1238 PRESIDENT STREET
CP2_article_320_2035CBL revision date 2026-06-16Open CBL source PDFArticle 320 · numerical caps & computed exposure
How this is computed| Period | Occupancy | GFA | Cap | Actual | Delta | Est. penalty | Status | Methodology |
|---|---|---|---|---|---|---|---|---|
| 2024-29 | R-2(high) | 221,100 sqft | 1,492.4 tCO2e | 1,872.9 tCO2e | +380.5 | $101,975 | Over capEJ · PEJA fallback | v1.0 |
| 2030-34 | R-2(high) | 221,100 sqft | 899.9 tCO2e | 1,872.9 tCO2e | +973.1 | $260,778 | Over capEJ · PEJA fallback | v1.0 |
Cap = Σ (occupancy_coefficient × gross_floor_area) using DOB LL97 rules; actual GHG is the most recent LL84 filing. Delta is positive when actual exceeds cap. Estimated penalty is DOB's public $268/tCO2e × delta with a 30-day grace applied via penalty_estimate_usd.
LL84 GHG emissions history
Actual tCO2e reported to LL84 by report year. Each bar links to the raw LL84 row identifier under the chart for auditability.
| Year | Property type | GHG | Property GFA | Site EUI | Source EUI | ES score | Source |
|---|---|---|---|---|---|---|---|
| 2021 | Multifamily Housing | 1,722.8 tCO2e | 222,000 sqft | 137.0 | 184.6 | 5 | 7x5e-2fxh / 20636764 |
| 2022 | Multifamily Housing | 1,874.7 tCO2e | 222,000 sqft | 145.5 | 192.7 | 4 | 5zyy-y8am / 20636764 |
| 2023 | Multifamily Housing | - | 221,100 sqft | - | - | - | 5zyy-y8am / 4376494 |
| 2024 | Multifamily Housing | 1,872.9 tCO2e | 221,100 sqft | 134.9 | 178.5 | 3 | 5zyy-y8am / 56090592 |
Enforcement events (all DOB + ECB + OATH data cross-linked to this BBL)
Open on enforcement page →| Stage | Event date | Violation | Severity | Status | Penalty | Source |
|---|---|---|---|---|---|---|
| ECB summons issuedbuilding-scoped | 2026-05-28 | Construction BC 3301.7 (2014 CODE) FAILURE TO MAINTAIN/DISPLAY ON SITE DOCUMENTS REQUIRED BY BC CHAPTER 3 ECB #39554727Z | CLASS - 2 | ACTIVE | $1,250 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2026-05-28 | Cranes and Derricks BC 3314.4.3.1 (2008 CODE), 27-1045 & BC 3314.4.3 (2014 CODE) FAILURE TO PERFORM SAFE/PROPER INSPECTION OF SUSPENDED SCAFFOLD. ECB #39554728K | CLASS - 1 | RESOLVE | $10,000 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2026-05-28 | Construction BC 3301.9,27-10009(C) FAIL TO PROVIDE/POST SIGN(S) AT JB SITE PURSUANT TO SUBSEC ECB #39554732N | CLASS - 2 | ACTIVE | $1,250 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2026-05-28 | Construction BC 3307.6,27-1021 SIDEWALK SHED DOES NOT MEET CODE SPECIFICATIONS ECB #39554733P | CLASS - 2 | ACTIVE | $2,400 | 6bgk-3dad |
| Safety context recordbuilding-scoped | 2026-03-17 | FTC-AEU-HAZ | - | Active | - | 855j-jady |
| Safety context recordbuilding-scoped | 2026-03-17 | FTC-AEU-HAZ | - | Active | - | 855j-jady |
| Safety context recordbuilding-scoped | 2024-11-26 | FTC-AEU-HAZ | - | Active | - | 855j-jady |
| DOB violation filedbuilding-scoped | 2024-11-26 | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION | - | V-DOB VIOLATION - ACTIVE | - | 3h2n-5cm9 |
| DOB violation filedbuilding-scoped | 2024-09-10 | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL IMMEDIATELY INSTALL 440' LINEAR FEET ON NORTH ELEVATION (PRESIDENT ST) 260' LINEAR FEET ON WEST ELEVATION (NOSTRAND AVE_ AND 300' LINEAR FEET ON SOUTH ELEVATION (CARROLL ST) OF SIDEWALK SHED. AS PER 1 RCNY 103.04 | - | V-DOB VIOLATION - ACTIVE | - | 3h2n-5cm9 |
| ECB summons issuedbuilding-scoped | 2024-08-13 | Construction 28-201.1 UNLAWFUL ACTS. FAILURE TO COMPLY WITH AN ORDER OF THE COMMISSIONER ECB #35686128X | CLASS - 1 | RESOLVE | $6,250 | 6bgk-3dad |
| DOB violation filedbuilding-scoped | 2024-07-10 | C-CONSTRUCTION OTHER OPTIONAL PARTIAL VACATE ORDER DUE TO CRACK/SPALLED CONCRETE BALCONIES SLABS & EXPOSED REBARS @ MULTIPLE LOCATIONS IN 15STORY MAIN BLDG & ADJACENT 3- STORY TOWNHOUSE BLDGS. CONDITION MADE ENTIRE BALCONIES UNABLE TO BE UNOCCUPIED. REMEDY:VACATE ALL FACADE BALCONIES AT THE MAIN BUILDING AND ALL BALCONIES AT 3 STORIES TOWNHOUSE BUILDINGS | - | V-DOB VIOLATION - ACTIVE | - | 3h2n-5cm9 |
| ECB summons issuedbuilding-scoped | 2024-06-25 | Construction 28-302.1 FAILURE TO MAINTAIN BLDG WALL(S) OR APPURTENANCES ECB #35685384K | CLASS - 1 | ACTIVE | $12,500 | 6bgk-3dad |
