NYC Prototypes
Skip to main content
BBL 3012830001 · BIN 3337867 · Brooklyn · Block 01283, Lot 0001

1238 PRESIDENT STREET

Article 320Pathway source: CBL PDF row · CP2_article_320_2035CBL revision date 2026-06-16Open CBL source PDF
Buildings on lot 1
← Buildings

Article 320 · numerical caps & computed exposure

How this is computed
PeriodOccupancyGFACapActualDeltaEst. penaltyStatusMethodology
2024-29R-2(high)221,100 sqft1,492.4 tCO2e1,872.9 tCO2e+380.5$101,975
Over capEJ · PEJA fallback
v1.0
2030-34R-2(high)221,100 sqft899.9 tCO2e1,872.9 tCO2e+973.1$260,778
Over capEJ · PEJA fallback
v1.0

Cap = Σ (occupancy_coefficient × gross_floor_area) using DOB LL97 rules; actual GHG is the most recent LL84 filing. Delta is positive when actual exceeds cap. Estimated penalty is DOB's public $268/tCO2e × delta with a 30-day grace applied via penalty_estimate_usd.

LL84 GHG emissions history

Actual tCO2e reported to LL84 by report year. Each bar links to the raw LL84 row identifier under the chart for auditability.

20211,722.8 tCO2e20221,874.7 tCO2e2023-20241,872.9 tCO2e
YearProperty typeGHGProperty GFASite EUISource EUIES scoreSource
2021Multifamily Housing1,722.8 tCO2e222,000 sqft137.0184.657x5e-2fxh / 20636764
2022Multifamily Housing1,874.7 tCO2e222,000 sqft145.5192.745zyy-y8am / 20636764
2023Multifamily Housing-221,100 sqft---5zyy-y8am / 4376494
2024Multifamily Housing1,872.9 tCO2e221,100 sqft134.9178.535zyy-y8am / 56090592

Enforcement events (all DOB + ECB + OATH data cross-linked to this BBL)

Open on enforcement page →
0 LL97-specific events · 17 building-scoped context events.
DOB violation filed0 LL97 · 6 scoped
ECB summons issued0 LL97 · 6 scoped
Safety context record0 LL97 · 5 scoped
StageEvent dateViolationSeverityStatusPenaltySource
ECB summons issuedbuilding-scoped2026-05-28
Construction
BC 3301.7 (2014 CODE) FAILURE TO MAINTAIN/DISPLAY ON SITE DOCUMENTS REQUIRED BY BC CHAPTER 3
ECB #39554727Z
CLASS - 2ACTIVE$1,2506bgk-3dad
ECB summons issuedbuilding-scoped2026-05-28
Cranes and Derricks
BC 3314.4.3.1 (2008 CODE), 27-1045 & BC 3314.4.3 (2014 CODE) FAILURE TO PERFORM SAFE/PROPER INSPECTION OF SUSPENDED SCAFFOLD.
ECB #39554728K
CLASS - 1RESOLVE$10,0006bgk-3dad
ECB summons issuedbuilding-scoped2026-05-28
Construction
BC 3301.9,27-10009(C) FAIL TO PROVIDE/POST SIGN(S) AT JB SITE PURSUANT TO SUBSEC
ECB #39554732N
CLASS - 2ACTIVE$1,2506bgk-3dad
ECB summons issuedbuilding-scoped2026-05-28
Construction
BC 3307.6,27-1021 SIDEWALK SHED DOES NOT MEET CODE SPECIFICATIONS
ECB #39554733P
CLASS - 2ACTIVE$2,4006bgk-3dad
Safety context recordbuilding-scoped2026-03-17
FTC-AEU-HAZ
-Active-855j-jady
Safety context recordbuilding-scoped2026-03-17
FTC-AEU-HAZ
-Active-855j-jady
Safety context recordbuilding-scoped2024-11-26
FTC-AEU-HAZ
-Active-855j-jady
DOB violation filedbuilding-scoped2024-11-26
AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9
DOB violation filedbuilding-scoped2024-09-10
IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL
IMMEDIATELY INSTALL 440' LINEAR FEET ON NORTH ELEVATION (PRESIDENT ST) 260' LINEAR FEET ON WEST ELEVATION (NOSTRAND AVE_ AND 300' LINEAR FEET ON SOUTH ELEVATION (CARROLL ST) OF SIDEWALK SHED. AS PER 1 RCNY 103.04
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9
ECB summons issuedbuilding-scoped2024-08-13
Construction
28-201.1 UNLAWFUL ACTS. FAILURE TO COMPLY WITH AN ORDER OF THE COMMISSIONER
ECB #35686128X
CLASS - 1RESOLVE$6,2506bgk-3dad
DOB violation filedbuilding-scoped2024-07-10
C-CONSTRUCTION OTHER OPTIONAL
PARTIAL VACATE ORDER DUE TO CRACK/SPALLED CONCRETE BALCONIES SLABS & EXPOSED REBARS @ MULTIPLE LOCATIONS IN 15STORY MAIN BLDG & ADJACENT 3- STORY TOWNHOUSE BLDGS. CONDITION MADE ENTIRE BALCONIES UNABLE TO BE UNOCCUPIED. REMEDY:VACATE ALL FACADE BALCONIES AT THE MAIN BUILDING AND ALL BALCONIES AT 3 STORIES TOWNHOUSE BUILDINGS
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9
ECB summons issuedbuilding-scoped2024-06-25
Construction
28-302.1 FAILURE TO MAINTAIN BLDG WALL(S) OR APPURTENANCES
ECB #35685384K
CLASS - 1ACTIVE$12,5006bgk-3dad
DOB violation filedbuilding-scoped2024-06-25
C-CONSTRUCTION OTHER OPTIONAL
EMERGENCY WORK ORDER DUE TO HAZARDOUS CONDITIONS SUCH AS CRACKED/SPALL ING CONCRETE,EXPOSED REBARS AND SEVERELY DAMAGED BALCONY SLAB OBSERVED AT BOTH THE MAIN 15-STORY BUILDING AND THE 3-STORY TOWNHOUSE.REMEDY:IM MEDIATELT PROVIDE SAFETY MEASURES AROUND ALL ELEVATIONS AND IMMEDIATEL Y REPAIR DEFECTED FACADE UNDER A NYS PE DESIGN PROFESSIONAL
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9
Safety context recordbuilding-scoped2024-02-22
FISPNRF
FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024
-Active-855j-jady
DOB violation filedbuilding-scoped2024-02-22
FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED
FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9
DOB violation filedbuilding-scoped2024-02-20
FISPHAZ-HAZARDOUS CONDITION (FACADE) FACADE REQUIRED
CYCLE 9C UNSAFE REPORT FILED
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9
Safety context recordbuilding-scoped2024-02-20
FISPHAZ
CYCLE 9C UNSAFE REPORT FILED
-Active-855j-jady

