BBL 1018790029 · BIN 1056657 · Manhattan · Block 01879, Lot 0029

960 AMSTERDAM AVENUE

Article 321Pathway source: CBL PDF row · CP3_article_321_one_timeCBL revision date 2026-06-16Open CBL source PDF
Buildings on lot 1
← Buildings

Article 321 · prescriptive compliance pathway

This building is on the Article 321 pathway. Article 321 does not use a numerical cap; compliance is demonstrated via the prescriptive measures package (per methodology · Article 321), which DOB does not currently publish per building. Cap, delta, and penalty columns are intentionally suppressed on Article 321 rows in this product.

2024-29
Occupancy: R-2
GFA: 26,804 sqft
Methodology: v1.0
2030-34
Occupancy: R-2
GFA: 26,804 sqft
Methodology: v1.0

LL84 GHG emissions history

Actual tCO2e reported to LL84 by report year. Each bar links to the raw LL84 row identifier under the chart for auditability.

2021131.6 tCO2e2022147.1 tCO2e2023160 tCO2e2024153.1 tCO2e
YearProperty typeGHGProperty GFASite EUISource EUIES scoreSource
2021Multifamily Housing131.6 tCO2e26,804 sqft81.4134.9167x5e-2fxh / 6282778
2022Multifamily Housing147.1 tCO2e26,804 sqft86.1141.3145zyy-y8am / 6282778
2023Multifamily Housing160 tCO2e26,804 sqft83.8135.8115zyy-y8am / 6282778
2024Multifamily Housing153.1 tCO2e26,804 sqft78.1126.2195zyy-y8am / 6282778

Enforcement events (all DOB + ECB + OATH data cross-linked to this BBL)

Open on enforcement page →
0 LL97-specific events · 7 building-scoped context events.
DOB violation filed0 LL97 · 7 scoped
StageEvent dateViolationSeverityStatusPenaltySource
DOB violation filedbuilding-scoped2026-03-12
C-CONSTRUCTION OTHER OPTIONAL
FAILURE TO COMPLY WITH COMMISSIONER'S ORDER:DOB VIOLATION # 120925FEU10703AK(CONTROL #350402),WHICH REQUIRES OWNER ENGAGE A NYSPE& ENDORSED CNTRCTR TO EVAL THE ENT BLDG&PERM RPAIR UNDR PRMT,W/PRMTS FILED BY 2/9/26.AS OF 3/12/26,NO PRMT FOR PER RPAIRS HAVE BEEN FILED FOR.COMPLY W/COMM ORDER:DOB VIOLATION#120925FEU10703AK(CONTROL#350402)
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9
DOB violation filedbuilding-scoped2025-12-11
C-CONSTRUCTION OTHER OPTIONAL
FAILURE TO MAINTAIN:OBSERVED COLLAPSED ROOF,FLOOR,PARAPET WALLS,FALLEN METAL CORNICE,LOOSE MATERIALS,BROKEN WINDOW GLASS OF MULTI-LOCATIONS A T EXPOSURE 1&4,SOUTH & EAST ELEVATION.LOOSE BRICKS AND METAL CONICE HA NGING IN THE AIR DIRECT IMPACT TO BOTH PUBLIC STREET SIDES OF W107ST & AMSTERDAM AVE.REMEDY:OWNER TO RETAIN SERVICE OF A NYS REG PROFESSIONAL
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9
DOB violation filedbuilding-scoped2025-12-10
IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL
REMEDY: PROVIDE APPROXIMATELY 135 LINEAR FEET ALONG EXPOSURE 1.(WEST 1 07 STREET) AND EXTEND.APPROXIMATELY 20 LINEAR FEET FROM THE EXPOSURE 1 FAÇADE TO ENCLOSE POTENTIAL COLLAPSE ZONE.APPROXIMATELY 82 LINEAR FEET OF CONSTRUCTION FENCE TO BE ERECTED ALONG EXPOSURE 4 (AMSTERDAM.AVENUE AND RETURN 40 LINEAR FEET TO ENCLOSE AT EXPOSURE 3 TOWARDS.ADJACENT PR
-V*-DOB VIOLATION - DISMISSED-3h2n-5cm9
DOB violation filedbuilding-scoped2025-12-09
C-CONSTRUCTION OTHER OPTIONAL
EMERGENCY WORK ORDER.@TIME OF INSPCTN,OBSRVD BLDG IN A STATE OF DISREPAIR DUE TO FIRE.APPRX 50% OF ROOF IS CHARRD,PRTLLY CLLPSD,&IN DANGER OF FRTHR CLLPSE.CORNICE@EXP174 IS CHARRD,STRCTRLLY CMPRMSD IMMED FLLWNG EMRGCNY WRK DESCRIBD IN120925FEU10701AK,OWNER'S PE&ENDRSD CNTRCTR TO 1.INSTLL SIDE&ADJ PROP PRTCTNS AS REQ
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9
DOB violation filedbuilding-scoped2025-12-09
C-CONSTRUCTION OTHER OPTIONAL
EMERGENCY WORK ORDER.AT TIME OF INSPECTN,OBSRVD BLDG IN A STATE OF DISREPAIR DUE TO FIRE.APPRX 50% OF ROOF IS CHARRD,PARTIALLY CLLPSD,IN DNGR OF FRTHR CLLPSE.CORNICE@EXP1&4 IS CHARRD,STRCTRLLY CMPSD.OWNR TO IMMED RTAIN NYSPE&ENDRSD CNTRCTR TO 1.INSTLL TGHTBRD CNSTRCTN FENCE OUTSIDE OF CLLPSE ZONE,2.DEMO ENT CRNCE&RMVE
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9
DOB violation filedbuilding-scoped2025-12-09
C-CONSTRUCTION OTHER OPTIONAL
FAILURE TO MAINTAIN.@TIME OF INSPCTN,OBSRVD BLDG TO BE IN A STATE OF EXTREME DSRPAIR DUE TO FIRE.APPRX 50% OF ROOF IS CHARRED,PRTLLY CLLPSD &IN DNGR OF FRTHR CLLPSE.CORNICE@EXP1&4 IS CHARRD.OWNR TO ENGAGE NYSPE &ENDRSD CNTRCTR TO EVAL THE ENT BLDG&PERM RPAIR UNDR PRMT.FILE FOR PRMT.FILE FOR PRMTS BY 2/9/26.SGN OFF BY 4/9/26
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9
DOB violation filedbuilding-scoped2025-12-09
C-CONSTRUCTION OTHER OPTIONAL
THE STRUCTURE IS RENDERED NON COMPLIANT DUE TO FIRE DAMAGE THAT OCCURR ED ON THE 6TH FLOOR LEAVING THE ROOF EXPOSED TO THE ELEMENTS. ADDITION ALLY THE CORNICE HAS SEPARATED FROM THE PARAPET WALL, AND THE ROOF JOI ST HAVE SUSTAINED BOTH FIRE AND WATER DAMAGE
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9

