NYC Prototypes
Skip to main content
BBL 1017860042 · BIN 1054619 · Manhattan · Block 01786, Lot 0042

212 EAST 122ND STREET

Article 321Pathway source: CBL PDF row · CP3_article_321_one_timeCBL revision date 2026-06-16Open CBL source PDF
Buildings on lot 1
← Buildings

Article 321 · prescriptive compliance pathway

This building is on the Article 321 pathway. Article 321 does not use a numerical cap; compliance is demonstrated via the prescriptive measures package (per methodology · Article 321), which DOB does not currently publish per building. Cap, delta, and penalty columns are intentionally suppressed on Article 321 rows in this product.

2024-29
Occupancy: R-2
GFA: 25,800 sqft
Methodology: v1.0
2030-34
Occupancy: R-2
GFA: 25,800 sqft
Methodology: v1.0

LL84 GHG emissions history

Actual tCO2e reported to LL84 by report year. Each bar links to the raw LL84 row identifier under the chart for auditability.

2021130.9 tCO2e2022151.3 tCO2e2023134.8 tCO2e2024152.6 tCO2e
YearProperty typeGHGProperty GFASite EUISource EUIES scoreSource
2021Multifamily Housing130.9 tCO2e25,800 sqft89.9119.4557x5e-2fxh / 6787326
2022Multifamily Housing151.3 tCO2e25,800 sqft102.0132.1435zyy-y8am / 6787326
2023Multifamily Housing134.8 tCO2e25,800 sqft84.6111.8595zyy-y8am / 6787326
2024Multifamily Housing152.6 tCO2e25,800 sqft95.5124.1455zyy-y8am / 6787326

Enforcement events (all DOB + ECB + OATH data cross-linked to this BBL)

Open on enforcement page →
0 LL97-specific events · 9 building-scoped context events.
ECB summons issued0 LL97 · 7 scoped
Safety context record0 LL97 · 2 scoped
StageEvent dateViolationSeverityStatusPenaltySource
Safety context recordbuilding-scoped2026-03-17
FTC-AEU-HAZ
-Active-855j-jady
Safety context recordbuilding-scoped2026-03-17
FTC-AEU-HAZ
-Active-855j-jady
ECB summons issuedbuilding-scoped2025-10-25
Construction
28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER
ECB #39164841Z
CLASS - 1ACTIVE$2,5006bgk-3dad
ECB summons issuedbuilding-scoped2025-10-25
Construction
28-105.1 WORK WITHOUT A PERMIT
ECB #39164842K
CLASS - 2ACTIVE$1,2506bgk-3dad
ECB summons issuedbuilding-scoped2025-10-25
Construction
28-118.3.2 OCC CONTRARY TO THAT ALLOWED BY THE C OF O OR DOB RECORDS
ECB #39164840R
CLASS - 1ACTIVE$2,5006bgk-3dad
ECB summons issuedbuilding-scoped2025-07-28
Construction
28-105.1 WORK WITHOUT A PERMIT
ECB #39155242M
CLASS - 2ACTIVE$1,2506bgk-3dad
ECB summons issuedbuilding-scoped2025-07-28
Construction
28-105.1 WORK WITHOUT A PERMIT
ECB #39155245H
CLASS - 2ACTIVE$6256bgk-3dad
ECB summons issuedbuilding-scoped2025-07-28
Construction
28-105.1 WORK WITHOUT A PERMIT
ECB #39155243Y
CLASS - 2ACTIVE$1,2506bgk-3dad
ECB summons issuedbuilding-scoped2025-07-28
Construction
28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER
ECB #39155244X
CLASS - 2RESOLVE$06bgk-3dad

Records are the union of DOB Violations (3h2n-5cm9), ECB (6bgk-3dad), Safety Violations (855j-jady), OATH Hearings (jz4z-kudi), and OATH Trials (y3hw-z6bm) that we could link back to this BBL via BIN or address parsing. Events not tagged LL97-specific are shown as building-scoped context. See methodology · enforcement linking.

Data quality flags

  • default_value_reportedSee methodology for the exact definition of this flag; behavior may vary by pathway or period.

Full flag catalog: methodology · data quality flags

Fields we cannot show here (internal DOB data not yet public)

Processing lifecycle

DOB's internal BEAM system tracks per-building compliance stages, RCE / decarbonization plans, and mitigation credits. Those fields are not yet published as an open dataset. When DOB releases them, this product will show them here without a schema migration. Until then, the following are known gaps for this building:

  • Assessed penalty (vs theoretical)
    Actual penalty DOB assessed against a building, distinct from the theoretical over-cap exposure computed from LL84 emissions.
    Simulated · internal DOB data not yet public
    Best-effort shadow field: ecb_summons_issued
    Public release status: announced_not_yet_released
  • Audit assignment
    Buildings selected by DOB for LL97 filing audit and the audit stage.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Audit outcome
    Result of an LL97 audit (accepted / correction ordered / penalty referred).
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Extension flag
    Whether a per-building filing was accepted under a filing extension (June 30 grace or BEAM extension to August 29).
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Filing received date
    Timestamp DOB received a per-building LL97 compliance filing.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Good-faith effort application
    Whether an owner has applied for a good-faith effort determination and its status.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Mediated resolution application
    Application for the LL97 mediated resolution process and its outcome.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Notice of deficiency status
    Whether a notice of deficiency has been issued for a building and its current stage.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Per-building filing status
    Filing status for each covered BBL/BIN combination (filed / late / non-filed / exempt) as tracked in DOB's BEAM system.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Pre-OATH correspondence
    DOB correspondence with owners before an OATH matter is opened (notice of deficiency, cure letters).
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • RDP attestation
    Registered Design Professional attestation attached to each per-building compliance filing.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • RECs / offsets claimed
    Renewable Energy Credits and beneficial-use offsets claimed to reduce reported emissions.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • 60-day cure window
    The 60-day cure window state for a building under LL97 enforcement (open / cured / expired).
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
Every number on this page traces back to a Socrata dataset row or a CBL PDF revision. Where DOB does not publish a computable field (pathway, internal BEAM stage, compliance decision), we say so on the record instead of hiding the gap. See methodology.