773 CONCOURSE VILLAGE EAST
CP2_article_320_2035CBL revision date 2026-06-16Open CBL source PDFArticle 320 · numerical caps & computed exposure
How this is computed| Period | Occupancy | GFA | Cap | Actual | Delta | Est. penalty | Status | Methodology |
|---|---|---|---|---|---|---|---|---|
| 2024-29 | R-2(high) | 876,498 sqft | 5,916.4 tCO2e | 12,809 tCO2e | +6,892.4 | $1,847,168 | Over capEJ · PEJA fallback | v1.0 |
| 2030-34 | R-2(high) | 876,498 sqft | 3,567.3 tCO2e | 12,809 tCO2e | +9,241.4 | $2,476,704 | Over capEJ · PEJA fallback | v1.0 |
Cap = Σ (occupancy_coefficient × gross_floor_area) using DOB LL97 rules; actual GHG is the most recent LL84 filing. Delta is positive when actual exceeds cap. Estimated penalty is DOB's public $268/tCO2e × delta with a 30-day grace applied via penalty_estimate_usd.
LL84 GHG emissions history
Actual tCO2e reported to LL84 by report year. Each bar links to the raw LL84 row identifier under the chart for auditability.
| Year | Property type | GHG | Property GFA | Site EUI | Source EUI | ES score | Source |
|---|---|---|---|---|---|---|---|
| 2021 | Multifamily Housing | 10,995 tCO2e | 876,498 sqft | 226.9 | 279.9 | 1 | 7x5e-2fxh / 11631929 |
| 2022 | Multifamily Housing | 10,725 tCO2e | 876,498 sqft | 216.5 | 268.3 | 1 | 5zyy-y8am / 11631929 |
| 2023 | Multifamily Housing | 11,229 tCO2e | 876,498 sqft | 217.9 | 267.7 | 1 | 5zyy-y8am / 11631929 |
| 2024 | Multifamily Housing | 12,809 tCO2e | 876,498 sqft | 249.0 | 300.6 | 1 | 5zyy-y8am / 11631929 |
Enforcement events (all DOB + ECB + OATH data cross-linked to this BBL)
Open on enforcement page →| Stage | Event date | Violation | Severity | Status | Penalty | Source |
|---|---|---|---|---|---|---|
| Safety context recordbuilding-scoped | 2026-03-17 | FTC-AEU-HAZ | - | Active | - | 855j-jady |
| Safety context recordbuilding-scoped | 2026-03-17 | FTC-AEU-HAZ | - | Active | - | 855j-jady |
| ECB summons issuedbuilding-scoped | 2026-02-10 | Boilers 28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: SERVICE EQUIPME ECB #39176681R | CLASS - 2 | ACTIVE | $1,280 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2026-02-10 | Boilers 28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: SERVICE EQUIPME ECB #39176680P | CLASS - 2 | ACTIVE | $1,280 | 6bgk-3dad |
| Safety context recordbuilding-scoped | 2025-12-15 | FTC-BE-EXT-LP Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device | - | Active | - | 855j-jady |
| Safety context recordbuilding-scoped | 2025-12-15 | FTC-BE-EXT-LP Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device | - | Active | - | 855j-jady |
| Safety context recordbuilding-scoped | 2025-12-15 | FTC-BE-EXT-LP Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device | - | Active | - | 855j-jady |
| Safety context recordbuilding-scoped | 2025-10-31 | FTF-PL-PER Cycle 1, Sub-cycle C (premises is in Community District 4) | - | Active | - | 855j-jady |
| Safety context recordbuilding-scoped | 2025-10-31 | FTF-PL-PER Cycle 1, Sub-cycle C (premises is in Community District 4) | - | Active | - | 855j-jady |
| Safety context recordbuilding-scoped | 2025-10-31 | FTF-PL-PER Cycle 1, Sub-cycle C (premises is in Community District 4) | - | Active | - | 855j-jady |
| Safety context recordbuilding-scoped | 2025-10-31 | FTF-PL-PER Cycle 1, Sub-cycle C (premises is in Community District 4) | - | Active | - | 855j-jady |
| DOB violation filedbuilding-scoped | 2025-07-29 | C-CONSTRUCTION OTHER OPTIONAL A PRECAST PLANK UNDERSIDE FELL AT LOT 170; OTHERS MAY FAIL; STRUCTURAL INTEGRITY IS COMPROMISED REMEDY: BLDG OWNER TO RETAIN A NYS PE TO PERFORM HANDS ON INSPECTION OF PRECAST PLANKS AND SUBMIT S/S ENGR'S REPORT BY 8/28/25 | - | V*-DOB VIOLATION - DISMISSED | - | 3h2n-5cm9 |
| DOB violation filedbuilding-scoped | 2025-07-16 | C-CONSTRUCTION OTHER OPTIONAL VACATE 125'X120' AREA BTW 777 & 779 CVE EXCEPT EGRESS PATHWAYS 290'X90 'BTW 775 & 777 CVE.DUE TO SUBSTANTIAL SPALLING OF PRE CAST CONCRETE EL EMNTS POSIIBLE STABILITY ISSUES.VACATE APPROX 125'X120'AREA BETWEEN 77 7 & 779 CVE WITH EXCEPTION OF 10'.0"WIDE EGRESS PATHWAY ALONG THE SOUT H ELEV OF 779 CVE.ALSO 290'X90' AREA OF THE PLAZA BW 775 & 777 CVE | - | V-DOB VIOLATION - ACTIVE | - | 3h2n-5cm9 |
