NYC Prototypes
Skip to main content
BBL 1020160050 · BIN 1079770 · Manhattan · Block 02016, Lot 0050

2541 ADAM C POWELL BOULEVARD

Article 320Pathway source: CBL PDF row · CP2_article_320_2035CBL revision date 2026-06-16Open CBL source PDF
Buildings on lot 5
← Buildings

Article 320 · numerical caps & computed exposure

How this is computed
PeriodOccupancyGFACapActualDeltaEst. penaltyStatusMethodology
2024-29R-2(high)1,508,300 sqft10,181 tCO2e12,839 tCO2e+2,658.1$712,364
Over capEJ · PEJA fallback
v1.0
2030-34R-2(high)1,508,300 sqft6,138.8 tCO2e12,839 tCO2e+6,700.3$1,795,685
Over capEJ · PEJA fallback
v1.0

Cap = Σ (occupancy_coefficient × gross_floor_area) using DOB LL97 rules; actual GHG is the most recent LL84 filing. Delta is positive when actual exceeds cap. Estimated penalty is DOB's public $268/tCO2e × delta with a 30-day grace applied via penalty_estimate_usd.

LL84 GHG emissions history

Actual tCO2e reported to LL84 by report year. Each bar links to the raw LL84 row identifier under the chart for auditability.

202112,087 tCO2e20222,019.4 tCO2e202312,277 tCO2e202412,839 tCO2e
YearProperty typeGHGProperty GFASite EUISource EUIES scoreSource
2021Multifamily Housing12,087 tCO2e1,507,800 sqft138.8181.6-7x5e-2fxh / 6690843
2022Multifamily Housing2,019.4 tCO2e1,508,300 sqft16.642.91005zyy-y8am / 4994395
2023Multifamily Housing12,277 tCO2e1,508,300 sqft133.3173.375zyy-y8am / 4994395
2024Multifamily Housing12,839 tCO2e1,508,300 sqft137.3178.665zyy-y8am / 4994395

Enforcement events (all DOB + ECB + OATH data cross-linked to this BBL)

