BBL 1019490026 · BIN 1059239 · Manhattan · Block 01949, Lot 0026

303 WEST 122ND STREET

Article 321Pathway source: CBL PDF row · CP3_article_321_one_timeCBL revision date 2026-06-16Open CBL source PDF
Buildings on lot 1
← Buildings

Article 321 · prescriptive compliance pathway

This building is on the Article 321 pathway. Article 321 does not use a numerical cap; compliance is demonstrated via the prescriptive measures package (per methodology · Article 321), which DOB does not currently publish per building. Cap, delta, and penalty columns are intentionally suppressed on Article 321 rows in this product.

2024-29
Occupancy: R-2
GFA: 51,051 sqft
Methodology: v1.0
2030-34
Occupancy: R-2
GFA: 51,051 sqft
Methodology: v1.0

LL84 GHG emissions history

Actual tCO2e reported to LL84 by report year. Each bar links to the raw LL84 row identifier under the chart for auditability.

2021178.9 tCO2e2022374 tCO2e2023373.4 tCO2e2024325.8 tCO2e
YearProperty typeGHGProperty GFASite EUISource EUIES scoreSource
2021Multifamily Housing178.9 tCO2e47,000 sqft51.968.8987x5e-2fxh / 20670664
2022Multifamily Housing374 tCO2e47,000 sqft105.7122.6495zyy-y8am / 20670664
2023Multifamily Housing373.4 tCO2e51,051 sqft94.0109.0525zyy-y8am / 20670664
2024Multifamily Housing325.8 tCO2e51,051 sqft81.096.1725zyy-y8am / 20670664

Enforcement events (all DOB + ECB + OATH data cross-linked to this BBL)

Open on enforcement page →
0 LL97-specific events · 18 building-scoped context events.
DOB violation filed0 LL97 · 4 scoped
ECB summons issued0 LL97 · 10 scoped
Safety context record0 LL97 · 4 scoped
StageEvent dateViolationSeverityStatusPenaltySource
DOB violation filedbuilding-scoped2026-05-13
C-CONSTRUCTION OTHER OPTIONAL
FTM BLDG IN A CODE COMPLIANT MANNER. OBSERVED DETERIORATING FACADE ON ALL EXPOSURES IN MULTIPLE LOCATIONS. SPALLED/SPALLING/CRACKED STUCCO AT PARAPET LEVEL. DAMAGED SPALLED/SPALLING BRICKWORK, DAMAGED/MISSING MORTAR JOINTS AND RUSTED SAGGING LINTELS. REMEDY: REPAIR AND/OR REPLACE
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9
ECB summons issuedbuilding-scoped2026-04-13
Construction
BC 3314.2,27-1042 ERECTED OR INSTALLED SUPPORTED SCAFFOLD 40 FEET OR HIGHER WITHOUT A PE
ECB #39552909K
CLASS - 1ACTIVE$5,0006bgk-3dad
ECB summons issuedbuilding-scoped2026-04-13
Construction
BC 3307.6,27-1021 SIDEWALK SHED DOES NOT MEET CODE SPECIFICATIONS
ECB #39552910H
CLASS - 2RESOLVE$2,4006bgk-3dad
ECB summons issuedbuilding-scoped2026-04-13
Unknown
ECB #39552908Z
CLASS - 2ACTIVE$1,2506bgk-3dad
ECB summons issuedbuilding-scoped2026-02-02
Construction
§28-105.11 FAILURE TO POST PERMIT FOR WORK AT PREMISES
ECB #39175734R
CLASS - 2RESOLVE$3006bgk-3dad
ECB summons issuedbuilding-scoped2025-12-19
Elevators
28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLAINT MANNER:SERVICE EQUIPMEN
ECB #39171037N
CLASS - 2RESOLVE$6256bgk-3dad
ECB summons issuedbuilding-scoped2025-12-03
Construction
§28-105.11 FAILURE TO POST PERMIT FOR WORK AT PREMISES
ECB #39169232X
CLASS - 2ACTIVE$3306bgk-3dad
Safety context recordbuilding-scoped2025-10-10
FTC-VT-CAT1-CO
Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction
-Active-855j-jady
DOB violation filedbuilding-scoped2025-09-19
C-CONSTRUCTION OTHER OPTIONAL
FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.AS NOTED AT TIME OF INSPECTION,OBSERVED ON EXP1 SOUTH ELEV:CRACKED,BULGING STUCCO ON PA RAPET.OPEN MORTAR JOINTS AT MULTIPLE WINDOW SILLS,CORRODED CORNICE/WAT ER TABLE AT 5TH FL SPANDRELS,LOOSE BRICK AT 5TH FL SPANDREL SW CORNER REMEDY:REPAIR AND/OR REPLACE DAMAGED FACADE AND ON ALL FOUR EXPOSURES
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9
ECB summons issuedbuilding-scoped2025-09-19
Unknown
ECB #35718503M
CLASS - 1RESOLVE$5,0006bgk-3dad
ECB summons issuedbuilding-scoped2025-09-19
Construction
BC 3307.6,27-1021 SIDEWALK SHED DOES NOT MEET CODE SPECIFICATIONS
ECB #35718502K
CLASS - 2RESOLVE$2,4006bgk-3dad
ECB summons issuedbuilding-scoped2025-03-10
Elevators
28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER: SERVICE EQUIPME
ECB #39140958X
CLASS - 1RESOLVE$1,2506bgk-3dad
ECB summons issuedbuilding-scoped2025-02-19
Elevators
28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER: SERVICE EQUIPME
ECB #39138908P
CLASS - 1RESOLVE$1,2506bgk-3dad
Safety context recordbuilding-scoped2024-10-25
FTC-BE-EXT-LP
Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device
-Active-855j-jady
DOB violation filedbuilding-scoped2024-01-10
AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
-V*-DOB VIOLATION - DISMISSED-3h2n-5cm9
Safety context recordbuilding-scoped2024-01-10
FTC-AEU-HAZ
-Dismissed-855j-jady
Safety context recordbuilding-scoped2024-01-03
FTC-AEU-HAZ
-Active-855j-jady
DOB violation filedbuilding-scoped2024-01-03
AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9