| ECB summons issuedbuilding-scoped | 2025-07-15 | Unknown ECB #35718217L | CLASS - 1 | ACTIVE | $25,000 | 6bgk-3dad |
| DOB violation filedbuilding-scoped | 2025-07-15 | C-CONSTRUCTION OTHER OPTIONAL PARTIAL VACATE ORDER.ENTIRE PARKING GARAGE AT CELLAR LEVEL.THE PARKING GARAGE EXHIBITS SUBSTANTIAL DETERIORATING MATERIALS,MULTIPLE LARGE SEC TIONS OF REMOVED PLANKS AND CONCRETE SLABS WITH SIGNIFICANT SECTION OF SPALLED CONCRETE RUSTED REINFORCEMENTS,CRACKED AND SPALLING CONCRETE C OLUMNS.CONCERE IN DANGER OF FALLING.REMEDY:VACATE ENTIRE PARKING GARAG | - | V-DOB VIOLATION - ACTIVE | - | 3h2n-5cm9 |
| ECB summons issuedbuilding-scoped | 2025-07-15 | Unknown ECB #35718218N | CLASS - 1 | ACTIVE | $12,500 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2025-03-31 | Boilers 28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: SERVICE EQUIPME ECB #39143298N | CLASS - 2 | ACTIVE | $6,250 | 6bgk-3dad |
| Safety context recordbuilding-scoped | 2025-03-05 | FTC-PS-UNSAFE Unsafe report of parking structures filed | - | Active | - | 855j-jady |
| ECB summons issuedbuilding-scoped | 2025-02-11 | Construction AC 28-204.4 FAIL TO COMPLY W/COMMISSIONER ORDER TO FILE CERT OF CORRECTION W/DOB ECB #37033131L | CLASS - 2 | RESOLVE | $3,125 | 6bgk-3dad |
| Safety context recordbuilding-scoped | 2024-10-11 | FTC-VT-CAT1-CO Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction | - | Active | - | 855j-jady |
| Safety context recordbuilding-scoped | 2024-10-11 | FTC-VT-CAT1-CO Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction | - | Active | - | 855j-jady |
| Safety context recordbuilding-scoped | 2024-10-11 | FTC-VT-CAT1-CO Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction | - | Dismissed | - | 855j-jady |
| Safety context recordbuilding-scoped | 2024-10-11 | FTC-VT-CAT1-CO Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction | - | Active | - | 855j-jady |
| Safety context recordbuilding-scoped | 2024-10-11 | FTC-VT-CAT1-CO Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction | - | Active | - | 855j-jady |
| Safety context recordbuilding-scoped | 2024-09-23 | LBLVIO Violation Issued-Failure To File 2023 External Low Pressure Inspection Report | - | Active | - | 855j-jady |
| DOB violation filedbuilding-scoped | 2024-09-23 | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION | - | V-DOB VIOLATION - ACTIVE | - | 3h2n-5cm9 |
| DOB violation filedbuilding-scoped | 2024-09-23 | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION | - | V-DOB VIOLATION - ACTIVE | - | 3h2n-5cm9 |
| DOB violation filedbuilding-scoped | 2024-09-23 | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION | - | V-DOB VIOLATION - ACTIVE | - | 3h2n-5cm9 |
| DOB violation filedbuilding-scoped | 2024-09-23 | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION | - | V-DOB VIOLATION - ACTIVE | - | 3h2n-5cm9 |
| DOB violation filedbuilding-scoped | 2024-09-23 | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION | - | V-DOB VIOLATION - ACTIVE | - | 3h2n-5cm9 |
| DOB violation filedbuilding-scoped | 2024-09-23 | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION | - | V-DOB VIOLATION - ACTIVE | - | 3h2n-5cm9 |
| Safety context recordbuilding-scoped | 2024-09-23 | LBLVIO Violation Issued-Failure To File 2023 External Low Pressure Inspection Report | - | Active | - | 855j-jady |
| Safety context recordbuilding-scoped | 2024-09-23 | LBLVIO Violation Issued-Failure To File 2023 External Low Pressure Inspection Report | - | Active | - | 855j-jady |
| Safety context recordbuilding-scoped | 2024-09-23 | LBLVIO Violation Issued-Failure To File 2023 External Low Pressure Inspection Report | - | Active | - | 855j-jady |
| Safety context recordbuilding-scoped | 2024-09-23 | LBLVIO Violation Issued-Failure To File 2023 External Low Pressure Inspection Report | - | Active | - | 855j-jady |
| Safety context recordbuilding-scoped | 2024-09-23 | LBLVIO Violation Issued-Failure To File 2023 External Low Pressure Inspection Report | - | Active | - | 855j-jady |