Open on enforcement page →
0 LL97-specific events · 114 building-scoped context events.
DOB violation filed0 LL97 · 13 scoped
ECB summons issued0 LL97 · 41 scoped
Safety context record0 LL97 · 60 scoped
StageEvent dateViolationSeverityStatusPenaltySource
ECB summons issuedbuilding-scoped2026-05-27
Boilers
28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: SERVICE EQUIPME
ECB #39190021M
CLASS - 2ACTIVE$1,2506bgk-3dad
ECB summons issuedbuilding-scoped2026-05-27
Boilers
28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: SERVICE EQUIPME
ECB #39190022Y
CLASS - 2ACTIVE$1,2506bgk-3dad
ECB summons issuedbuilding-scoped2026-05-27
Boilers
28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: SERVICE EQUIPME
ECB #39190023X
CLASS - 2ACTIVE$1,2506bgk-3dad
ECB summons issuedbuilding-scoped2026-05-27
Boilers
28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: SERVICE EQUIPME
ECB #39190024H
CLASS - 2ACTIVE$1,2506bgk-3dad
Safety context recordbuilding-scoped2026-03-17
FTC-AEU-HAZ
-Dismissed-855j-jady
ECB summons issuedbuilding-scoped2026-03-06
Boilers
28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: SERVICE EQUIPME
ECB #39179430X
CLASS - 2ACTIVE$1,2506bgk-3dad
ECB summons issuedbuilding-scoped2026-03-06
Boilers
28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: SERVICE EQUIPME
ECB #39179432J
CLASS - 2ACTIVE$1,2506bgk-3dad
ECB summons issuedbuilding-scoped2026-03-06
Boilers
28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: SERVICE EQUIPME
ECB #39179436R
CLASS - 2ACTIVE$1,2506bgk-3dad
ECB summons issuedbuilding-scoped2026-01-12
Elevators
28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLAINT MANNER:SERVICE EQUIPMEN
ECB #39173363H
CLASS - 2RESOLVE$3126bgk-3dad
ECB summons issuedbuilding-scoped2026-01-12
Elevators
28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLAINT MANNER:SERVICE EQUIPMEN
ECB #39173364J
CLASS - 2RESOLVE$3126bgk-3dad
ECB summons issuedbuilding-scoped2026-01-12
Elevators
28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLAINT MANNER:SERVICE EQUIPMEN
ECB #39173366N
CLASS - 2RESOLVE$3126bgk-3dad
ECB summons issuedbuilding-scoped2026-01-12
Elevators
28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER: SERVICE EQUIPME
ECB #39173365L
CLASS - 1RESOLVE$1,2506bgk-3dad
Safety context recordbuilding-scoped2026-01-08
FTF-PL-PER
Cycle 2, Sub-cycle A (premises is in Community District 10)
-Active-855j-jady
Safety context recordbuilding-scoped2026-01-08
FTF-PL-PER
Cycle 2, Sub-cycle A (premises is in Community District 10)
-Active-855j-jady
Safety context recordbuilding-scoped2026-01-08
FTF-PL-PER
Cycle 2, Sub-cycle A (premises is in Community District 10)
-Active-855j-jady
Safety context recordbuilding-scoped2026-01-08
FTF-PL-PER
Cycle 2, Sub-cycle A (premises is in Community District 10)
-Active-855j-jady
ECB summons issuedbuilding-scoped2025-12-08
Boilers
28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: SERVICE EQUIPME
ECB #39169585L
CLASS - 2ACTIVE$6,2506bgk-3dad
DOB violation filedbuilding-scoped2025-11-14
HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL HGH PRESSURE INSPECTION
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9
Safety context recordbuilding-scoped2025-11-14
HBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL HGH PRESSURE INSPECTION
-Active-855j-jady
Safety context recordbuilding-scoped2025-11-14
HBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2024 INTERNAL HGH PRESSURE INSPECTION
-Active-855j-jady
DOB violation filedbuilding-scoped2025-11-14
HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2024 INTERNAL HGH PRESSURE INSPECTION
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9
ECB summons issuedbuilding-scoped2025-11-07
Boilers
28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: SERVICE EQUIPME
ECB #39166230Z
CLASS - 3ACTIVE$5006bgk-3dad
ECB summons issuedbuilding-scoped2025-11-07
Boilers
28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: SERVICE EQUIPME
ECB #39166229L
CLASS - 2ACTIVE$6,2506bgk-3dad
ECB summons issuedbuilding-scoped2025-11-07
Boilers
28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: SERVICE EQUIPME
ECB #39166223K
CLASS - 2ACTIVE$6,2506bgk-3dad
ECB summons issuedbuilding-scoped2025-11-07
Boilers
28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: SERVICE EQUIPME