Records are the union of DOB Violations (3h2n-5cm9), ECB (6bgk-3dad), Safety Violations (855j-jady), OATH Hearings (jz4z-kudi), and OATH Trials (y3hw-z6bm) that we could link back to this BBL via BIN or address parsing. Events not tagged LL97-specific are shown as building-scoped context. See methodology · enforcement linking.

Data quality flags

  • default_value_reportedSee methodology for the exact definition of this flag; behavior may vary by pathway or period.

Full flag catalog: methodology · data quality flags

Fields we cannot show here (internal DOB data not yet public)

Processing lifecycle

DOB's internal BEAM system tracks per-building compliance stages, RCE / decarbonization plans, and mitigation credits. Those fields are not yet published as an open dataset. When DOB releases them, this product will show them here without a schema migration. Until then, the following are known gaps for this building:

  • Assessed penalty (vs theoretical)
    Actual penalty DOB assessed against a building, distinct from the theoretical over-cap exposure computed from LL84 emissions.
    Simulated · internal DOB data not yet public
    Best-effort shadow field: ecb_summons_issued
    Public release status: announced_not_yet_released
  • Audit assignment
    Buildings selected by DOB for LL97 filing audit and the audit stage.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Audit outcome
    Result of an LL97 audit (accepted / correction ordered / penalty referred).
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Extension flag
    Whether a per-building filing was accepted under a filing extension (June 30 grace or BEAM extension to August 29).
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Filing received date
    Timestamp DOB received a per-building LL97 compliance filing.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Good-faith effort application
    Whether an owner has applied for a good-faith effort determination and its status.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Mediated resolution application
    Application for the LL97 mediated resolution process and its outcome.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Notice of deficiency status
    Whether a notice of deficiency has been issued for a building and its current stage.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Per-building filing status
    Filing status for each covered BBL/BIN combination (filed / late / non-filed / exempt) as tracked in DOB's BEAM system.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Pre-OATH correspondence
    DOB correspondence with owners before an OATH matter is opened (notice of deficiency, cure letters).
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • RDP attestation
    Registered Design Professional attestation attached to each per-building compliance filing.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • RECs / offsets claimed
    Renewable Energy Credits and beneficial-use offsets claimed to reduce reported emissions.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • 60-day cure window
    The 60-day cure window state for a building under LL97 enforcement (open / cured / expired).
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
Every number on this page traces back to a Socrata dataset row or a CBL PDF revision. Where DOB does not publish a computable field (pathway, internal BEAM stage, compliance decision), we say so on the record instead of hiding the gap. See methodology.