NYC Prototypes
Skip to main content
BBL 1017010001 · BIN 1083953 · Manhattan · Block 01701, Lot 0001

2070 1ST AVENUE

Article 321Pathway source: CBL PDF row · CP3_article_321_one_timeCBL revision date 2026-06-16Open CBL source PDF
Buildings on lot 4
← Buildings

Article 321 · prescriptive compliance pathway

This building is on the Article 321 pathway. Article 321 does not use a numerical cap; compliance is demonstrated via the prescriptive measures package (per methodology · Article 321), which DOB does not currently publish per building. Cap, delta, and penalty columns are intentionally suppressed on Article 321 rows in this product.

2024-29
Occupancy: R-2
GFA: 49,777 sqft
Methodology: v1.0
2030-34
Occupancy: R-2
GFA: 49,777 sqft
Methodology: v1.0

LL84 GHG emissions history

Actual tCO2e reported to LL84 by report year. Each bar links to the raw LL84 row identifier under the chart for auditability.

202112,176 tCO2e202212,989 tCO2e202314,958 tCO2e2024-
YearProperty typeGHGProperty GFASite EUISource EUIES scoreSource
2021Multifamily Housing12,176 tCO2e2,285,500 sqft93.4129.1-7x5e-2fxh / 10781066
2022Multifamily Housing12,989 tCO2e2,285,500 sqft96.1133.2-5zyy-y8am / 10781066
2023Multifamily Housing14,958 tCO2e2,046,455 sqft128.6150.185zyy-y8am / 5895341
2024Multifamily Housing-49,777 sqft---5zyy-y8am / 60227792

Enforcement events (all DOB + ECB + OATH data cross-linked to this BBL)

Open on enforcement page →
0 LL97-specific events · 38 building-scoped context events.
DOB violation filed0 LL97 · 12 scoped
ECB summons issued0 LL97 · 10 scoped
Safety context record0 LL97 · 16 scoped
StageEvent dateViolationSeverityStatusPenaltySource
ECB summons issuedbuilding-scoped2026-07-06
Construction
BC 3303.4 & 27-1018 FAILURE TO MAINTAIN ADEQUATE HOUSEKEEPING PER SECTION REQUIREMENTS
ECB #39194813Z
CLASS - 1ACTIVE$2,5006bgk-3dad
ECB summons issuedbuilding-scoped2026-03-26
Elevators
28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER: SERVICE EQUIPME
ECB #39182029R
CLASS - 1RESOLVE$1,2506bgk-3dad
ECB summons issuedbuilding-scoped2025-11-24
Elevators
28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER: SERVICE EQUIPME
ECB #39168231J
CLASS - 1RESOLVE$1,2506bgk-3dad
ECB summons issuedbuilding-scoped2025-11-17
Elevators
28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLAINT MANNER:SERVICE EQUIPMEN
ECB #39167182H
CLASS - 2RESOLVE$06bgk-3dad
ECB summons issuedbuilding-scoped2025-11-17
Elevators
28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLAINT MANNER:SERVICE EQUIPMEN
ECB #39167181X
CLASS - 2RESOLVE$06bgk-3dad
ECB summons issuedbuilding-scoped2025-04-08
Local Law
28-302.4 FAILURE TO SUBMIT A REQUIRED REPORT OF CRITICAL EXAMINATION DOCUMENTIN
ECB #37034677H
CLASS - 2ACTIVE$2,5006bgk-3dad
ECB summons issuedbuilding-scoped2025-04-08
Local Law
28-302.4 FAILURE TO SUBMIT A REQUIRED REPORT OF CRITICAL EXAMINATION DOCUMENTIN
ECB #37034678J
CLASS - 2ACTIVE$2,5006bgk-3dad
ECB summons issuedbuilding-scoped2025-04-08
Local Law
28-302.4 FAILURE TO SUBMIT A REQUIRED REPORT OF CRITICAL EXAMINATION DOCUMENTIN
ECB #37034676X
CLASS - 2ACTIVE$2,5006bgk-3dad
ECB summons issuedbuilding-scoped2025-04-08
Local Law
28-302.4 FAILURE TO SUBMIT A REQUIRED REPORT OF CRITICAL EXAMINATION DOCUMENTIN
ECB #37034675Y
CLASS - 2ACTIVE$2,5006bgk-3dad
Safety context recordbuilding-scoped2025-01-31
FTF-PL-PER
Cycle 1, Sub-cycle D (premises is in Community District 11)
-Active-855j-jady
Safety context recordbuilding-scoped2025-01-31
FTF-PL-PER
Cycle 1, Sub-cycle D (premises is in Community District 11)
-Active-855j-jady
Safety context recordbuilding-scoped2025-01-31
FTF-PL-PER
Cycle 1, Sub-cycle D (premises is in Community District 11)
-Active-855j-jady
Safety context recordbuilding-scoped2025-01-31
FTF-PL-PER
Cycle 1, Sub-cycle D (premises is in Community District 11)
-Active-855j-jady
DOB violation filedbuilding-scoped2024-09-23
LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9
DOB violation filedbuilding-scoped2024-09-23
LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9
DOB violation filedbuilding-scoped2024-09-23
LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9
DOB violation filedbuilding-scoped2024-09-23
LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9
DOB violation filedbuilding-scoped2024-09-23
LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9
Safety context recordbuilding-scoped2024-09-23
LBLVIO
Violation Issued-Failure To File 2023 External Low Pressure Inspection Report
-Active-855j-jady
Safety context recordbuilding-scoped2024-09-23
LBLVIO
Violation Issued-Failure To File 2023 External Low Pressure Inspection Report
-Active-855j-jady
Safety context recordbuilding-scoped2024-09-23
LBLVIO
Violation Issued-Failure To File 2023 External Low Pressure Inspection Report
-Active-855j-jady
Safety context recordbuilding-scoped2024-09-23
LBLVIO
Violation Issued-Failure To File 2023 External Low Pressure Inspection Report
-Active-855j-jady
Safety context recordbuilding-scoped2024-09-23
LBLVIO
Violation Issued-Failure To File 2023 External Low Pressure Inspection Report
-Active-855j-jady
Safety context recordbuilding-scoped2024-09-23
LBLVIO
Violation Issued-Failure To File 2023 External Low Pressure Inspection Report
-Active-855j-jady
DOB violation filedbuilding-scoped2024-09-23
LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9
DOB violation filedbuilding-scoped2024-06-23
EARCX-FAILURE TO SUBMIT EER NONE
FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 IN 2023
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9
Safety context recordbuilding-scoped2024-06-23
FTF-EN-EARCX
-Active-855j-jady
Safety context recordbuilding-scoped2024-03-20
FTC-AEU-HAZ
-Dismissed-855j-jady
DOB violation filedbuilding-scoped2024-03-20
AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
-V*-DOB VIOLATION - DISMISSED-3h2n-5cm9
DOB violation filedbuilding-scoped2024-02-22
FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED
FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9
DOB violation filedbuilding-scoped2024-02-22
FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED
FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9
DOB violation filedbuilding-scoped2024-02-22
FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED
FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9
Safety context recordbuilding-scoped2024-02-22
FISPNRF
FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024
-Active-855j-jady
Safety context recordbuilding-scoped2024-02-22
FISPNRF
FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024
-Active-855j-jady
Safety context recordbuilding-scoped2024-02-22
FISPNRF
FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024
-Active-855j-jady
DOB violation filedbuilding-scoped2024-02-22
FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED
FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9
Safety context recordbuilding-scoped2024-02-22
FISPNRF
FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024
-Active-855j-jady
ECB summons issuedbuilding-scoped2024-01-05
Construction
28-302.1 FAILURE TO MAINTAIN BLDG WALL(S) OR APPURTENANCES
ECB #35675321Y
CLASS - 1ACTIVE$1,2506bgk-3dad

