AMSTERDAM AVENUE
CP4_city_portfolioCBL revision date 2026-06-16Open CBL source PDFArticle 320 · numerical caps & computed exposure
How this is computed| Period | Occupancy | GFA | Cap | Actual | Delta | Est. penalty | Status | Methodology |
|---|---|---|---|---|---|---|---|---|
| 2024-29 | R-2(high) | 1,291,359 sqft | 8,716.7 tCO2e | 11,774 tCO2e | +3,057.5 | $819,417 | Over capEJ · PEJA fallback | v1.0 |
| 2030-34 | R-2(high) | 1,291,359 sqft | 5,255.8 tCO2e | 11,774 tCO2e | +6,518.4 | $1,746,923 | Over capEJ · PEJA fallback | v1.0 |
Cap = Σ (occupancy_coefficient × gross_floor_area) using DOB LL97 rules; actual GHG is the most recent LL84 filing. Delta is positive when actual exceeds cap. Estimated penalty is DOB's public $268/tCO2e × delta with a 30-day grace applied via penalty_estimate_usd.
LL84 GHG emissions history
Actual tCO2e reported to LL84 by report year. Each bar links to the raw LL84 row identifier under the chart for auditability.
| Year | Property type | GHG | Property GFA | Site EUI | Source EUI | ES score | Source |
|---|---|---|---|---|---|---|---|
| 2024 | Multifamily Housing | 11,774 tCO2e | 1,291,359 sqft | 144.0 | 192.7 | 2 | 5zyy-y8am / 50953892 |
Enforcement events (all DOB + ECB + OATH data cross-linked to this BBL)
Open on enforcement page →| Stage | Event date | Violation | Severity | Status | Penalty | Source |
|---|---|---|---|---|---|---|
| ECB summons issuedbuilding-scoped | 2026-06-18 | Elevators 28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER: SERVICE EQUIPME ECB #39193112L | CLASS - 1 | ACTIVE | $1,250 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2026-06-17 | Construction 28-302.1 FAILURE TO MAINTAIN BLDG WALL(S) OR APPURTENANCES ECB #35730628H | CLASS - 2 | ACTIVE | $2,500 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2026-04-29 | Elevators 28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER: SERVICE EQUIPME ECB #39186502L | CLASS - 1 | ACTIVE | $1,250 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2026-02-13 | Elevators 28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER: SERVICE EQUIPME ECB #39177314J | CLASS - 1 | ACTIVE | $1,250 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2026-02-09 | Unknown 27-3018(B) ELECTRICAL WORK WITHOUT A PERMIT ECB #39177476M | CLASS - 1 | ACTIVE | $2,500 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2026-01-30 | Unknown ECB #39549672Y | CLASS - 1 | RESOLVE | $0 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2026-01-17 | Unknown ECB #39549277Y | CLASS - 2 | ACTIVE | $10,000 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2026-01-17 | Construction 28-105.1 WORK AFTER HOURS W/O VARIANCE PERMIT CONTRARY TO 28-105.12.5 ECB #39549278X | CLASS - 1 | ACTIVE | $2,500 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2026-01-12 | Construction BC 3301.2,27-1009(A) FAIL TO SAFEGUARD PERS/PROPERTY AFFECTED BY CONSTRUCTION OP ECB #39549053P | CLASS - 2 | RESOLVE | $5,000 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2025-11-19 | Construction 28-105.12.2 WRK DOESN'T CONFORM TO APPROV DOCS AND/OR APPROV AMENDMENTS ECB #39547127J | CLASS - 2 | ACTIVE | $6,250 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2025-11-19 | Construction BC 3307.6,27-1021 SIDEWALK SHED DOES NOT MEET CODE SPECIFICATIONS ECB #39547128L | CLASS - 2 | ACTIVE | $10,000 | 6bgk-3dad |
| Safety context recordbuilding-scoped | 2025-10-10 | FTC-VT-CAT1-HA Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction | - | Dismissed | - | 855j-jady |
| ECB summons issuedbuilding-scoped | 2025-10-07 | Construction AC 1RCNY-MISC,RS-MISC MISCELLANEOUS VIOLATIONS ECB #39545692N | CLASS - 2 | RESOLVE | $0 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2025-07-21 | Construction BC 3307.6,27-1021 SIDEWALK SHED DOES NOT MEET CODE SPECIFICATIONS ECB #39542608H | CLASS - 2 | ACTIVE | $10,000 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2025-07-21 | Construction BC 3307.6,27-1021 SIDEWALK SHED DOES NOT MEET CODE SPECIFICATIONS ECB #39542602R | CLASS - 2 | RESOLVE | $5,000 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2025-02-05 | Construction BC 3307.6,27-1021 SIDEWALK SHED DOES NOT MEET CODE SPECIFICATIONS ECB #39536647J | CLASS - 2 | RESOLVE | $2,400 | 6bgk-3dad |
