175 NAGLE AVENUE
CP4_city_portfolioCBL revision date 2026-06-16Open CBL source PDFArticle 320 · numerical caps & computed exposure
How this is computed| Period | Occupancy | GFA | Cap | Actual | Delta | Est. penalty | Status | Methodology |
|---|---|---|---|---|---|---|---|---|
| 2024-29 | R-2(high) | 1,122,000 sqft | 7,573.5 tCO2e | 9,413.1 tCO2e | +1,839.6 | $493,021 | Over capEJ · PEJA fallback | v1.0 |
| 2030-34 | R-2(high) | 1,122,000 sqft | 4,566.5 tCO2e | 9,413.1 tCO2e | +4,846.6 | $1,298,886 | Over capEJ · PEJA fallback | v1.0 |
Cap = Σ (occupancy_coefficient × gross_floor_area) using DOB LL97 rules; actual GHG is the most recent LL84 filing. Delta is positive when actual exceeds cap. Estimated penalty is DOB's public $268/tCO2e × delta with a 30-day grace applied via penalty_estimate_usd.
LL84 GHG emissions history
Actual tCO2e reported to LL84 by report year. Each bar links to the raw LL84 row identifier under the chart for auditability.
| Year | Property type | GHG | Property GFA | Site EUI | Source EUI | ES score | Source |
|---|---|---|---|---|---|---|---|
| 2022 | Multifamily Housing | 13,940 tCO2e | 1,122,000 sqft | 216.2 | 279.4 | 1 | 5zyy-y8am / 2831015 |
| 2023 | Multifamily Housing | 9,169.4 tCO2e | 1,122,000 sqft | 131.6 | 175.4 | 10 | 5zyy-y8am / 2831015 |
| 2024 | Multifamily Housing | 9,413.1 tCO2e | 1,122,000 sqft | 133.1 | 177.0 | 11 | 5zyy-y8am / 2831015 |
Enforcement events (all DOB + ECB + OATH data cross-linked to this BBL)
Open on enforcement page →| Stage | Event date | Violation | Severity | Status | Penalty | Source |
|---|---|---|---|---|---|---|
| ECB summons issuedbuilding-scoped | 2026-05-09 | Cranes and Derricks BC 3314.1.1 & 27-1050.1 FAILED TO NOTIFY DEPARTMENT/OBTAIN PERMIT PRIOR TO USE/INST. OFF C-HOO ECB #39553934R | CLASS - 2 | ACTIVE | $800 | 6bgk-3dad |
| Safety context recordbuilding-scoped | 2026-01-26 | FTC-FC-UNSAFE unsafe report filed | - | Dismissed | - | 855j-jady |
| Safety context recordbuilding-scoped | 2026-01-26 | FTC-FC-UNSAFE unsafe report filed | - | Waived - Pending Dismissal | - | 855j-jady |
| Safety context recordbuilding-scoped | 2026-01-26 | FTC-FC-UNSAFE unsafe report filed | - | Dismissed | - | 855j-jady |
| Safety context recordbuilding-scoped | 2026-01-26 | FTC-FC-UNSAFE unsafe report filed | - | Dismissed | - | 855j-jady |
| Safety context recordbuilding-scoped | 2026-01-26 | FTC-FC-UNSAFE unsafe report filed | - | Dismissed | - | 855j-jady |
| Safety context recordbuilding-scoped | 2026-01-26 | FTC-FC-UNSAFE unsafe report filed | - | Dismissed | - | 855j-jady |
| Safety context recordbuilding-scoped | 2026-01-26 | FTC-FC-UNSAFE unsafe report filed | - | Dismissed | - | 855j-jady |
| Safety context recordbuilding-scoped | 2025-10-10 | FTC-VT-CAT1-CO Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction | - | Active | - | 855j-jady |
| Safety context recordbuilding-scoped | 2025-10-10 | FTC-VT-PER-CO Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction | - | Active | - | 855j-jady |
| Safety context recordbuilding-scoped | 2025-10-10 | FTC-VT-PER-CO Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction | - | Active | - | 855j-jady |
| Safety context recordbuilding-scoped | 2025-10-10 | FTC-VT-CAT1-CO Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction | - | Active | - | 855j-jady |
| Safety context recordbuilding-scoped | 2025-10-10 | FTC-VT-CAT1-CO Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction | - | Active | - | 855j-jady |
| Safety context recordbuilding-scoped | 2025-10-10 | FTC-VT-CAT1-HA Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction | - | Dismissed | - | 855j-jady |
| Safety context recordbuilding-scoped | 2025-10-10 | FTC-VT-PER-CO Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction | - | Active | - | 855j-jady |
| Safety context recordbuilding-scoped | 2025-10-10 | FTC-VT-PER-CO Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction | - | Active | - | 855j-jady |
| Safety context recordbuilding-scoped | 2025-10-10 | FTC-VT-PER-CO Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction | - | Active | - | 855j-jady |
| Safety context recordbuilding-scoped | 2025-10-10 | FTC-VT-PER-HA Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction | - | Dismissed | - | 855j-jady |
| ECB summons issuedbuilding-scoped | 2025-09-11 | Construction 28-302.1 FAILURE TO MAINTAIN BLDG WALL(S) OR APPURTENANCES ECB #35718555Y | CLASS - 2 | RESOLVE | $2,500 | 6bgk-3dad |
| Safety context recordbuilding-scoped | 2025-08-29 | FTF-VT-PER-CO Violation Issued-Failure To File 2024 Periodic Inspection Report | - | Active | - | 855j-jady |
| Safety context recordbuilding-scoped | 2025-08-29 | FTF-VT-CAT1-CO Violation Issued-Failure To File 2024 Cat1 Test Report | - | Active | - | 855j-jady |
| Safety context recordbuilding-scoped | 2025-08-29 | FTF-VT-PER-CO Violation Issued-Failure To File 2024 Periodic Inspection Report | - | Active | - | 855j-jady |
| Safety context recordbuilding-scoped | 2025-08-29 | FTF-VT-PER-CO Violation Issued-Failure To File 2024 Periodic Inspection Report | - | Active | - | 855j-jady |
| Safety context recordbuilding-scoped | 2025-08-29 | FTF-VT-CAT1-CO Violation Issued-Failure To File 2024 Cat1 Test Report | - | Active | - | 855j-jady |
