NYC Prototypes
Skip to main content
BBL 3000860011 · BIN 3325911 · Brooklyn · Block 00086, Lot 0011

175 ADAMS STREET

Article 320Pathway source: CBL PDF row · CP0_article_320_2024CBL revision date 2026-06-16Open CBL source PDF
Buildings on lot 6
← Buildings

Article 320 · numerical caps & computed exposure

How this is computed
PeriodOccupancyGFACapActualDeltaEst. penaltyStatusMethodology
2024-29R-2(high)132,545 sqft894.7 tCO2e4,548.7 tCO2e+3,654.1$979,288
Over cap
v1.0
2030-34R-2(high)132,545 sqft539.5 tCO2e4,548.7 tCO2e+4,009.3$1,074,488
Over cap
v1.0

Cap = Σ (occupancy_coefficient × gross_floor_area) using DOB LL97 rules; actual GHG is the most recent LL84 filing. Delta is positive when actual exceeds cap. Estimated penalty is DOB's public $268/tCO2e × delta with a 30-day grace applied via penalty_estimate_usd.

LL84 GHG emissions history

Actual tCO2e reported to LL84 by report year. Each bar links to the raw LL84 row identifier under the chart for auditability.

20214,464 tCO2e20224,557.2 tCO2e20234,604.7 tCO2e20244,548.7 tCO2e
YearProperty typeGHGProperty GFASite EUISource EUIES scoreSource
2021Multifamily Housing4,464 tCO2e933,418 sqft84.3114.1557x5e-2fxh / 2802065
2022Multifamily Housing4,557.2 tCO2e933,418 sqft83.7112.0615zyy-y8am / 2802065
2023Multifamily Housing4,604.7 tCO2e933,418 sqft77.8106.3595zyy-y8am / 2802065
2024Multifamily Housing4,548.7 tCO2e132,545 sqft533.4729.115zyy-y8am / 65467292

Enforcement events (all DOB + ECB + OATH data cross-linked to this BBL)

Open on enforcement page →
0 LL97-specific events · 16 building-scoped context events.
DOB violation filed0 LL97 · 3 scoped
ECB summons issued0 LL97 · 11 scoped
Safety context record0 LL97 · 2 scoped
StageEvent dateViolationSeverityStatusPenaltySource
ECB summons issuedbuilding-scoped2025-10-31
Construction
28-201.1 UNLAWFUL ACTS. FAILURE TO COMPLY WITH AN ORDER OF THE COMMISSIONER
ECB #39165620J
CLASS - 1ACTIVE$2,5006bgk-3dad
Safety context recordbuilding-scoped2025-09-18
FTF-PL-PER
Cycle 1, Sub-cycle B (premises is in Community District 2)
-Active-855j-jady
DOB violation filedbuilding-scoped2025-09-05
C-CONSTRUCTION OTHER OPTIONAL
AT TIME OF INSPECTION OBSERVED APX 200 2 FEET BY 2 FEET BY 2 INCH THICK CONCRETE PAVERS STACKED IN 4 ROWS ON ONE SIDE OF THE ROOF POSING EXCESSIVE LOAD ISSUE AND POSSIBLE COLLAPSE
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9
ECB summons issuedbuilding-scoped2025-09-05
Construction
§28-105.11 FAILURE TO POST PERMIT FOR WORK AT PREMISES
ECB #39159427R
CLASS - 2ACTIVE$3306bgk-3dad
ECB summons issuedbuilding-scoped2025-09-05
Construction
§28-105.11 FAILURE TO POST PERMIT FOR WORK AT PREMISES
ECB #39159425N
CLASS - 2ACTIVE$3006bgk-3dad
ECB summons issuedbuilding-scoped2025-09-05
Construction
BC 3303.4.6 & 27-1018 UNSAFE STORAGE OF COMBUSTIBLE MATERIAL AND EQUIPMENT
ECB #39159426P
CLASS - 1RESOLVE$06bgk-3dad
ECB summons issuedbuilding-scoped2025-09-05
Construction
28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER
ECB #39159424L
CLASS - 1RESOLVE$2,5006bgk-3dad
ECB summons issuedbuilding-scoped2025-03-16
Construction
28-105.12.2 WRK DOESN'T CONFORM TO APPROV DOCS AND/OR APPROV AMENDMENTS
ECB #39538043H
CLASS - 1RESOLVE$6256bgk-3dad
ECB summons issuedbuilding-scoped2025-01-14
Unknown
ECB #39535959Y
CLASS - 2RESOLVE$06bgk-3dad
ECB summons issuedbuilding-scoped2025-01-02
Construction
BC 3307.6,27-1021 SIDEWALK SHED DOES NOT MEET CODE SPECIFICATIONS
ECB #39535569Z
CLASS - 2RESOLVE$2,4006bgk-3dad
ECB summons issuedbuilding-scoped2024-08-06
Construction
28-105.1 WORK WITHOUT A PERMIT
ECB #39121017K
CLASS - 3RESOLVE$1256bgk-3dad
DOB violation filedbuilding-scoped2024-05-03
BENCH-FAILURE TO BENCHMARK NONE
FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
-V*-DOB VIOLATION - DISMISSED-3h2n-5cm9
Safety context recordbuilding-scoped2024-05-03
FTF-EN-BENCH
-Dismissed-855j-jady
ECB summons issuedbuilding-scoped2024-04-19
Unknown
27-3018(B) ELECTRICAL WORK WITHOUT A PERMIT
ECB #39112130H
CLASS - 2RESOLVE$8006bgk-3dad
ECB summons issuedbuilding-scoped2024-04-19
Construction
28-105.1 WORK WITHOUT A PERMIT
ECB #39112116L
CLASS - 2RESOLVE$1,2506bgk-3dad
DOB violation filedbuilding-scoped2024-03-08
P-PLUMBING NONE
BASED ON COMMISSIONER'S SUSPENSION NOTIFICATION ON 02/28/2024 INTENDS TO REVOKE ALL PLUMBING APPROVALS AND PERMIT ISSUED UNDER JOB# B00911213 DUE TO SUSPENSION OF LICENSE MASTER PLUMBER# 002245. STOP ALL PLUMBING WORK UNDER ABOVE MENTIONED PERMIT IMMEDIATELY.
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9

