOB assessed against a building, distinct from the theoretical over-cap exposure computed from LL84 emissions.
    Simulated · internal DOB data not yet public
    Best-effort shadow field: ecb_summons_issued
    Public release status: announced_not_yet_released
  • Audit assignment
    Buildings selected by DOB for LL97 filing audit and the audit stage.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Audit outcome
    Result of an LL97 audit (accepted / correction ordered / penalty referred).
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Extension flag
    Whether a per-building filing was accepted under a filing extension (June 30 grace or BEAM extension to August 29).
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Filing received date
    Timestamp DOB received a per-building LL97 compliance filing.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Good-faith effort application
    Whether an owner has applied for a good-faith effort determination and its status.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Mediated resolution application
    Application for the LL97 mediated resolution process and its outcome.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Notice of deficiency status
    Whether a notice of deficiency has been issued for a building and its current stage.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Per-building filing status
    Filing status for each covered BBL/BIN combination (filed / late / non-filed / exempt) as tracked in DOB's BEAM system.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Pre-OATH correspondence
    DOB correspondence with owners before an OATH matter is opened (notice of deficiency, cure letters).
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • RDP attestation
    Registered Design Professional attestation attached to each per-building compliance filing.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • RECs / offsets claimed
    Renewable Energy Credits and beneficial-use offsets claimed to reduce reported emissions.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • 60-day cure window
    The 60-day cure window state for a building under LL97 enforcement (open / cured / expired).
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
Every number on this page traces back to a Socrata dataset row or a CBL PDF revision. Where DOB does not publish a computable field (pathway, internal BEAM stage, compliance decision), we say so on the record instead of hiding the gap. See methodology.