1551 EAST 172ND STREET
CP4_city_portfolioCBL revision date 2026-06-16Open CBL source PDFArticle 320 · numerical caps & computed exposure
How this is computed| Period | Occupancy | GFA | Cap | Actual | Delta | Est. penalty | Status | Methodology |
|---|---|---|---|---|---|---|---|---|
| 2024-29 | E(high) | 121,200 sqft | 918.7 tCO2e | 1,308.1 tCO2e | +389.4 | $104,368 | Over capEJ · PEJA fallback | v1.0 |
| 2030-34 | E(high) | 121,200 sqft | 416.9 tCO2e | 1,308.1 tCO2e | +891.2 | $238,842 | Over capEJ · PEJA fallback | v1.0 |
Cap = Σ (occupancy_coefficient × gross_floor_area) using DOB LL97 rules; actual GHG is the most recent LL84 filing. Delta is positive when actual exceeds cap. Estimated penalty is DOB's public $268/tCO2e × delta with a 30-day grace applied via penalty_estimate_usd.
LL84 GHG emissions history
Actual tCO2e reported to LL84 by report year. Each bar links to the raw LL84 row identifier under the chart for auditability.
| Year | Property type | GHG | Property GFA | Site EUI | Source EUI | ES score | Source |
|---|---|---|---|---|---|---|---|
| 2021 | K-12 School | 1,098 tCO2e | 121,200 sqft | 138.3 | 290.3 | 4 | 7x5e-2fxh / 6935980 |
| 2022 | K-12 School | 1,113.2 tCO2e | 121,200 sqft | 123.6 | 275.7 | 5 | 5zyy-y8am / 6935980 |
| 2023 | K-12 School | 1,185.6 tCO2e | 121,200 sqft | 109.5 | 239.8 | 8 | 5zyy-y8am / 6935980 |
| 2024 | K-12 School | 1,308.1 tCO2e | 121,200 sqft | 119.6 | 251.0 | 8 | 5zyy-y8am / 6935980 |
Enforcement events (all DOB + ECB + OATH data cross-linked to this BBL)
Open on enforcement page →| Stage | Event date | Violation | Severity | Status | Penalty | Source |
|---|---|---|---|---|---|---|
| ECB summons issuedbuilding-scoped | 2026-05-11 | Construction 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER ECB #35733076M | CLASS - 2 | ACTIVE | $3,125 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2026-05-11 | Construction 28-302.1 FAILURE TO MAINTAIN BLDG WALL(S) OR APPURTENANCES ECB #35733075K | CLASS - 2 | ACTIVE | $6,250 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2026-05-11 | Construction 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER ECB #35733079H | CLASS - 2 | ACTIVE | $1,250 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2026-05-11 | Construction 28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: ILLUMINATION F ECB #35733078X | CLASS - 2 | ACTIVE | $1,250 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2026-05-11 | Construction 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER ECB #35733077Y | CLASS - 2 | ACTIVE | $1,250 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2026-05-11 | Construction 28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: USE OF PROHIBIT ECB #35733080P | CLASS - 2 | ACTIVE | $1,250 | 6bgk-3dad |
| Safety context recordbuilding-scoped | 2025-10-31 | FTF-PL-PER Cycle 1, Sub-cycle C (premises is in Community District 9) | - | Active | - | 855j-jady |
| Safety context recordbuilding-scoped | 2025-10-31 | FTF-PL-PER Cycle 1, Sub-cycle C (premises is in Community District 9) | - | Active | - | 855j-jady |
| ECB summons issuedbuilding-scoped | 2025-07-25 | Construction 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER ECB #35721066K | CLASS - 2 | RESOLVE | $3,125 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2025-07-25 | Construction 28-302.1 FAILURE TO MAINTAIN BLDG WALL(S) OR APPURTENANCES ECB #35721068Y | CLASS - 2 | ACTIVE | $6,250 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2025-07-25 | Construction 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER ECB #35721067M | CLASS - 2 | ACTIVE | $3,125 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2025-07-25 | Construction 27-371, BC 715.3.7 (2008 CODE) & BC 715.4.8 (2014 CODE) EXIT DOOR NOT SELF-CLOSING. ECB #35721065Z | CLASS - 2 | RESOLVE | $625 | 6bgk-3dad |
| Safety context recordbuilding-scoped | 2025-04-23 | - | - | Active | - | 855j-jady |
| ECB summons issuedbuilding-scoped | 2024-09-23 | Construction 27-371, BC 715.3.7 (2008 CODE) & BC 715.4.8 (2014 CODE) EXIT DOOR NOT SELF-CLOSING. ECB #35685039J | CLASS - 2 | RESOLVE | $625 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2024-09-23 | Construction 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER ECB #35685037X | CLASS - 2 | RESOLVE | $625 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2024-09-23 | Construction 28-302.1 FAILURE TO MAINTAIN BLDG WALL(S) OR APPURTENANCES ECB #35685035M | CLASS - 2 | ACTIVE | $3,125 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2024-09-23 | Construction 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER ECB #35685038H | CLASS - 2 | RESOLVE | $625 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2024-09-23 | Construction 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER ECB #35685036Y | CLASS - 2 | ACTIVE | $1,562 | 6bgk-3dad |
Records are the union of DOB Violations (3h2n-5cm9), ECB (6bgk-3dad), Safety Violations (855j-jady), OATH Hearings (jz4z-kudi), and OATH Trials (y3hw-z6bm) that we could link back to this BBL via BIN or address parsing. Events not tagged LL97-specific are shown as building-scoped context. See methodology · enforcement linking.
Fields we cannot show here (internal DOB data not yet public)
Processing lifecycleDOB's internal BEAM system tracks per-building compliance stages, RCE / decarbonization plans, and mitigation credits. Those fields are not yet published as an open dataset. When DOB releases them, this product will show them here without a schema migration. Until then, the following are known gaps for this building:
- Simulated · internal DOB data not yet publicAssessed penalty (vs theoretical)Actual penalty DOB assessed against a building, distinct from the theoretical over-cap exposure computed from LL84 emissions.Best-effort shadow field:
ecb_summons_issuedPublic release status: announced_not_yet_released - Simulated · internal DOB data not yet publicAudit assignmentBuildings selected by DOB for LL97 filing audit and the audit stage.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicAudit outcomeResult of an LL97 audit (accepted / correction ordered / penalty referred).Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicExtension flagWhether a per-building filing was accepted under a filing extension (June 30 grace or BEAM extension to August 29).Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicFiling received dateTimestamp DOB received a per-building LL97 compliance filing.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicGood-faith effort applicationWhether an owner has applied for a good-faith effort determination and its status.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicMediated resolution applicationApplication for the LL97 mediated resolution process and its outcome.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicNotice of deficiency statusWhether a notice of deficiency has been issued for a building and its current stage.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicPer-building filing statusFiling status for each covered BBL/BIN combination (filed / late / non-filed / exempt) as tracked in DOB's BEAM system.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicPre-OATH correspondenceDOB correspondence with owners before an OATH matter is opened (notice of deficiency, cure letters).Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicRDP attestationRegistered Design Professional attestation attached to each per-building compliance filing.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicRECs / offsets claimedRenewable Energy Credits and beneficial-use offsets claimed to reduce reported emissions.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet public60-day cure windowThe 60-day cure window state for a building under LL97 enforcement (open / cured / expired).Public release status: announced_not_yet_released