NYC Prototypes
Skip to main content
BBL 1019750001 · BIN 1059646 · Manhattan · Block 01975, Lot 0001

3040 BROADWAY

Article 320Pathway source: CBL PDF row · CP0_article_320_2024CBL revision date 2026-06-16Open CBL source PDF
Buildings on lot 6
← Buildings

Article 320 · numerical caps & computed exposure

How this is computed
PeriodOccupancyGFACapActualDeltaEst. penaltyStatusMethodology
2024-29B(medium)641,800 sqft5,429.6 tCO2e6,701 tCO2e+1,271.4$340,722
Over capEJ · PEJA fallback
v1.0
2030-34B(medium)641,800 sqft2,907.4 tCO2e6,701 tCO2e+3,793.6$1,016,692
Over capEJ · PEJA fallback
v1.0

Cap = Σ (occupancy_coefficient × gross_floor_area) using DOB LL97 rules; actual GHG is the most recent LL84 filing. Delta is positive when actual exceeds cap. Estimated penalty is DOB's public $268/tCO2e × delta with a 30-day grace applied via penalty_estimate_usd.

LL84 GHG emissions history

Actual tCO2e reported to LL84 by report year. Each bar links to the raw LL84 row identifier under the chart for auditability.

20216,156.7 tCO2e20227,085.2 tCO2e20237,096.1 tCO2e20246,701 tCO2e
YearProperty typeGHGProperty GFASite EUISource EUIES scoreSource
2021College/University6,156.7 tCO2e641,800 sqft166.7234.5-7x5e-2fxh / 4408910
2022College/University7,085.2 tCO2e641,800 sqft180.2263.7-5zyy-y8am / 4408910
2023College/University7,096.1 tCO2e641,800 sqft165.2244.1-5zyy-y8am / 4408910
2024College/University6,701 tCO2e641,800 sqft157.1224.2-5zyy-y8am / 4408910

Enforcement events (all DOB + ECB + OATH data cross-linked to this BBL)

Open on enforcement page →
0 LL97-specific events · 12 building-scoped context events.
DOB violation filed0 LL97 · 3 scoped
ECB summons issued0 LL97 · 5 scoped
Safety context record0 LL97 · 4 scoped
StageEvent dateViolationSeverityStatusPenaltySource
ECB summons issuedbuilding-scoped2026-02-04
Construction
28-302.1 FAILURE TO MAINTAIN BLDG WALL(S) OR APPURTENANCES
ECB #35726632Z
CLASS - 2RESOLVE$1,2506bgk-3dad
Safety context recordbuilding-scoped2025-10-31
FTF-PL-PER
Cycle 1, Sub-cycle C (premises is in Community District 9)
-Active-855j-jady
Safety context recordbuilding-scoped2025-10-31
FTF-PL-PER
Cycle 1, Sub-cycle C (premises is in Community District 9)
-Active-855j-jady
Safety context recordbuilding-scoped2025-10-31
FTF-PL-PER
Cycle 1, Sub-cycle C (premises is in Community District 9)
-Active-855j-jady
Safety context recordbuilding-scoped2024-12-23
FTC-AEU-HAZ
-Dismissed-855j-jady
DOB violation filedbuilding-scoped2024-12-23
AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
-V*-DOB VIOLATION - DISMISSED-3h2n-5cm9
ECB summons issuedbuilding-scoped2024-12-03
Construction
28-302.1 FAILURE TO MAINTAIN BLDG WALL(S) OR APPURTENANCES
ECB #35686999L
CLASS - 1RESOLVE$06bgk-3dad
ECB summons issuedbuilding-scoped2024-10-21
Construction
28-302.1 FAILURE TO MAINTAIN BLDG WALL(S) OR APPURTENANCES
ECB #35686645Y
CLASS - 1RESOLVE$2,5006bgk-3dad
DOB violation filedbuilding-scoped2024-10-21
C-CONSTRUCTION OTHER OPTIONAL
EMERGENCY WORK ORDER DUE TO DEFECTIVE FACADE. IMMINENT CONDITIONS SUCH AS BULGING/DISPLACED AND SPALLING MASONRY OBSERVED.NO SAFETY MEASURES IN PLACE @ EXP1-S,EXP4-E & EXP3-N. REMEDY:IMMEDIATELY TAKE/PROVIDE SAFETY TO PROTECT PUBLIC. IMMEDIATELY REMOVE LOOSE MATERIAL AND MAKE REPAIRS UNDER SUPERVISION OF NYS LICENSED PROFESSIONAL
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9
DOB violation filedbuilding-scoped2024-10-02
C-CONSTRUCTION OTHER OPTIONAL
ATOI A PLACE OF PUBLIC ASSEMBLY THE COWIN CENTER AUDITORIUM, LOCATED AT 1ST FL AND 2ND FL OF PREMISES AUDITORIUM IS A 632 SEAT VENUE, OPERATED WITHOUT DOB PLACE OF ASSEMBLY PERMIT
-V*-DOB VIOLATION - DISMISSED-3h2n-5cm9
ECB summons issuedbuilding-scoped2024-10-02
Construction
27-/28-/BC-MISC MISCELLANEOUS VIOLATIONS
ECB #39126303Y
CLASS - 2ACTIVE$1,2506bgk-3dad
ECB summons issuedbuilding-scoped2024-01-16
Local Law
28-302.5 FAILURE TO FILE AN AMENDED REPORT ACCEPTABLE TO THIS DEPARTMENT INDICA
ECB #37026521L
CLASS - 2RESOLVE$1,2506bgk-3dad

