NYC Prototypes
Skip to main content
BBL 1017180037 · BIN 1053262 · Manhattan · Block 01718, Lot 0037

2 WEST 120TH STREET

Article 321Pathway source: CBL PDF row · CP3_article_321_one_timeCBL revision date 2026-06-16Open CBL source PDF
Buildings on lot 1
← Buildings

Article 321 · prescriptive compliance pathway

This building is on the Article 321 pathway. Article 321 does not use a numerical cap; compliance is demonstrated via the prescriptive measures package (per methodology · Article 321), which DOB does not currently publish per building. Cap, delta, and penalty columns are intentionally suppressed on Article 321 rows in this product.

2024-29
Occupancy: R-2
GFA: 77,093 sqft
Methodology: v1.0
2030-34
Occupancy: R-2
GFA: 77,093 sqft
Methodology: v1.0

LL84 GHG emissions history

Actual tCO2e reported to LL84 by report year. Each bar links to the raw LL84 row identifier under the chart for auditability.

2021612.2 tCO2e2022575 tCO2e2023682.6 tCO2e20241,104.9 tCO2e
YearProperty typeGHGProperty GFASite EUISource EUIES scoreSource
2021Multifamily Housing612.2 tCO2e81,719 sqft134.1172.1117x5e-2fxh / 2657939
2022Multifamily Housing575 tCO2e81,719 sqft121.6159.8215zyy-y8am / 2657939
2023Multifamily Housing682.6 tCO2e81,719 sqft119.1154.4175zyy-y8am / 2657939
2024Multifamily Housing1,104.9 tCO2e77,093 sqft205.4242.6-5zyy-y8am / 2657939

Enforcement events (all DOB + ECB + OATH data cross-linked to this BBL)

Open on enforcement page →
0 LL97-specific events · 25 building-scoped context events.
DOB violation filed0 LL97 · 2 scoped
ECB summons issued0 LL97 · 17 scoped
Safety context record0 LL97 · 6 scoped
StageEvent dateViolationSeverityStatusPenaltySource
ECB summons issuedbuilding-scoped2026-05-07
Unknown
ECB #35726617K
CLASS - 2ACTIVE$1,2506bgk-3dad
DOB violation filedbuilding-scoped2026-05-07
C-CONSTRUCTION OTHER OPTIONAL
FTM BLDG. OBSERVED THE FOLLOWING DEFECTIVE BUILDING CONDITIONS MULTIPLE SPALLING AND ERODING MORTOR JOINTS AT EXP 3 & 4, WITH CORROSION OF FIRE ESCAPE. EXP 2 SPALLED/SPALLING AT COURTYARD. REMEDY: REPAIR AND OR REPLACE
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9
ECB summons issuedbuilding-scoped2026-05-07
Construction
BC 3307.6,27-1021 SIDEWALK SHED DOES NOT MEET CODE SPECIFICATIONS
ECB #35726618M
CLASS - 2ACTIVE$2,4006bgk-3dad
ECB summons issuedbuilding-scoped2026-03-25
Unknown
ECB #39552156P
CLASS - 2ACTIVE$1,2506bgk-3dad
ECB summons issuedbuilding-scoped2026-03-25
Construction
BC 3301.9,27-10009(C) FAIL TO PROVIDE/POST SIGN(S) AT JB SITE PURSUANT TO SUBSEC
ECB #39552155N
CLASS - 2ACTIVE$1,2506bgk-3dad
Safety context recordbuilding-scoped2026-03-17
FTC-AEU-HAZ
-Active-855j-jady
Safety context recordbuilding-scoped2026-03-17
FTC-AEU-HAZ
-Active-855j-jady
Safety context recordbuilding-scoped2026-03-17
FTC-AEU-HAZ
-Active-855j-jady
ECB summons issuedbuilding-scoped2026-01-30
Elevators
28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER: SERVICE EQUIPME
ECB #39175513N
CLASS - 1RESOLVE$1,2506bgk-3dad
ECB summons issuedbuilding-scoped2026-01-30
Elevators
28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLAINT MANNER:SERVICE EQUIPMEN
ECB #39175512L
CLASS - 2RESOLVE$06bgk-3dad
ECB summons issuedbuilding-scoped2026-01-15
Quality of Life
AC 28-210.3 PERM.DWELLING OFFERED/USED/CONV TO OTHER THAN PERM.RESIDENTIAL PURPOSE
ECB #35725702K
CLASS - 1ACTIVE$70,0006bgk-3dad
ECB summons issuedbuilding-scoped2026-01-15
Construction
27-/28-/BC-MISC MISCELLANEOUS VIOLATIONS
ECB #35725705X
CLASS - 1ACTIVE$25,0006bgk-3dad
ECB summons issuedbuilding-scoped2026-01-15
Construction
28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER
ECB #35725704Y
CLASS - 1ACTIVE$25,0006bgk-3dad
ECB summons issuedbuilding-scoped2026-01-15
Construction
28-301.1 FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER. FAILURE TO PR
ECB #35725703M
CLASS - 1ACTIVE$25,0006bgk-3dad
Safety context recordbuilding-scoped2026-01-08
FTF-PL-PER
Cycle 2, Sub-cycle A (premises is in Community District 10)
-Active-855j-jady
DOB violation filedbuilding-scoped2025-11-14
LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9
Safety context recordbuilding-scoped2025-11-14
LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
-Active-855j-jady
Safety context recordbuilding-scoped2025-10-10
FTC-VT-CAT1-CO
Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction
-Active-855j-jady
ECB summons issuedbuilding-scoped2025-09-12
Elevators
28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLAINT MANNER:SERVICE EQUIPMEN
ECB #39160180M
CLASS - 2ACTIVE$3,1256bgk-3dad
ECB summons issuedbuilding-scoped2025-07-09
Quality of Life
BC 28-210.3 PERM.DWELLING OFFERED/USED/CONV TO OTHER THAN PERM.RESIDENTIAL PURPOSE
ECB #35690905N
CLASS - 2ACTIVE$2,5306bgk-3dad
ECB summons issuedbuilding-scoped2025-07-09
Construction
28-301.1 FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER. FAILURE TO PR
ECB #35690907R
CLASS - 1ACTIVE$12,5006bgk-3dad
ECB summons issuedbuilding-scoped2025-07-09
Construction
28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER
ECB #35690906P
CLASS - 1ACTIVE$12,5006bgk-3dad
ECB summons issuedbuilding-scoped2025-07-09
Construction
27-/28-/BC-MISC MISCELLANEOUS VIOLATIONS
ECB #35690908Z
CLASS - 1ACTIVE$12,5006bgk-3dad
ECB summons issuedbuilding-scoped2024-12-20
Boilers
28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: SERVICE EQUIPME
ECB #39133413K
CLASS - 2RESOLVE$6256bgk-3dad
ECB summons issuedbuilding-scoped2024-08-26
Construction
AC 28-204.4 FAIL TO COMPLY W/COMMISSIONER ORDER TO FILE CERT OF CORRECTION W/DOB
ECB #37029002N
CLASS - 2ACTIVE$1,2506bgk-3dad

