NYC Prototypes
Skip to main content
BBL 1018490002 · BIN 1055862 · Manhattan · Block 01849, Lot 0002

351 WEST 114TH STREET

Article 321Pathway source: CBL PDF row · CP3_article_321_one_timeCBL revision date 2026-06-16Open CBL source PDF
Buildings on lot 1
← Buildings

Article 321 · prescriptive compliance pathway

This building is on the Article 321 pathway. Article 321 does not use a numerical cap; compliance is demonstrated via the prescriptive measures package (per methodology · Article 321), which DOB does not currently publish per building. Cap, delta, and penalty columns are intentionally suppressed on Article 321 rows in this product.

2024-29
Occupancy: R-2
GFA: 49,731 sqft
Methodology: v1.0
2030-34
Occupancy: R-2
GFA: 49,731 sqft
Methodology: v1.0

LL84 GHG emissions history

Actual tCO2e reported to LL84 by report year. Each bar links to the raw LL84 row identifier under the chart for auditability.

202147.6 tCO2e202250.9 tCO2e2023122.8 tCO2e2024204.6 tCO2e
YearProperty typeGHGProperty GFASite EUISource EUIES scoreSource
2021Multifamily Housing47.6 tCO2e49,721 sqft14.132.41007x5e-2fxh / 14830738
2022Multifamily Housing50.9 tCO2e49,721 sqft13.631.11005zyy-y8am / 26629849
2023Multifamily Housing122.8 tCO2e49,731 sqft37.754.31005zyy-y8am / 35461146
2024Multifamily Housing204.6 tCO2e49,731 sqft67.685.8875zyy-y8am / 35461146

Enforcement events (all DOB + ECB + OATH data cross-linked to this BBL)

Open on enforcement page →
0 LL97-specific events · 23 building-scoped context events.
DOB violation filed0 LL97 · 1 scoped
ECB summons issued0 LL97 · 16 scoped
Safety context record0 LL97 · 6 scoped
StageEvent dateViolationSeverityStatusPenaltySource
Safety context recordbuilding-scoped2026-03-17
FTC-AEU-HAZ
-Active-855j-jady
Safety context recordbuilding-scoped2026-03-17
FTC-AEU-HAZ
-Active-855j-jady
Safety context recordbuilding-scoped2026-03-17
FTC-AEU-HAZ
-Active-855j-jady
Safety context recordbuilding-scoped2026-03-17
FTC-AEU-HAZ
-Active-855j-jady
Safety context recordbuilding-scoped2026-03-17
FTC-AEU-HAZ
-Active-855j-jady
Safety context recordbuilding-scoped2026-03-17
FTC-AEU-HAZ
-Active-855j-jady
ECB summons issuedbuilding-scoped2025-07-13
Construction
28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER
ECB #39153488N
CLASS - 1ACTIVE$2,5006bgk-3dad
ECB summons issuedbuilding-scoped2025-07-13
Unknown
ECB #39153489P
CLASS - 2ACTIVE$2,5006bgk-3dad
ECB summons issuedbuilding-scoped2025-03-18
Construction
28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER
ECB #39142027R
CLASS - 1ACTIVE$2,5006bgk-3dad
ECB summons issuedbuilding-scoped2025-03-18
Construction
BC 3303.4 & 27-1018 FAILURE TO MAINTAIN ADEQUATE HOUSEKEEPING PER SECTION REQUIREMENTS
ECB #39142077P
CLASS - 1ACTIVE$2,5006bgk-3dad
ECB summons issuedbuilding-scoped2025-03-18
Construction
28-105.1 WORK WITHOUT A PERMIT
ECB #39142072X
CLASS - 1ACTIVE$2,5006bgk-3dad
ECB summons issuedbuilding-scoped2025-03-18
Construction
28-105.1 WORK WITHOUT A PERMIT
ECB #39142067L
CLASS - 1RESOLVE$06bgk-3dad
ECB summons issuedbuilding-scoped2025-03-18
Unknown
27-3017 PERFORM UNLICENSED ELECTRICAL WORK
ECB #39142062M
CLASS - 1ACTIVE$4,8006bgk-3dad
DOB violation filedbuilding-scoped2025-03-11
C-CONSTRUCTION OTHER OPTIONAL
ATOI OBSERVED THAT ON APT:#1F WAS COMPROMISED BY BUILDING MATERIALS AND DEBRIS.UNCLEAR EGRESS PATHS (3 FEET WIDE) CREATES A TRIP &HAZARD FOR SAFE ENTRY &EXIT FROM APT ALSO WALLS WERE DEMISE HOLES EVERYWHERE ELECTRICAL CABLES HANGING OFF THE WALL AND COMING THROUGH DOOR FRAMES AND MOLD THROUGHOUT THE APARTMENT NO KITCHEN SINK OR WATER IN PLACE
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9
ECB summons issuedbuilding-scoped2025-03-05
Unknown
EC 250.4 FAILURE TO PROVIDE ADEQUATE GROUNDING OF ELECTRICAL SYSTEMS
ECB #39140479Z
CLASS - 2RESOLVE$2,4006bgk-3dad
ECB summons issuedbuilding-scoped2025-01-07
Construction
28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER
ECB #39134685Z
CLASS - 2ACTIVE$6256bgk-3dad
ECB summons issuedbuilding-scoped2025-01-07
Construction
28-105.1 WORK WITHOUT A PERMIT
ECB #39134686K
CLASS - 2RESOLVE$06bgk-3dad
ECB summons issuedbuilding-scoped2025-01-03
Unknown
27-3018(B) ELECTRICAL WORK WITHOUT A PERMIT
ECB #39134483K
CLASS - 1RESOLVE$8006bgk-3dad
ECB summons issuedbuilding-scoped2025-01-03
Construction
28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER
ECB #39134486X
CLASS - 1RESOLVE$1,2506bgk-3dad
ECB summons issuedbuilding-scoped2024-10-24
Construction
27-/28-/BC-MISC MISCELLANEOUS VIOLATIONS
ECB #39128414X
CLASS - 3RESOLVE$06bgk-3dad
ECB summons issuedbuilding-scoped2024-10-24
Construction
27-/28-/BC-MISC MISCELLANEOUS VIOLATIONS
ECB #39128412M
CLASS - 3ACTIVE$5006bgk-3dad
ECB summons issuedbuilding-scoped2024-10-24
Construction
27-/28-/BC-MISC MISCELLANEOUS VIOLATIONS
ECB #39128413Y
CLASS - 3ACTIVE$5006bgk-3dad
ECB summons issuedbuilding-scoped2024-05-16
Construction
28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER
ECB #39114550N
CLASS - 3RESOLVE$2506bgk-3dad