ECB #39166231K
CLASS - 2ACTIVE$6,2506bgk-3dad
Safety context recordbuilding-scoped2025-08-29
FTF-VT-PER-CO
Violation Issued-Failure To File 2024 Periodic Inspection Report
-Active-855j-jady
Safety context recordbuilding-scoped2025-08-29
FTF-VT-PER-CO
Violation Issued-Failure To File 2024 Periodic Inspection Report
-Active-855j-jady
Safety context recordbuilding-scoped2025-08-29
FTF-VT-CAT1-CO
Violation Issued-Failure To File 2024 Cat1 Test Report
-Active-855j-jady
Safety context recordbuilding-scoped2025-08-29
FTF-VT-PER-CO
Violation Issued-Failure To File 2024 Periodic Inspection Report
-Active-855j-jady
Safety context recordbuilding-scoped2025-08-29
FTF-VT-CAT1-CO
Violation Issued-Failure To File 2024 Cat1 Test Report
-Active-855j-jady
Safety context recordbuilding-scoped2025-08-29
FTF-VT-PER-CO
Violation Issued-Failure To File 2024 Periodic Inspection Report
-Active-855j-jady
Safety context recordbuilding-scoped2025-08-29
FTF-VT-PER-CO
Violation Issued-Failure To File 2024 Periodic Inspection Report
-Active-855j-jady
Safety context recordbuilding-scoped2025-08-29
FTF-VT-PER-CO
Violation Issued-Failure To File 2024 Periodic Inspection Report
-Active-855j-jady
Safety context recordbuilding-scoped2025-08-29
FTF-VT-PER-CO
Violation Issued-Failure To File 2024 Periodic Inspection Report
-Active-855j-jady
Safety context recordbuilding-scoped2025-08-29
FTF-VT-CAT1-CO
Violation Issued-Failure To File 2024 Cat1 Test Report
-Active-855j-jady
Safety context recordbuilding-scoped2025-08-29
FTF-VT-PER-CO
Violation Issued-Failure To File 2024 Periodic Inspection Report
-Active-855j-jady
Safety context recordbuilding-scoped2025-08-29
FTF-VT-CAT1-CO
Violation Issued-Failure To File 2024 Cat1 Test Report
-Active-855j-jady
Safety context recordbuilding-scoped2025-08-29
FTF-VT-PER-CO
Violation Issued-Failure To File 2024 Periodic Inspection Report
-Active-855j-jady
Safety context recordbuilding-scoped2025-08-29
FTF-VT-CAT1-CO
Violation Issued-Failure To File 2024 Cat1 Test Report
-Active-855j-jady
Safety context recordbuilding-scoped2025-08-29
FTF-VT-PER-CO
Violation Issued-Failure To File 2024 Periodic Inspection Report
-Active-855j-jady
Safety context recordbuilding-scoped2025-08-29
FTF-VT-CAT1-CO
Violation Issued-Failure To File 2024 Cat1 Test Report
-Active-855j-jady
Safety context recordbuilding-scoped2025-08-29
FTF-VT-CAT1-CO
Violation Issued-Failure To File 2024 Cat1 Test Report
-Active-855j-jady
Safety context recordbuilding-scoped2025-08-29
FTF-VT-CAT1-CO
Violation Issued-Failure To File 2024 Cat1 Test Report
-Active-855j-jady
Safety context recordbuilding-scoped2025-08-29
FTF-VT-PER-CO
Violation Issued-Failure To File 2024 Periodic Inspection Report
-Active-855j-jady
Safety context recordbuilding-scoped2025-08-29
FTF-VT-CAT1-CO
Violation Issued-Failure To File 2024 Cat1 Test Report
-Active-855j-jady
Safety context recordbuilding-scoped2025-08-29
FTF-VT-PER-CO
Violation Issued-Failure To File 2024 Periodic Inspection Report
-Active-855j-jady
Safety context recordbuilding-scoped2025-08-29
FTF-VT-PER-CO
Violation Issued-Failure To File 2024 Periodic Inspection Report
-Active-855j-jady
Safety context recordbuilding-scoped2025-08-29
FTF-VT-CAT1-CO
Violation Issued-Failure To File 2024 Cat1 Test Report
-Active-855j-jady
Safety context recordbuilding-scoped2025-08-29
FTF-VT-CAT1-CO
Violation Issued-Failure To File 2024 Cat1 Test Report
-Active-855j-jady
Safety context recordbuilding-scoped2025-08-29
FTF-VT-CAT1-CO
Violation Issued-Failure To File 2024 Cat1 Test Report
-Active-855j-jady
Safety context recordbuilding-scoped2025-08-29
FTF-VT-CAT1-CO
Violation Issued-Failure To File 2024 Cat1 Test Report
-Active-855j-jady
Safety context recordbuilding-scoped2025-08-29
FTF-VT-PER-CO
Violation Issued-Failure To File 2024 Periodic Inspection Report
-Active-855j-jady
Safety context recordbuilding-scoped2025-08-29
FTF-VT-CAT1-CO
Violation Issued-Failure To File 2024 Cat1 Test Report
-Active-855j-jady
Safety context recordbuilding-scoped2025-08-29
FTF-VT-PER-CO
Violation Issued-Failure To File 2024 Periodic Inspection Report
-Active-855j-jady
Safety context recordbuilding-scoped2025-08-29
FTF-VT-PER-CO
Violation Issued-Failure To File 2024 Periodic Inspection Report