Records are the union of DOB Violations (3h2n-5cm9), ECB (6bgk-3dad), Safety Violations (855j-jady), OATH Hearings (jz4z-kudi), and OATH Trials (y3hw-z6bm) that we could link back to this BBL via BIN or address parsing. Events not tagged LL97-specific are shown as building-scoped context. See methodology · enforcement linking.

Fields we cannot show here (internal DOB data not yet public)

Processing lifecycle

DOB's internal BEAM system tracks per-building compliance stages, RCE / decarbonization plans, and mitigation credits. Those fields are not yet published as an open dataset. When DOB releases them, this product will show them here without a schema migration. Until then, the following are known gaps for this building:

  • Assessed penalty (vs theoretical)
    Actual penalty DOB assessed against a building, distinct from the theoretical over-cap exposure computed from LL84 emissions.
    Simulated · internal DOB data not yet public
    Best-effort shadow field: ecb_summons_issued
    Public release status: announced_not_yet_released
  • Audit assignment
    Buildings selected by DOB for LL97 filing audit and the audit stage.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Audit outcome
    Result of an LL97 audit (accepted / correction ordered / penalty referred).
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Extension flag
    Whether a per-building filing was accepted under a filing extension (June 30 grace or BEAM extension to August 29).
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Filing received date
    Timestamp DOB received a per-building LL97 compliance filing.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Good-faith effort application
    Whether an owner has applied for a good-faith effort determination and its status.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Mediated resolution application
    Application for the LL97 mediated resolution process and its outcome.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Notice of deficiency status
    Whether a notice of deficiency has been issued for a building and its current stage.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Per-building filing status
    Filing status for each covered BBL/BIN combination (filed / late / non-filed / exempt) as tracked in DOB's BEAM system.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Pre-OATH correspondence
    DOB correspondence with owners before an OATH matter is opened (notice of deficiency, cure letters).
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • RDP attestation
    Registered Design Professional attestation attached to each per-building compliance filing.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • RECs / offsets claimed
    Renewable Energy Credits and beneficial-use offsets claimed to reduce reported emissions.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • 60-day cure window
    The 60-day cure window state for a building under LL97 enforcement (open / cured / expired).
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
Every number on this page traces back to a Socrata dataset row or a CBL PDF revision. Where DOB does not publish a computable field (pathway, internal BEAM stage, compliance decision), we say so on the record instead of hiding the gap. See methodology.