| DOB violation filedbuilding-scoped | 2024-08-20 | C-CONSTRUCTION OTHER OPTIONAL EMERGENCY WORK ORDER:AN ACTIVE PARKING STRUCTURE CONSISTING 2 LEVELS ROOFTOP&BASEMENT WITH VEHICLES OCCUPIED. UNSAFE NOTICATION #UNPS-X0038 09-1C-001 DATED 7/29/24. SAFETY NOT INSTALLED IN PLACE DEMOLISHING OF CONCRETE SLAB.REMEDY: OWNER TO RETAIN NYS REGISTERED DESIGN PROF TO EVALUATE, SUPERV DIRECT ALL WORK TO PARKINGSTRUCTURES@BUILDINGS.NYC.GO | - | V-DOB VIOLATION - ACTIVE | - | 3h2n-5cm9 |
| ECB summons issuedbuilding-scoped | 2024-04-23 | Construction 28-201.1 UNLAWFUL ACTS. FAILURE TO COMPLY WITH AN ORDER OF THE COMMISSIONER ECB #35681826K | CLASS - 1 | RESOLVE | $0 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2024-04-23 | Construction 28-201.1 UNLAWFUL ACTS. FAILURE TO COMPLY WITH AN ORDER OF THE COMMISSIONER ECB #35681825Z | CLASS - 1 | RESOLVE | $0 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2024-04-16 | Construction 28-302.1 FAILURE TO MAINTAIN BLDG WALL(S) OR APPURTENANCES ECB #35682291H | CLASS - 2 | ACTIVE | $1,250 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2024-04-16 | Construction 28-201.1 UNLAWFUL ACTS. FAILURE TO COMPLY WITH AN ORDER OF THE COMMISSIONER ECB #35682290X | CLASS - 1 | RESOLVE | $0 | 6bgk-3dad |
Records are the union of DOB Violations (3h2n-5cm9), ECB (6bgk-3dad), Safety Violations (855j-jady), OATH Hearings (jz4z-kudi), and OATH Trials (y3hw-z6bm) that we could link back to this BBL via BIN or address parsing. Events not tagged LL97-specific are shown as building-scoped context. See methodology · enforcement linking.
Fields we cannot show here (internal DOB data not yet public)
Processing lifecycleDOB's internal BEAM system tracks per-building compliance stages, RCE / decarbonization plans, and mitigation credits. Those fields are not yet published as an open dataset. When DOB releases them, this product will show them here without a schema migration. Until then, the following are known gaps for this building:
- Simulated · internal DOB data not yet publicAssessed penalty (vs theoretical)Actual penalty DOB assessed against a building, distinct from the theoretical over-cap exposure computed from LL84 emissions.Best-effort shadow field:
ecb_summons_issuedPublic release status: announced_not_yet_released - Simulated · internal DOB data not yet publicAudit assignmentBuildings selected by DOB for LL97 filing audit and the audit stage.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicAudit outcomeResult of an LL97 audit (accepted / correction ordered / penalty referred).Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicExtension flagWhether a per-building filing was accepted under a filing extension (June 30 grace or BEAM extension to August 29).Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicFiling received dateTimestamp DOB received a per-building LL97 compliance filing.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicGood-faith effort applicationWhether an owner has applied for a good-faith effort determination and its status.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicMediated resolution applicationApplication for the LL97 mediated resolution process and its outcome.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicNotice of deficiency statusWhether a notice of deficiency has been issued for a building and its current stage.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicPer-building filing statusFiling status for each covered BBL/BIN combination (filed / late / non-filed / exempt) as tracked in DOB's BEAM system.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicPre-OATH correspondenceDOB correspondence with owners before an OATH matter is opened (notice of deficiency, cure letters).Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicRDP attestationRegistered Design Professional attestation attached to each per-building compliance filing.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicRECs / offsets claimedRenewable Energy Credits and beneficial-use offsets claimed to reduce reported emissions.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet public60-day cure windowThe 60-day cure window state for a building under LL97 enforcement (open / cured / expired).Public release status: announced_not_yet_released