1050 CARROLL PLACE
CP0_article_320_2024CBL revision date 2026-06-16Open CBL source PDFArticle 320 · numerical caps & computed exposure
How this is computed| Period | Occupancy | GFA | Cap | Actual | Delta | Est. penalty | Status | Methodology |
|---|---|---|---|---|---|---|---|---|
| 2024-29 | R-2(high) | 74,594 sqft | 503.5 tCO2e | 831.9 tCO2e | +328.4 | $88,001 | Over capEJ · PEJA fallback | v1.0 |
| 2030-34 | R-2(high) | 74,594 sqft | 303.6 tCO2e | 831.9 tCO2e | +528.3 | $141,577 | Over capEJ · PEJA fallback | v1.0 |
Cap = Σ (occupancy_coefficient × gross_floor_area) using DOB LL97 rules; actual GHG is the most recent LL84 filing. Delta is positive when actual exceeds cap. Estimated penalty is DOB's public $268/tCO2e × delta with a 30-day grace applied via penalty_estimate_usd.
LL84 GHG emissions history
Actual tCO2e reported to LL84 by report year. Each bar links to the raw LL84 row identifier under the chart for auditability.
| Year | Property type | GHG | Property GFA | Site EUI | Source EUI | ES score | Source |
|---|---|---|---|---|---|---|---|
| 2021 | Multifamily Housing | 876.3 tCO2e | 82,053 sqft | 193.2 | 238.3 | 1 | 7x5e-2fxh / 3096462 |
| 2022 | Multifamily Housing | 834.5 tCO2e | 82,053 sqft | 181.1 | 220.8 | 1 | 5zyy-y8am / 3096462 |
| 2023 | Multifamily Housing | 793.9 tCO2e | 74,594 sqft | 180.3 | 222.9 | 1 | 5zyy-y8am / 26595545 |
| 2024 | Multifamily Housing | 831.9 tCO2e | 74,594 sqft | 186.9 | 230.8 | 1 | 5zyy-y8am / 48379498 |
Enforcement events (all DOB + ECB + OATH data cross-linked to this BBL)
Open on enforcement page →| Stage | Event date | Violation | Severity | Status | Penalty | Source |
|---|---|---|---|---|---|---|
| ECB summons issuedbuilding-scoped | 2026-05-06 | Construction 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER ECB #39187520J | CLASS - 1 | ACTIVE | $6,250 | 6bgk-3dad |
| Safety context recordbuilding-scoped | 2026-03-17 | FTC-AEU-HAZ | - | Active | - | 855j-jady |
| Safety context recordbuilding-scoped | 2026-03-17 | FTC-AEU-HAZ | - | Active | - | 855j-jady |
| Safety context recordbuilding-scoped | 2026-03-17 | FTC-AEU-HAZ | - | Active | - | 855j-jady |
| DOB violation filedbuilding-scoped | 2025-11-14 | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | - | V-DOB VIOLATION - ACTIVE | - | 3h2n-5cm9 |
| Safety context recordbuilding-scoped | 2025-11-14 | LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | - | Active | - | 855j-jady |
| Safety context recordbuilding-scoped | 2025-10-31 | FTF-PL-PER Cycle 1, Sub-cycle C (premises is in Community District 4) | - | Active | - | 855j-jady |
| Safety context recordbuilding-scoped | 2025-10-10 | FTC-VT-PER-CO Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction | - | Active | - | 855j-jady |
| Safety context recordbuilding-scoped | 2025-10-10 | FTC-VT-CAT1-CO Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction | - | Active | - | 855j-jady |
| ECB summons issuedbuilding-scoped | 2025-08-28 | Construction BC 3307.6,27-1021 SIDEWALK SHED DOES NOT MEET CODE SPECIFICATIONS ECB #39544194X | CLASS - 2 | ACTIVE | $10,000 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2025-08-28 | Construction BC 3301.9,27-10009(C) FAIL TO PROVIDE/POST SIGN(S) AT JB SITE PURSUANT TO SUBSEC ECB #39544193Y | CLASS - 2 | ACTIVE | $6,250 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2025-07-08 | Construction 27-369,BC 1020.2 FAIL TO PROVIDE UNOBSTRUCTED EXIT PASSAGEWAY ECB #35694073H | CLASS - 1 | RESOLVE | $1,250 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2025-07-08 | Construction 28-302.1 FAILURE TO MAINTAIN BLDG WALL(S) OR APPURTENANCES ECB #35694072X | CLASS - 1 | ACTIVE | $5,000 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2025-06-26 | Construction 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER ECB #39152145R | CLASS - 1 | ACTIVE | $12,500 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2025-02-07 | Construction 28-302.1 FAILURE TO MAINTAIN BLDG WALL(S) OR APPURTENANCES ECB #35689857J | CLASS - 1 | ACTIVE | $5,000 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2025-02-07 | Construction 27-369,BC 1020.2 FAIL TO PROVIDE UNOBSTRUCTED EXIT PASSAGEWAY ECB #35689858L | CLASS - 1 | RESOLVE | $1,250 | 6bgk-3dad |
| Safety context recordbuilding-scoped | 2024-10-16 | FTC-AEU-HAZ | - | Active | - | 855j-jady |
| DOB violation filedbuilding-scoped | 2024-10-16 | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION | - | V-DOB VIOLATION - ACTIVE | - | 3h2n-5cm9 |
| Safety context recordbuilding-scoped | 2024-10-11 | FTC-VT-PER-CO Violation Issued-Failure To File 2023 Periodic Inspection Affirmation of Correction | - | Active | - | 855j-jady |