| Safety context recordbuilding-scoped | 2024-10-25 | FTC-BE-EXT-LP Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device | - | Dismissed | - | 855j-jady |
| Safety context recordbuilding-scoped | 2024-10-25 | FTC-BE-EXT-LP Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device | - | Dismissed | - | 855j-jady |
| Safety context recordbuilding-scoped | 2024-10-25 | FTC-BE-EXT-LP Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device | - | Dismissed | - | 855j-jady |
| Safety context recordbuilding-scoped | 2024-10-25 | FTC-BE-EXT-LP Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device | - | Dismissed | - | 855j-jady |
| ECB summons issuedbuilding-scoped | 2024-09-13 | Construction 28-302.1 FAILURE TO MAINTAIN BLDG WALL(S) OR APPURTENANCES ECB #35688613Z | CLASS - 2 | ACTIVE | $3,125 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2024-09-13 | Construction 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER ECB #35688614K | CLASS - 2 | ACTIVE | $625 | 6bgk-3dad |
| DOB violation filedbuilding-scoped | 2024-06-23 | EARCX-FAILURE TO SUBMIT EER NONE FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2023) | - | V*-DOB VIOLATION - DISMISSED | - | 3h2n-5cm9 |
| Safety context recordbuilding-scoped | 2024-06-23 | FTF-EN-EARCX | - | Dismissed | - | 855j-jady |
Records are the union of DOB Violations (3h2n-5cm9), ECB (6bgk-3dad), Safety Violations (855j-jady), OATH Hearings (jz4z-kudi), and OATH Trials (y3hw-z6bm) that we could link back to this BBL via BIN or address parsing. Events not tagged LL97-specific are shown as building-scoped context. See methodology · enforcement linking.
Fields we cannot show here (internal DOB data not yet public)
Processing lifecycleDOB's internal BEAM system tracks per-building compliance stages, RCE / decarbonization plans, and mitigation credits. Those fields are not yet published as an open dataset. When DOB releases them, this product will show them here without a schema migration. Until then, the following are known gaps for this building:
- Simulated · internal DOB data not yet publicAssessed penalty (vs theoretical)Actual penalty DOB assessed against a building, distinct from the theoretical over-cap exposure computed from LL84 emissions.Best-effort shadow field:
ecb_summons_issuedPublic release status: announced_not_yet_released - Simulated · internal DOB data not yet publicAudit assignmentBuildings selected by DOB for LL97 filing audit and the audit stage.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicAudit outcomeResult of an LL97 audit (accepted / correction ordered / penalty referred).Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicExtension flagWhether a per-building filing was accepted under a filing extension (June 30 grace or BEAM extension to August 29).Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicFiling received dateTimestamp DOB received a per-building LL97 compliance filing.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicGood-faith effort applicationWhether an owner has applied for a good-faith effort determination and its status.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicMediated resolution applicationApplication for the LL97 mediated resolution process and its outcome.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicNotice of deficiency statusWhether a notice of deficiency has been issued for a building and its current stage.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicPer-building filing statusFiling status for each covered BBL/BIN combination (filed / late / non-filed / exempt) as tracked in DOB's BEAM system.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicPre-OATH correspondenceDOB correspondence with owners before an OATH matter is opened (notice of deficiency, cure letters).Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicRDP attestationRegistered Design Professional attestation attached to each per-building compliance filing.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicRECs / offsets claimedRenewable Energy Credits and beneficial-use offsets claimed to reduce reported emissions.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet public60-day cure windowThe 60-day cure window state for a building under LL97 enforcement (open / cured / expired).Public release status: announced_not_yet_released