Records are the union of DOB Violations (3h2n-5cm9), ECB (6bgk-3dad), Safety Violations (855j-jady), OATH Hearings (jz4z-kudi), and OATH Trials (y3hw-z6bm) that we could link back to this BBL via BIN or address parsing. Events not tagged LL97-specific are shown as building-scoped context. See methodology · enforcement linking.

Fields we cannot show here (internal DOB data not yet public)

Processing lifecycle

DOB's internal BEAM system tracks per-building compliance stages, RCE / decarbonization plans, and mitigation credits. Those fields are not yet published as an open dataset. When DOB releases them, this product will show them here without a schema migration. Until then, the following are known gaps for this building:

  • Assessed penalty (vs theoretical)
    Actual penalty DOB assessed against a building, distinct from the theoretical over-cap exposure computed from LL84 emissions.
    Simulated · internal DOB data not yet public
    Best-effort shadow field: ecb_summons_issued
    Public release status: announced_not_yet_released
  • Audit assignment
    Buildings selected by DOB for LL97 filing audit and the audit stage.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Audit outcome
    Result of an LL97 audit (accepted / correction ordered / penalty referred).
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Extension flag
    Whether a per-building filing was accepted under a filing extension (June 30 grace or BEAM extension to August 29).
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Filing received date
    Timestamp DOB received a per-building LL97 compliance filing.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Good-faith effort application
    Whether an owner has applied for a good-faith effort determination and its status.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Mediated resolution application
    Application for the LL97 mediated resolution process and its outcome.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Notice of deficiency status
    Whether a notice of deficiency has been issued for a building and its current stage.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Per-building filing status
    Filing status for each covered BBL/BIN combination (filed / late / non-filed / exempt) as tracked in DOB's BEAM system.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Pre-OATH correspondence
    DOB correspondence with owners before an OATH matter is opened (notice of deficiency, cure letters).
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • RDP attestation
    Registered Design Professional attestation attached to each per-building compliance filing.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • RECs / offsets claimed
    Renewable Energy Credits and beneficial-use offsets claimed to reduce reported emissions.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • 60-day cure window
    The 60-day cure window state for a building under LL97 enforcement (open / cured / expired).
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
Every number on this page traces back to a Socrata dataset row or a CBL PDF revision. Where DOB does not publish a computable field (pathway, internal BEAM stage, compliance decision), we say so on the record instead of hiding the gap. See methodology.