-Active-855j-jady
Safety context recordbuilding-scoped2025-08-29
FTF-VT-CAT1-CO
Violation Issued-Failure To File 2024 Cat1 Test Report
-Active-855j-jady
Safety context recordbuilding-scoped2025-08-29
FTF-VT-CAT1-CO
Violation Issued-Failure To File 2024 Cat1 Test Report
-Active-855j-jady
ECB summons issuedbuilding-scoped2025-05-02
Elevators
28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLAINT MANNER:SERVICE EQUIPMEN
ECB #39146941R
CLASS - 2ACTIVE$6556bgk-3dad
ECB summons issuedbuilding-scoped2025-02-03
Construction
28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER
ECB #39137220M
CLASS - 3ACTIVE$5006bgk-3dad
ECB summons issuedbuilding-scoped2025-01-08
Construction
AC 28-204.4 FAIL TO COMPLY W/COMMISSIONER ORDER TO FILE CERT OF CORRECTION W/DOB
ECB #37032513M
CLASS - 2RESOLVE$1,2506bgk-3dad
DOB violation filedbuilding-scoped2024-12-11
AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9
Safety context recordbuilding-scoped2024-12-11
FTC-AEU-HAZ
-Active-855j-jady
Safety context recordbuilding-scoped2024-12-11
FTC-AEU-HAZ
-Active-855j-jady
DOB violation filedbuilding-scoped2024-12-11
AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9
Safety context recordbuilding-scoped2024-12-11
FTC-AEU-HAZ
-Active-855j-jady
DOB violation filedbuilding-scoped2024-12-11
AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9
Safety context recordbuilding-scoped2024-11-26
FTC-AEU-HAZ
-Active-855j-jady
DOB violation filedbuilding-scoped2024-11-26
AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9
Safety context recordbuilding-scoped2024-11-13
FTC-AEU-HAZ
-Active-855j-jady
DOB violation filedbuilding-scoped2024-11-13
AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9
Safety context recordbuilding-scoped2024-10-16
FTC-AEU-HAZ
-Active-855j-jady
DOB violation filedbuilding-scoped2024-10-16
AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9
Safety context recordbuilding-scoped2024-10-11
FTC-VT-CAT1-CO
Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction
-Active-855j-jady
Safety context recordbuilding-scoped2024-10-11
FTC-VT-CAT1-CO
Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction
-Active-855j-jady
Safety context recordbuilding-scoped2024-10-11
FTC-VT-CAT1-CO
Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction
-Active-855j-jady
Safety context recordbuilding-scoped2024-10-11
FTC-VT-CAT1-CO
Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction
-Active-855j-jady
Safety context recordbuilding-scoped2024-10-11
FTC-VT-CAT1-CO
Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction
-Active-855j-jady
Safety context recordbuilding-scoped2024-10-11
FTC-VT-CAT1-CO
Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction
-Active-855j-jady
Safety context recordbuilding-scoped2024-10-11
FTC-VT-CAT1-CO
Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction
-Active-855j-jady
Safety context recordbuilding-scoped2024-10-11
FTC-VT-CAT1-CO
Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction
-Active-855j-jady
Safety context recordbuilding-scoped2024-10-11
FTC-VT-CAT1-CO
Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction
-Active-855j-jady
Safety context recordbuilding-scoped2024-10-11
FTC-VT-CAT1-CO
Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction
-Active-855j-jady
Safety context recordbuilding-scoped2024-09-23
HBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL HGH PRESSURE INSPECTION
-Active-855j-jady
DOB violation filedbuilding-scoped2024-09-23
HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2023 INTERNAL HGH PRESSURE INSPECTION
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9
DOB violation filedbuilding-scoped2024-09-23
HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL HGH PRESSURE INSPECTION
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9
Safety context recordbuilding-scoped2024-09-23
HBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2023 INTERNAL HGH PRESSURE INSPECTION
-Active-855j-jady
Safety context recordbuilding-scoped2024-09-18
FTC-AEU-HAZ
-Active-855j-jady
Safety context recordbuilding-scoped2024-09-18
FTC-AEU-HAZ
-Active-855j-jady
DOB violation filedbuilding-scoped2024-09-18
AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9
DOB violation filedbuilding-scoped2024-09-18
AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9
ECB summons issuedbuilding-scoped2024-08-05
Elevators
28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLAINT MANNER:SERVICE EQUIPMEN
ECB #39120883M
CLASS - 2ACTIVE$3,1256bgk-3dad
ECB summons issuedbuilding-scoped2024-07-23
Boilers
28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: SERVICE EQUIPME
ECB #39119665X
CLASS - 2ACTIVE$3,1256bgk-3dad
ECB summons issuedbuilding-scoped2024-07-17
Elevators
28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER: SERVICE EQUIPME
ECB #39119323X
CLASS - 1ACTIVE$6,2506bgk-3dad
ECB summons issuedbuilding-scoped2024-07-17
Elevators
28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER: SERVICE EQUIPME
ECB #39119322Y
CLASS - 1ACTIVE$6,2506bgk-3dad
ECB summons issuedbuilding-scoped2024-07-17
Elevators
28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER: SERVICE EQUIPME
ECB #39119320K
CLASS - 1ACTIVE$6,2506bgk-3dad
ECB summons issuedbuilding-scoped2024-07-17
Elevators
28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER: SERVICE EQUIPME
ECB #39119321M
CLASS - 1ACTIVE$6,2506bgk-3dad
ECB summons issuedbuilding-scoped2024-07-11
Elevators
28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER: SERVICE EQUIPME
ECB #39118961X
CLASS - 1ACTIVE$6,2506bgk-3dad
ECB summons issuedbuilding-scoped2024-07-11
Elevators
28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER: SERVICE EQUIPME
ECB #39118960Y
CLASS - 1ACTIVE$6,2506bgk-3dad
ECB summons issuedbuilding-scoped2024-07-11
Elevators
28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER: SERVICE EQUIPME
ECB #39118963J
CLASS - 1ACTIVE$6,2506bgk-3dad
ECB summons issuedbuilding-scoped2024-07-11
Elevators
28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER: SERVICE EQUIPME
ECB #39118962H
CLASS - 1ACTIVE$6,2506bgk-3dad
Safety context recordbuilding-scoped2024-06-23
FTF-EN-EARCX
-Active-855j-jady
DOB violation filedbuilding-scoped2024-06-23
EARCX-FAILURE TO SUBMIT EER NONE
FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2023)
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9
ECB summons issuedbuilding-scoped2024-05-15
Construction
AC 28-204.4 FAIL TO COMPLY W/COMMISSIONER ORDER TO FILE CERT OF CORRECTION W/DOB
ECB #37028495X
CLASS - 2RESOLVE$3,1256bgk-3dad
ECB summons issuedbuilding-scoped2024-05-15
Construction
AC 28-204.4 FAIL TO COMPLY W/COMMISSIONER ORDER TO FILE CERT OF CORRECTION W/DOB
ECB #37028492K
CLASS - 2RESOLVE$3,1256bgk-3dad
ECB summons issuedbuilding-scoped2024-05-15
Construction
AC 28-204.4 FAIL TO COMPLY W/COMMISSIONER ORDER TO FILE CERT OF CORRECTION W/DOB
ECB #37028491Z
CLASS - 2RESOLVE$3,1256bgk-3dad
ECB summons issuedbuilding-scoped2024-05-15
Construction
AC 28-204.4 FAIL TO COMPLY W/COMMISSIONER ORDER TO FILE CERT OF CORRECTION W/DOB
ECB #37028488H
CLASS - 2RESOLVE$3,1256bgk-3dad
ECB summons issuedbuilding-scoped2024-05-15
Construction
AC 28-204.4 FAIL TO COMPLY W/COMMISSIONER ORDER TO FILE CERT OF CORRECTION W/DOB
ECB #37028489J
CLASS - 2RESOLVE$3,1256bgk-3dad
ECB summons issuedbuilding-scoped2024-05-15
Construction
AC 28-204.4 FAIL TO COMPLY W/COMMISSIONER ORDER TO FILE CERT OF CORRECTION W/DOB
ECB #37028490R
CLASS - 2RESOLVE$3,1256bgk-3dad
ECB summons issuedbuilding-scoped2024-05-15
Construction
AC 28-204.4 FAIL TO COMPLY W/COMMISSIONER ORDER TO FILE CERT OF CORRECTION W/DOB
ECB #37028493M
CLASS - 2RESOLVE$3,1256bgk-3dad
ECB summons issuedbuilding-scoped2024-05-15
Construction
AC 28-204.4 FAIL TO COMPLY W/COMMISSIONER ORDER TO FILE CERT OF CORRECTION W/DOB
ECB #37028494Y
CLASS - 2RESOLVE$3,1256bgk-3dad
ECB summons issuedbuilding-scoped2024-01-25
Boilers
28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: SERVICE EQUIPME
ECB #39104340X
CLASS - 2ACTIVE$3,1256bgk-3dad
ECB summons issuedbuilding-scoped2024-01-25
Boilers
28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: SERVICE EQUIPME
ECB #39104338R
CLASS - 2ACTIVE$3,1256bgk-3dad
ECB summons issuedbuilding-scoped2024-01-25
Boilers
28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: SERVICE EQUIPME
ECB #39104337P
CLASS - 2ACTIVE$3,1256bgk-3dad
ECB summons issuedbuilding-scoped2024-01-25
Boilers
28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: SERVICE EQUIPME
ECB #39104339Z
CLASS - 2ACTIVE$3,1256bgk-3dad

