BBL 1020010058 · BIN 1059944 · Manhattan · Block 02001, Lot 0058

634 WEST 135TH STREET

Article 321Pathway source: CBL PDF row · CP3_article_321_one_timeCBL revision date 2026-06-16Open CBL source PDF
Buildings on lot 1
← Buildings

Article 321 · prescriptive compliance pathway

This building is on the Article 321 pathway. Article 321 does not use a numerical cap; compliance is demonstrated via the prescriptive measures package (per methodology · Article 321), which DOB does not currently publish per building. Cap, delta, and penalty columns are intentionally suppressed on Article 321 rows in this product.

2024-29
Occupancy: R-2
GFA: 37,506 sqft
Methodology: v1.0
2030-34
Occupancy: R-2
GFA: 37,506 sqft
Methodology: v1.0

LL84 GHG emissions history

Actual tCO2e reported to LL84 by report year. Each bar links to the raw LL84 row identifier under the chart for auditability.

2021309.3 tCO2e2022291.9 tCO2e202369.3 tCO2e202472.4 tCO2e
YearProperty typeGHGProperty GFASite EUISource EUIES scoreSource
2021Multifamily Housing309.3 tCO2e37,506 sqft111.0140.1477x5e-2fxh / 6670223
2022Multifamily Housing291.9 tCO2e37,506 sqft103.6134.4565zyy-y8am / 6670223
2023Multifamily Housing69.3 tCO2e37,506 sqft18.646.61005zyy-y8am / 33173709
2024Multifamily Housing72.4 tCO2e37,506 sqft18.546.21005zyy-y8am / 33173709

Enforcement events (all DOB + ECB + OATH data cross-linked to this BBL)

Open on enforcement page →
0 LL97-specific events · 22 building-scoped context events.
DOB violation filed0 LL97 · 9 scoped
ECB summons issued0 LL97 · 8 scoped
Safety context record0 LL97 · 5 scoped
StageEvent dateViolationSeverityStatusPenaltySource
ECB summons issuedbuilding-scoped2026-06-23
Elevators
28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER: SERVICE EQUIPME
ECB #39193464P
CLASS - 1ACTIVE$1,2506bgk-3dad
ECB summons issuedbuilding-scoped2026-03-17
Elevators
28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLAINT MANNER:SERVICE EQUIPMEN
ECB #39180651H
CLASS - 2ACTIVE$6256bgk-3dad
ECB summons issuedbuilding-scoped2025-04-08
Local Law
28-302.4 FAILURE TO SUBMIT A REQUIRED REPORT OF CRITICAL EXAMINATION DOCUMENTIN
ECB #37034497K
CLASS - 2ACTIVE$6,2506bgk-3dad
DOB violation filedbuilding-scoped2024-12-11
AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9
DOB violation filedbuilding-scoped2024-12-11
AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9
Safety context recordbuilding-scoped2024-12-11
FTC-AEU-HAZ
-Active-855j-jady
DOB violation filedbuilding-scoped2024-12-11
AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9
Safety context recordbuilding-scoped2024-12-11
FTC-AEU-HAZ
-Active-855j-jady
Safety context recordbuilding-scoped2024-12-11
FTC-AEU-HAZ
-Active-855j-jady
ECB summons issuedbuilding-scoped2024-09-27
Construction
27-369,BC 1020.2 FAIL TO PROVIDE UNOBSTRUCTED EXIT PASSAGEWAY
ECB #35686403L
CLASS - 1ACTIVE$1,2806bgk-3dad
DOB violation filedbuilding-scoped2024-09-27
C-CONSTRUCTION OTHER OPTIONAL
FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER.AT TIME OF INS PECTION IT WAS OBSERVED AT EXP1 NORTH ELEV,FLOWER POTS IMPROPERLY SUPP ORTED ON WINDOW SILLS AT MULTIPLE LOCATIONS.SPALLED CONCRETE AT ROOF L EVEL.AT EXP3 SOUTH ELEV IMPROPERLY SUPPORTED AC UNITS WERE OBSERVED.CR ACKED WINDOW SILLS,DETERIORATED FRAME.REMEDY:REPAIR AND/OR REPLACE
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9
ECB summons issuedbuilding-scoped2024-05-16
Construction
27-369,BC 1020.2 FAIL TO PROVIDE UNOBSTRUCTED EXIT PASSAGEWAY
ECB #35681907M
CLASS - 1ACTIVE$1,2806bgk-3dad
DOB violation filedbuilding-scoped2024-05-16
C-CONSTRUCTION OTHER OPTIONAL
FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER. OBSERVED AT EXP#1 (N. ELEV) MISSING MORTAR JOINT IN ADEQUATE AC SUPPORT A BULGING MASONRY AT NW CORNER & OPEN MORTAR JOINTS;STEP CRACKS & DETERIORATING WINDOW FRAMING @ EXP#3 (S ELEV.) REMEDY: FIX AND/OR REPLACE
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9
ECB summons issuedbuilding-scoped2024-04-03
Construction
BC 3307.6,27-1021 SIDEWALK SHED DOES NOT MEET CODE SPECIFICATIONS
ECB #39527071L
CLASS - 2RESOLVE$06bgk-3dad
Safety context recordbuilding-scoped2024-03-06
FTC-AEU-HAZ
-Active-855j-jady
DOB violation filedbuilding-scoped2024-03-06
AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9
Safety context recordbuilding-scoped2024-02-22
FISPNRF
FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024
-Active-855j-jady
DOB violation filedbuilding-scoped2024-02-22
FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED
FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9
ECB summons issuedbuilding-scoped2024-01-08
Construction
AC 28-204.4 FAIL TO COMPLY W/COMMISSIONER ORDER TO FILE CERT OF CORRECTION W/DOB
ECB #35675574M
CLASS - 1RESOLVE$1,2506bgk-3dad
ECB summons issuedbuilding-scoped2024-01-08
Construction
28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER
ECB #35675573K
CLASS - 1ACTIVE$3,1256bgk-3dad
DOB violation filedbuilding-scoped2024-01-08
C-CONSTRUCTION OTHER OPTIONAL
EMERGENCY WORK ORDER DUE TO THE CONDITIONS AS FOLLOWS: OPEN MORTAR JOI JOINTS(CRACKS IN MASONRY AT SEVERAL LOCATIONS ONEXP#1(INADEQUATE AC SUPPORTEXP#1,2,&3 INADEQ.REPAIRS/CRACKED STUCCO/CRACKS@PARAPET LEVEL O EXP#2 STEP CRACKS(BULGING MASONRY ON EXP#3 INADEQ.PARAPET HGHT;SEVERLY DAMAGED LINE OF WINDOWS.REMEDY:IMMED.REPAIRS UNDER SUPERV.OR LIC.PROF
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9
DOB violation filedbuilding-scoped2024-01-08
C-CONSTRUCTION OTHER OPTIONAL
FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER.AT TIME OF INSPECTION OBSERVED OPEN MORTAR JOINTS/CRACK IN MASONRY AT SEVERAL LOC ON EXP#1 IN-ADEQUATE AC SUPPORTS ON EXP#1,2,&3.INADEQ.REPAIRS/CRACKED STUCCO/CRACKS@ PARAPET LEVEL ON EXP#2 STEP CRACKS BULGING.MASONRY ON EXP#2 INADEQ.PARAPET HGHT.REMEDY:MAINT EXTERIOR BLDGE FIX &/OR REPLACE
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9