Records are the union of DOB Violations (3h2n-5cm9), ECB (6bgk-3dad), Safety Violations (855j-jady), OATH Hearings (jz4z-kudi), and OATH Trials (y3hw-z6bm) that we could link back to this BBL via BIN or address parsing. Events not tagged LL97-specific are shown as building-scoped context. See methodology · enforcement linking.

Data quality flags

  • default_value_reportedSee methodology for the exact definition of this flag; behavior may vary by pathway or period.

Full flag catalog: methodology · data quality flags

Fields we cannot show here (internal DOB data not yet public)

Processing lifecycle

DOB's internal BEAM system tracks per-building compliance stages, RCE / decarbonization plans, and mitigation credits. Those fields are not yet published as an open dataset. When DOB releases them, this product will show them here without a schema migration. Until then, the following are known gaps for this building:

  • Assessed penalty (vs theoretical)
    Actual penalty DOB assessed against a building, distinct from the theoretical over-cap exposure computed from LL84 emissions.
    Simulated · internal DOB data not yet public
    Best-effort shadow field: ecb_summons_issued
    Public release status: announced_not_yet_released
  • Audit assignment
    Buildings selected by DOB for LL97 filing audit and the audit stage.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Audit outcome
    Result of an LL97 audit (accepted / correction ordered / penalty referred).
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Extension flag
    Whether a per-building filing was accepted under a filing extension (June 30 grace or BEAM extension to August 29).
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Filing received date
    Timestamp DOB received a per-building LL97 compliance filing.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Good-faith effort application
    Whether an owner has applied for a good-faith effort determination and its status.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Mediated resolution application
    Application for the LL97 mediated resolution process and its outcome.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Notice of deficiency status
    Whether a notice of deficiency has been issued for a building and its current stage.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Per-building filing status
    Filing status for each covered BBL/BIN combination (filed / late / non-filed / exempt) as tracked in DOB's BEAM system.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Pre-OATH correspondence
    DOB correspondence with owners before an OATH matter is opened (notice of deficiency, cure letters).
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • RDP attestation
    Registered Design Professional attestation attached to each per-building compliance filing.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • RECs / offsets claimed
    Renewable Energy Credits and beneficial-use offsets claimed to reduce reported emissions.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • 60-day cure window
    The 60-day cure window state for a building under LL97 enforcement (open / cured / expired).
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
Every number on this page traces back to a Socrata dataset row or a CBL PDF revision. Where DOB does not publish a computable field (pathway, internal BEAM stage, compliance decision), we say so on the record instead of hiding the gap. See methodology.