| DOB violation filedbuilding-scoped | 2024-06-25 | C-CONSTRUCTION OTHER OPTIONAL EMERGENCY WORK ORDER DUE TO HAZARDOUS CONDITIONS SUCH AS CRACKED/SPALL ING CONCRETE,EXPOSED REBARS AND SEVERELY DAMAGED BALCONY SLAB OBSERVED AT BOTH THE MAIN 15-STORY BUILDING AND THE 3-STORY TOWNHOUSE.REMEDY:IM MEDIATELT PROVIDE SAFETY MEASURES AROUND ALL ELEVATIONS AND IMMEDIATEL Y REPAIR DEFECTED FACADE UNDER A NYS PE DESIGN PROFESSIONAL | - | V-DOB VIOLATION - ACTIVE | - | 3h2n-5cm9 |
| Safety context recordbuilding-scoped | 2024-02-22 | FISPNRF FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024 | - | Active | - | 855j-jady |
| DOB violation filedbuilding-scoped | 2024-02-22 | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024 | - | V-DOB VIOLATION - ACTIVE | - | 3h2n-5cm9 |
| DOB violation filedbuilding-scoped | 2024-02-20 | FISPHAZ-HAZARDOUS CONDITION (FACADE) FACADE REQUIRED CYCLE 9C UNSAFE REPORT FILED | - | V-DOB VIOLATION - ACTIVE | - | 3h2n-5cm9 |
| Safety context recordbuilding-scoped | 2024-02-20 | FISPHAZ CYCLE 9C UNSAFE REPORT FILED | - | Active | - | 855j-jady |
Records are the union of DOB Violations (3h2n-5cm9), ECB (6bgk-3dad), Safety Violations (855j-jady), OATH Hearings (jz4z-kudi), and OATH Trials (y3hw-z6bm) that we could link back to this BBL via BIN or address parsing. Events not tagged LL97-specific are shown as building-scoped context. See methodology · enforcement linking.
Data quality flags
- default_value_reportedSee methodology for the exact definition of this flag; behavior may vary by pathway or period.
Full flag catalog: methodology · data quality flags
Fields we cannot show here (internal DOB data not yet public)
Processing lifecycleDOB's internal BEAM system tracks per-building compliance stages, RCE / decarbonization plans, and mitigation credits. Those fields are not yet published as an open dataset. When DOB releases them, this product will show them here without a schema migration. Until then, the following are known gaps for this building:
- Simulated · internal DOB data not yet publicAssessed penalty (vs theoretical)Actual penalty DOB assessed against a building, distinct from the theoretical over-cap exposure computed from LL84 emissions.Best-effort shadow field:
ecb_summons_issuedPublic release status: announced_not_yet_released - Simulated · internal DOB data not yet publicAudit assignmentBuildings selected by DOB for LL97 filing audit and the audit stage.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicAudit outcomeResult of an LL97 audit (accepted / correction ordered / penalty referred).Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicExtension flagWhether a per-building filing was accepted under a filing extension (June 30 grace or BEAM extension to August 29).Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicFiling received dateTimestamp DOB received a per-building LL97 compliance filing.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicGood-faith effort applicationWhether an owner has applied for a good-faith effort determination and its status.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicMediated resolution applicationApplication for the LL97 mediated resolution process and its outcome.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicNotice of deficiency statusWhether a notice of deficiency has been issued for a building and its current stage.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicPer-building filing statusFiling status for each covered BBL/BIN combination (filed / late / non-filed / exempt) as tracked in DOB's BEAM system.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicPre-OATH correspondenceDOB correspondence with owners before an OATH matter is opened (notice of deficiency, cure letters).Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicRDP attestationRegistered Design Professional attestation attached to each per-building compliance filing.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicRECs / offsets claimedRenewable Energy Credits and beneficial-use offsets claimed to reduce reported emissions.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet public60-day cure windowThe 60-day cure window state for a building under LL97 enforcement (open / cured / expired).Public release status: announced_not_yet_released