| Safety context recordbuilding-scoped | 2024-10-11 | FTC-VT-CAT1-CO Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction | - | Active | - | 855j-jady |
| ECB summons issuedbuilding-scoped | 2024-08-06 | Construction 28-207.4 FAILURE TO OBEY A VACATE ORDER ECB #35684078H | CLASS - 1 | ACTIVE | $4,800 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2024-08-06 | Construction 28-302.1 FAILURE TO MAINTAIN BLDG WALL(S) OR APPURTENANCES ECB #35684080R | CLASS - 2 | ACTIVE | $1,250 | 6bgk-3dad |
| Safety context recordbuilding-scoped | 2024-06-26 | FTC-AEU-HAZ | - | Active | - | 855j-jady |
| DOB violation filedbuilding-scoped | 2024-06-26 | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION | - | V-DOB VIOLATION - ACTIVE | - | 3h2n-5cm9 |
| ECB summons issuedbuilding-scoped | 2024-04-16 | Construction 28-302.1 FAILURE TO MAINTAIN BLDG WALL(S) OR APPURTENANCES ECB #35681687J | CLASS - 1 | ACTIVE | $2,500 | 6bgk-3dad |
| DOB violation filedbuilding-scoped | 2024-04-16 | C-CONSTRUCTION OTHER OPTIONAL EMERGENCY WORK ORDER 4/16/24 DUE TO DEFECTIVE FACADE - AT EXPO#1 WEST ELEV.SPALLING AND SEVERLY CRACKED WINDOW SILLS(MASONRY)THROUGOUT FACADE(2)LOOSE MORTAR@ ROOF LEVELOF EXPO#1(COURT(WEST ELEV)(3)CRACKED SPALLING MASONRY SILLS@EXPO#4(SO.ELE)REMEDY:IMMED.TAKE SAFETY MEASURES TO PROTECT PUBLIC&INSTALL SIDEWALK SHED@EXPO#1(W.ELEV.)&EXP#4(SO.ELEV) | - | V-DOB VIOLATION - ACTIVE | - | 3h2n-5cm9 |
| ECB summons issuedbuilding-scoped | 2024-04-16 | Construction 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER ECB #35681686H | CLASS - 1 | RESOLVE | $312 | 6bgk-3dad |
Records are the union of DOB Violations (3h2n-5cm9), ECB (6bgk-3dad), Safety Violations (855j-jady), OATH Hearings (jz4z-kudi), and OATH Trials (y3hw-z6bm) that we could link back to this BBL via BIN or address parsing. Events not tagged LL97-specific are shown as building-scoped context. See methodology · enforcement linking.
Data quality flags
- default_value_reportedSee methodology for the exact definition of this flag; behavior may vary by pathway or period.
Full flag catalog: methodology · data quality flags
Fields we cannot show here (internal DOB data not yet public)
Processing lifecycleDOB's internal BEAM system tracks per-building compliance stages, RCE / decarbonization plans, and mitigation credits. Those fields are not yet published as an open dataset. When DOB releases them, this product will show them here without a schema migration. Until then, the following are known gaps for this building:
- Simulated · internal DOB data not yet publicAssessed penalty (vs theoretical)Actual penalty DOB assessed against a building, distinct from the theoretical over-cap exposure computed from LL84 emissions.Best-effort shadow field:
ecb_summons_issuedPublic release status: announced_not_yet_released - Simulated · internal DOB data not yet publicAudit assignmentBuildings selected by DOB for LL97 filing audit and the audit stage.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicAudit outcomeResult of an LL97 audit (accepted / correction ordered / penalty referred).Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicExtension flagWhether a per-building filing was accepted under a filing extension (June 30 grace or BEAM extension to August 29).Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicFiling received dateTimestamp DOB received a per-building LL97 compliance filing.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicGood-faith effort applicationWhether an owner has applied for a good-faith effort determination and its status.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicMediated resolution applicationApplication for the LL97 mediated resolution process and its outcome.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicNotice of deficiency statusWhether a notice of deficiency has been issued for a building and its current stage.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicPer-building filing statusFiling status for each covered BBL/BIN combination (filed / late / non-filed / exempt) as tracked in DOB's BEAM system.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicPre-OATH correspondenceDOB correspondence with owners before an OATH matter is opened (notice of deficiency, cure letters).Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicRDP attestationRegistered Design Professional attestation attached to each per-building compliance filing.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicRECs / offsets claimedRenewable Energy Credits and beneficial-use offsets claimed to reduce reported emissions.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet public60-day cure windowThe 60-day cure window state for a building under LL97 enforcement (open / cured / expired).Public release status: announced_not_yet_released