Records are the union of DOB Violations (3h2n-5cm9), ECB (6bgk-3dad), Safety Violations (855j-jady), OATH Hearings (jz4z-kudi), and OATH Trials (y3hw-z6bm) that we could link back to this BBL via BIN or address parsing. Events not tagged LL97-specific are shown as building-scoped context. See methodology · enforcement linking.

Fields we cannot show here (internal DOB data not yet public)

Processing lifecycle

DOB's internal BEAM system tracks per-building compliance stages, RCE / decarbonization plans, and mitigation credits. Those fields are not yet published as an open dataset. When DOB releases them, this product will show them here without a schema migration. Until then, the following are known gaps for this building:

  • Assessed penalty (vs theoretical)
    Actual penalty DOB assessed against a building, distinct from the theoretical over-cap exposure computed from LL84 emissions.
    Simulated · internal DOB data not yet public
    Best-effort shadow field: ecb_summons_issued
    Public release status: announced_not_yet_released
  • Audit assignment
    Buildings selected by DOB for LL97 filing audit and the audit stage.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Audit outcome
    Result of an LL97 audit (accepted / correction ordered / penalty referred).
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Extension flag
    Whether a per-building filing was accepted under a filing extension (June 30 grace or BEAM extension to August 29).
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Filing received date
    Timestamp DOB received a per-building LL97 compliance filing.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Good-faith effort application
    Whether an owner has applied for a good-faith effort determination and its status.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Mediated resolution application
    Application for the LL97 mediated resolution process and its outcome.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Notice of deficiency status
    Whether a notice of deficiency has been issued for a building and its current stage.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Per-building filing status
    Filing status for each covered BBL/BIN combination (filed / late / non-filed / exempt) as tracked in DOB's BEAM system.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Pre-OATH correspondence
    DOB correspondence with owners before an OATH matter is opened (notice of deficiency, cure letters).
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • RDP attestation
    Registered Design Professional attestation attached to each per-building compliance filing.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • RECs / offsets claimed
    Renewable Energy Credits and beneficial-use offsets claimed to reduce reported emissions.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • 60-day cure window
    The 60-day cure window state for a building under LL97 enforcement (open / cured / expired).
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
Every number on this page traces back to a Socrata dataset row or a CBL PDF revision. Where DOB does not publish a computable field (pathway, internal BEAM stage, compliance decision), we say so on the record instead of hiding the gap. See methodology.