Records are the union of DOB Violations (3h2n-5cm9), ECB (6bgk-3dad), Safety Violations (855j-jady), OATH Hearings (jz4z-kudi), and OATH Trials (y3hw-z6bm) that we could link back to this BBL via BIN or address parsing. Events not tagged LL97-specific are shown as building-scoped context. See methodology · enforcement linking.

Fields we cannot show here (internal DOB data not yet public)

Processing lifecycle

DOB's internal BEAM system tracks per-building compliance stages, RCE / decarbonization plans, and mitigation credits. Those fields are not yet published as an open dataset. When DOB releases them, this product will show them here without a schema migration. Until then, the following are known gaps for this building:

  • Assessed penalty (vs theoretical)
    Actual penalty DOB assessed against a building, distinct from the theoretical over-cap exposure computed from LL84 emissions.
    Simulated · internal DOB data not yet public
    Best-effort shadow field: ecb_summons_issued
    Public release status: announced_not_yet_released
  • Audit assignment
    Buildings selected by DOB for LL97 filing audit and the audit stage.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Audit outcome
    Result of an LL97 audit (accepted / correction ordered / penalty referred).
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Extension flag
    Whether a per-building filing was accepted under a filing extension (June 30 grace or BEAM extension to August 29).
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Filing received date
    Timestamp DOB received a per-building LL97 compliance filing.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Good-faith effort application
    Whether an owner has applied for a good-faith effort determination and its status.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Mediated resolution application
    Application for the LL97 mediated resolution process and its outcome.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Notice of deficiency status
    Whether a notice of deficiency has been issued for a building and its current stage.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Per-building filing status
    Filing status for each covered BBL/BIN combination (filed / late / non-filed / exempt) as tracked in DOB's BEAM system.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Pre-OATH correspondence
    DOB correspondence with owners before an OATH matter is opened (notice of deficiency, cure letters).
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • RDP attestation
    Registered Design Professional attestation attached to each per-building compliance filing.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • RECs / offsets claimed
    Renewable Energy Credits and beneficial-use offsets claimed to reduce reported emissions.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • 60-day cure window
    The 60-day cure window state for a building under LL97 enforcement (open / cured / expired).
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
Every number on this page traces back to a Socrata dataset row or a CBL PDF revision. Where DOB does not publish a computable field (pathway, internal BEAM stage, compliance decision), we say so on the record instead of hiding the gap. See methodology.