Records are the union of DOB Violations (3h2n-5cm9), ECB (6bgk-3dad), Safety Violations (855j-jady), OATH Hearings (jz4z-kudi), and OATH Trials (y3hw-z6bm) that we could link back to this BBL via BIN or address parsing. Events not tagged LL97-specific are shown as building-scoped context. See methodology · enforcement linking.

Data quality flags

  • default_value_reportedSee methodology for the exact definition of this flag; behavior may vary by pathway or period.

Full flag catalog: methodology · data quality flags

Fields we cannot show here (internal DOB data not yet public)

Processing lifecycle

DOB's internal BEAM system tracks per-building compliance stages, RCE / decarbonization plans, and mitigation credits. Those fields are not yet published as an open dataset. When DOB releases them, this product will show them here without a schema migration. Until then, the following are known gaps for this building:

  • Assessed penalty (vs theoretical)
    Actual penalty DOB assessed against a building, distinct from the theoretical over-cap exposure computed from LL84 emissions.
    Simulated · internal DOB data not yet public
    Best-effort shadow field: ecb_summons_issued
    Public release status: announced_not_yet_released
  • Audit assignment
    Buildings selected by DOB for LL97 filing audit and the audit stage.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Audit outcome
    Result of an LL97 audit (accepted / correction ordered / penalty referred).
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Extension flag
    Whether a per-building filing was accepted under a filing extension (June 30 grace or BEAM extension to August 29).
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Filing received date
    Timestamp DOB received a per-building LL97 compliance filing.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Good-faith effort application
    Whether an owner has applied for a good-faith effort determination and its status.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Mediated resolution application
    Application for the LL97 mediated resolution process and its outcome.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Notice of deficiency status
    Whether a notice of deficiency has been issued for a building and its current stage.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Per-building filing status
    Filing status for each covered BBL/BIN combination (filed / late / non-filed / exempt) as tracked in DOB's BEAM system.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Pre-OATH correspondence
    DOB correspondence with owners before an OATH matter is opened (notice of deficiency, cure letters).
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • RDP attestation
    Registered Design Professional attestation attached to each per-building compliance filing.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • RECs / offsets claimed
    Renewable Energy Credits and beneficial-use offsets claimed to reduce reported emissions.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • 60-day cure window
    The 60-day cure window state for a building under LL97 enforcement (open / cured / expired).
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
Every number on this page traces back to a Socrata dataset row or a CBL PDF revision. Where DOB does not publish a computable field (pathway, internal BEAM stage, compliance decision), we say so on the record instead of hiding the gap. See methodology.