Records are the union of DOB Violations (3h2n-5cm9), ECB (6bgk-3dad), Safety Violations (855j-jady), OATH Hearings (jz4z-kudi), and OATH Trials (y3hw-z6bm) that we could link back to this BBL via BIN or address parsing. Events not tagged LL97-specific are shown as building-scoped context. See methodology · enforcement linking.

Fields we cannot show here (internal DOB data not yet public)

Processing lifecycle

DOB's internal BEAM system tracks per-building compliance stages, RCE / decarbonization plans, and mitigation credits. Those fields are not yet published as an open dataset. When DOB releases them, this product will show them here without a schema migration. Until then, the following are known gaps for this building:

  • Assessed penalty (vs theoretical)
    Actual penalty DOB assessed against a building, distinct from the theoretical over-cap exposure computed from LL84 emissions.
    Simulated · internal DOB data not yet public
    Best-effort shadow field: ecb_summons_issued
    Public release status: announced_not_yet_released
  • Audit assignment
    Buildings selected by DOB for LL97 filing audit and the audit stage.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Audit outcome
    Result of an LL97 audit (accepted / correction ordered / penalty referred).
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Extension flag
    Whether a per-building filing was accepted under a filing extension (June 30 grace or BEAM extension to August 29).
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Filing received date
    Timestamp DOB received a per-building LL97 compliance filing.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Good-faith effort application
    Whether an owner has applied for a good-faith effort determination and its status.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Mediated resolution application
    Application for the LL97 mediated resolution process and its outcome.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Notice of deficiency status
    Whether a notice of deficiency has been issued for a building and its current stage.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Per-building filing status
    Filing status for each covered BBL/BIN combination (filed / late / non-filed / exempt) as tracked in DOB's BEAM system.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Pre-OATH correspondence
    DOB correspondence with owners before an OATH matter is opened (notice of deficiency, cure letters).
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • RDP attestation
    Registered Design Professional attestation attached to each per-building compliance filing.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • RECs / offsets claimed
    Renewable Energy Credits and beneficial-use offsets claimed to reduce reported emissions.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • 60-day cure window
    The 60-day cure window state for a building under LL97 enforcement (open / cured / expired).
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
Every number on this page traces back to a Socrata dataset row or a CBL PDF revision. Where DOB does not publish a computable field (pathway, internal BEAM stage, compliance decision), we say so on the record instead of hiding the gap. See methodology.