Records are the union of DOB Violations (3h2n-5cm9), ECB (6bgk-3dad), Safety Violations (855j-jady), OATH Hearings (jz4z-kudi), and OATH Trials (y3hw-z6bm) that we could link back to this BBL via BIN or address parsing. Events not tagged LL97-specific are shown as building-scoped context. See methodology · enforcement linking.

Fields we cannot show here (internal DOB data not yet public)

Processing lifecycle

DOB's internal BEAM system tracks per-building compliance stages, RCE / decarbonization plans, and mitigation credits. Those fields are not yet published as an open dataset. When DOB releases them, this product will show them here without a schema migration. Until then, the following are known gaps for this building:

  • Assessed penalty (vs theoretical)
    Actual penalty DOB assessed against a building, distinct from the theoretical over-cap exposure computed from LL84 emissions.
    Simulated · internal DOB data not yet public
    Best-effort shadow field: ecb_summons_issued
    Public release status: announced_not_yet_released
  • Audit assignment
    Buildings selected by DOB for LL97 filing audit and the audit stage.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Audit outcome
    Result of an LL97 audit (accepted / correction ordered / penalty referred).
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Extension flag
    Whether a per-building filing was accepted under a filing extension (June 30 grace or BEAM extension to August 29).
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Filing received date
    Timestamp DOB received a per-building LL97 compliance filing.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Good-faith effort application
    Whether an owner has applied for a good-faith effort determination and its status.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Mediated resolution application
    Application for the LL97 mediated resolution process and its outcome.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Notice of deficiency status
    Whether a notice of deficiency has been issued for a building and its current stage.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Per-building filing status
    Filing status for each covered BBL/BIN combination (filed / late / non-filed / exempt) as tracked in DOB's BEAM system.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Pre-OATH correspondence
    DOB correspondence with owners before an OATH matter is opened (notice of deficiency, cure letters).
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • RDP attestation
    Registered Design Professional attestation attached to each per-building compliance filing.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • RECs / offsets claimed
    Renewable Energy Credits and beneficial-use offsets claimed to reduce reported emissions.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • 60-day cure window
    The 60-day cure window state for a building under LL97 enforcement (open / cured / expired).
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
Every number on this page traces back to a Socrata dataset row or a CBL PDF revision. Where DOB does not publish a computable field (pathway, internal BEAM stage, compliance decision), we say so on the record instead of hiding the gap. See methodology.