Records are the union of DOB Violations (3h2n-5cm9), ECB (6bgk-3dad), Safety Violations (855j-jady), OATH Hearings (jz4z-kudi), and OATH Trials (y3hw-z6bm) that we could link back to this BBL via BIN or address parsing. Events not tagged LL97-specific are shown as building-scoped context. See methodology · enforcement linking.

Fields we cannot show here (internal DOB data not yet public)

Processing lifecycle

DOB's internal BEAM system tracks per-building compliance stages, RCE / decarbonization plans, and mitigation credits. Those fields are not yet published as an open dataset. When DOB releases them, this product will show them here without a schema migration. Until then, the following are known gaps for this building:

  • Assessed penalty (vs theoretical)
    Actual penalty DOB assessed against a building, distinct from the theoretical over-cap exposure computed from LL84 emissions.
    Simulated · internal DOB data not yet public
    Best-effort shadow field: ecb_summons_issued
    Public release status: announced_not_yet_released
  • Audit assignment
    Buildings selected by DOB for LL97 filing audit and the audit stage.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Audit outcome
    Result of an LL97 audit (accepted / correction ordered / penalty referred).
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Extension flag
    Whether a per-building filing was accepted under a filing extension (June 30 grace or BEAM extension to August 29).
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Filing received date
    Timestamp DOB received a per-building LL97 compliance filing.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Good-faith effort application
    Whether an owner has applied for a good-faith effort determination and its status.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Mediated resolution application
    Application for the LL97 mediated resolution process and its outcome.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Notice of deficiency status
    Whether a notice of deficiency has been issued for a building and its current stage.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Per-building filing status
    Filing status for each covered BBL/BIN combination (filed / late / non-filed / exempt) as tracked in DOB's BEAM system.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Pre-OATH correspondence
    DOB correspondence with owners before an OATH matter is opened (notice of deficiency, cure letters).
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • RDP attestation
    Registered Design Professional attestation attached to each per-building compliance filing.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • RECs / offsets claimed
    Renewable Energy Credits and beneficial-use offsets claimed to reduce reported emissions.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • 60-day cure window
    The 60-day cure window state for a building under LL97 enforcement (open / cured / expired).
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
Every number on this page traces back to a Socrata dataset row or a CBL PDF revision. Where DOB does not publish a computable field (pathway, internal BEAM stage, compliance decision), we say so on the record instead of hiding the gap. See methodology.