| Safety context recordbuilding-scoped | 2025-08-29 | FTF-VT-PER-CO Violation Issued-Failure To File 2024 Periodic Inspection Report | - | Active | - | 855j-jady |
| Safety context recordbuilding-scoped | 2025-08-29 | FTF-VT-CAT1-CO Violation Issued-Failure To File 2024 Cat1 Test Report | - | Active | - | 855j-jady |
| Safety context recordbuilding-scoped | 2025-08-29 | FTF-VT-PER-CO Violation Issued-Failure To File 2024 Periodic Inspection Report | - | Active | - | 855j-jady |
| Safety context recordbuilding-scoped | 2025-08-29 | FTF-VT-PER-CO Violation Issued-Failure To File 2024 Periodic Inspection Report | - | Active | - | 855j-jady |
| DOB violation filedbuilding-scoped | 2025-05-13 | C-CONSTRUCTION OTHER OPTIONAL OBSERVED @ EXP CRARK JOINT, SPALLING, AND OPEN JOINTS AT MULTIPLE PLACES UPPER FLOORS. EXP 2 SPALLING AND DAMAGED JOINTS. EXP 3 CRACK JOINTS AT UPPER FLRS AND BROKEN WINDOW PANE @ 2ND FL. EXP 4 CRACKED WI NDOW PANE AT 6TH FL. REPAIR AND OR REPLACE | - | V*-DOB VIOLATION - DISMISSED | - | 3h2n-5cm9 |
| Safety context recordbuilding-scoped | 2024-10-25 | FTC-BE-EXT-LP Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device | - | Active | - | 855j-jady |
| Safety context recordbuilding-scoped | 2024-10-25 | FTC-BE-EXT-LP Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device | - | Active | - | 855j-jady |
| Safety context recordbuilding-scoped | 2024-10-25 | FTC-BE-EXT-LP Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device | - | Active | - | 855j-jady |
| Safety context recordbuilding-scoped | 2024-10-25 | FTC-BE-EXT-LP Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device | - | Active | - | 855j-jady |
| Safety context recordbuilding-scoped | 2024-09-11 | FTF-VT-PER-HA Violation Issued-Failure To File 2023 Periodic Inspection Report | - | Dismissed | - | 855j-jady |
| Safety context recordbuilding-scoped | 2024-09-11 | FTF-VT-PER-HA Violation Issued-Failure To File 2023 Periodic Inspection Report | - | Dismissed | - | 855j-jady |
| DOB violation filedbuilding-scoped | 2024-06-23 | EARCX-FAILURE TO SUBMIT EER NONE FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2023) | - | V*-DOB VIOLATION - DISMISSED | - | 3h2n-5cm9 |
| Safety context recordbuilding-scoped | 2024-06-23 | FTF-EN-EARCX | - | Dismissed | - | 855j-jady |
Records are the union of DOB Violations (3h2n-5cm9), ECB (6bgk-3dad), Safety Violations (855j-jady), OATH Hearings (jz4z-kudi), and OATH Trials (y3hw-z6bm) that we could link back to this BBL via BIN or address parsing. Events not tagged LL97-specific are shown as building-scoped context. See methodology · enforcement linking.
Fields we cannot show here (internal DOB data not yet public)
Processing lifecycleDOB's internal BEAM system tracks per-building compliance stages, RCE / decarbonization plans, and mitigation credits. Those fields are not yet published as an open dataset. When DOB releases them, this product will show them here without a schema migration. Until then, the following are known gaps for this building:
- Simulated · internal DOB data not yet publicAssessed penalty (vs theoretical)Actual penalty DOB assessed against a building, distinct from the theoretical over-cap exposure computed from LL84 emissions.Best-effort shadow field:
ecb_summons_issuedPublic release status: announced_not_yet_released - Simulated · internal DOB data not yet publicAudit assignmentBuildings selected by DOB for LL97 filing audit and the audit stage.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicAudit outcomeResult of an LL97 audit (accepted / correction ordered / penalty referred).Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicExtension flagWhether a per-building filing was accepted under a filing extension (June 30 grace or BEAM extension to August 29).Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicFiling received dateTimestamp DOB received a per-building LL97 compliance filing.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicGood-faith effort applicationWhether an owner has applied for a good-faith effort determination and its status.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicMediated resolution applicationApplication for the LL97 mediated resolution process and its outcome.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicNotice of deficiency statusWhether a notice of deficiency has been issued for a building and its current stage.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicPer-building filing statusFiling status for each covered BBL/BIN combination (filed / late / non-filed / exempt) as tracked in DOB's BEAM system.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicPre-OATH correspondenceDOB correspondence with owners before an OATH matter is opened (notice of deficiency, cure letters).Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicRDP attestationRegistered Design Professional attestation attached to each per-building compliance filing.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicRECs / offsets claimedRenewable Energy Credits and beneficial-use offsets claimed to reduce reported emissions.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet public60-day cure windowThe 60-day cure window state for a building under LL97 enforcement (open / cured / expired).Public release status: announced_not_yet_released