307 EAST 101ST STREET
CP4_city_portfolioCBL revision date 2026-06-16Open CBL source PDFArticle 320 · numerical caps & computed exposure
How this is computed| Period | Occupancy | GFA | Cap | Actual | Delta | Est. penalty | Status | Methodology |
|---|---|---|---|---|---|---|---|---|
| 2024-29 | R-2(high) | 289,602 sqft | 1,954.8 tCO2e | 2,592.6 tCO2e | +637.7 | $170,913 | Over capEJ · PEJA fallback | v1.0 |
| 2030-34 | R-2(high) | 289,602 sqft | 1,178.7 tCO2e | 2,592.6 tCO2e | +1,413.9 | $378,917 | Over capEJ · PEJA fallback | v1.0 |
Cap = Σ (occupancy_coefficient × gross_floor_area) using DOB LL97 rules; actual GHG is the most recent LL84 filing. Delta is positive when actual exceeds cap. Estimated penalty is DOB's public $268/tCO2e × delta with a 30-day grace applied via penalty_estimate_usd.
LL84 GHG emissions history
Actual tCO2e reported to LL84 by report year. Each bar links to the raw LL84 row identifier under the chart for auditability.
| Year | Property type | GHG | Property GFA | Site EUI | Source EUI | ES score | Source |
|---|---|---|---|---|---|---|---|
| 2024 | Multifamily Housing | 2,592.6 tCO2e | 289,602 sqft | 136.6 | 173.1 | 15 | 5zyy-y8am / 2831117 |
Enforcement events (all DOB + ECB + OATH data cross-linked to this BBL)
Open on enforcement page →| Stage | Event date | Violation | Severity | Status | Penalty | Source |
|---|---|---|---|---|---|---|
| ECB summons issuedbuilding-scoped | 2026-01-23 | Elevators 28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER: SERVICE EQUIPME ECB #39174885J | CLASS - 1 | ACTIVE | $1,250 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2026-01-07 | Elevators 28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLAINT MANNER:SERVICE EQUIPMEN ECB #39172773X | CLASS - 2 | ACTIVE | $625 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2026-01-07 | Elevators 28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLAINT MANNER:SERVICE EQUIPMEN ECB #39172772Y | CLASS - 2 | ACTIVE | $625 | 6bgk-3dad |
| DOB violation filedbuilding-scoped | 2025-12-23 | C-CONSTRUCTION OTHER OPTIONAL STRUCTURE RENDERED NON COMPLIANT. RESPONDING TO AN INCIDENT OBSERVED APPROXIMATELY 60' LINEAR FEET THAT HAD COLLAPSED FROM GARBAGE TRUCK IMPACT. OBSERVED SIDEWALK SHED DEBRIS AT SIDEWALK AND PARAPET PANEL HANGING WITH POTENTIAL TO FURTHER FALL. | - | V-DOB VIOLATION - ACTIVE | - | 3h2n-5cm9 |
| ECB summons issuedbuilding-scoped | 2025-10-21 | Unknown ECB #39546190H | CLASS - 2 | ACTIVE | $10,000 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2025-04-08 | Local Law 28-302.4 FAILURE TO SUBMIT A REQUIRED REPORT OF CRITICAL EXAMINATION DOCUMENTIN ECB #37034673K | CLASS - 2 | ACTIVE | $2,530 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2025-02-11 | Construction AC 28-204.4 FAIL TO COMPLY W/COMMISSIONER ORDER TO FILE CERT OF CORRECTION W/DOB ECB #37033297L | CLASS - 2 | ACTIVE | $1,250 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2024-09-16 | Construction 27-371, BC 715.3.7 (2008 CODE) & BC 715.4.8 (2014 CODE) EXIT DOOR NOT SELF-CLOSING. ECB #35683069L | CLASS - 2 | RESOLVE | $1,562 | 6bgk-3dad |
| Safety context recordbuilding-scoped | 2024-09-11 | FTF-VT-PER-HA Violation Issued-Failure To File 2023 Periodic Inspection Report | - | Dismissed | - | 855j-jady |
| Safety context recordbuilding-scoped | 2024-02-22 | FISPNRF FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024 | - | Active | - | 855j-jady |
Records are the union of DOB Violations (3h2n-5cm9), ECB (6bgk-3dad), Safety Violations (855j-jady), OATH Hearings (jz4z-kudi), and OATH Trials (y3hw-z6bm) that we could link back to this BBL via BIN or address parsing. Events not tagged LL97-specific are shown as building-scoped context. See methodology · enforcement linking.
Fields we cannot show here (internal DOB data not yet public)
Processing lifecycleDOB's internal BEAM system tracks per-building compliance stages, RCE / decarbonization plans, and mitigation credits. Those fields are not yet published as an open dataset. When DOB releases them, this product will show them here without a schema migration. Until then, the following are known gaps for this building:
- Simulated · internal DOB data not yet publicAssessed penalty (vs theoretical)Actual penalty DOB assessed against a building, distinct from the theoretical over-cap exposure computed from LL84 emissions.Best-effort shadow field:
ecb_summons_issuedPublic release status: announced_not_yet_released - Simulated · internal DOB data not yet publicAudit assignmentBuildings selected by DOB for LL97 filing audit and the audit stage.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicAudit outcomeResult of an LL97 audit (accepted / correction ordered / penalty referred).Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicExtension flagWhether a per-building filing was accepted under a filing extension (June 30 grace or BEAM extension to August 29).Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicFiling received dateTimestamp DOB received a per-building LL97 compliance filing.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicGood-faith effort applicationWhether an owner has applied for a good-faith effort determination and its status.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicMediated resolution applicationApplication for the LL97 mediated resolution process and its outcome.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicNotice of deficiency statusWhether a notice of deficiency has been issued for a building and its current stage.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicPer-building filing statusFiling status for each covered BBL/BIN combination (filed / late / non-filed / exempt) as tracked in DOB's BEAM system.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicPre-OATH correspondenceDOB correspondence with owners before an OATH matter is opened (notice of deficiency, cure letters).Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicRDP attestationRegistered Design Professional attestation attached to each per-building compliance filing.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicRECs / offsets claimedRenewable Energy Credits and beneficial-use offsets claimed to reduce reported emissions.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet public60-day cure windowThe 60-day cure window state for a building under LL97 enforcement (open / cured / expired).Public release status: announced_not_yet_released