CP4_city_portfolioCBL revision date 2026-06-16Open CBL source PDFArticle 320 · numerical caps & computed exposure
How this is computed| Period | Occupancy | GFA | Cap | Actual | Delta | Est. penalty | Status | Methodology |
|---|---|---|---|---|---|---|---|---|
| 2024-29 | R-2(high) | 748,500 sqft | 5,052.4 tCO2e | 6,551.3 tCO2e | +1,498.9 | $401,707 | Over capEJ · PEJA fallback | v1.0 |
| 2030-34 | R-2(high) | 748,500 sqft | 3,046.4 tCO2e | 6,551.3 tCO2e | +3,504.9 | $939,309 | Over capEJ · PEJA fallback | v1.0 |
Cap = Σ (occupancy_coefficient × gross_floor_area) using DOB LL97 rules; actual GHG is the most recent LL84 filing. Delta is positive when actual exceeds cap. Estimated penalty is DOB's public $268/tCO2e × delta with a 30-day grace applied via penalty_estimate_usd.
LL84 GHG emissions history
Actual tCO2e reported to LL84 by report year. Each bar links to the raw LL84 row identifier under the chart for auditability.
| Year | Property type | GHG | Property GFA | Site EUI | Source EUI | ES score | Source |
|---|---|---|---|---|---|---|---|
| 2022 | Multifamily Housing | 4,400.1 tCO2e | 748,500 sqft | 96.5 | 143.2 | 49 | 5zyy-y8am / 2831069 |
| 2023 | Multifamily Housing | 5,025.5 tCO2e | 748,500 sqft | 101.2 | 148.4 | 35 | 5zyy-y8am / 2831069 |
| 2024 | Multifamily Housing | 6,551.3 tCO2e | 748,500 sqft | 136.2 | 185.9 | 11 | 5zyy-y8am / 2831069 |
Enforcement events (all DOB + ECB + OATH data cross-linked to this BBL)
Open on enforcement page →| Stage | Event date | Violation | Severity | Status | Penalty | Source |
|---|---|---|---|---|---|---|
| ECB summons issuedbuilding-scoped | 2026-03-25 | Construction 28-302.5 FAIL TO TAKE REQUIRED MEASURES TO SECURE PUBLIC SAFWTY-UNSAFE FACADE ECB #35726896M | CLASS - 1 | ACTIVE | $10,000 | 6bgk-3dad |
| DOB violation filedbuilding-scoped | 2025-11-14 | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | - | V*-DOB VIOLATION - DISMISSED | - | 3h2n-5cm9 |
| DOB violation filedbuilding-scoped | 2025-11-14 | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | - | V*-DOB VIOLATION - DISMISSED | - | 3h2n-5cm9 |
| DOB violation filedbuilding-scoped | 2025-11-14 | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | - | V*-DOB VIOLATION - DISMISSED | - | 3h2n-5cm9 |
| DOB violation filedbuilding-scoped | 2025-11-14 | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | - | V*-DOB VIOLATION - DISMISSED | - | 3h2n-5cm9 |
| Safety context recordbuilding-scoped | 2025-11-14 | LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | - | Dismissed | - | 855j-jady |
| Safety context recordbuilding-scoped | 2025-11-14 | LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | - | Dismissed | - | 855j-jady |
| Safety context recordbuilding-scoped | 2025-11-14 | LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | - | Dismissed | - | 855j-jady |
| Safety context recordbuilding-scoped | 2025-11-14 | LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | - | Dismissed | - | 855j-jady |
| Safety context recordbuilding-scoped | 2025-10-10 | FTC-VT-PER-HA Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction | - | Dismissed | - | 855j-jady |
| DOB violation filedbuilding-scoped | 2025-06-03 | C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.AS NOTED AT TIME OF INSPECTION,OBSERVED ON EXP1,2,3&4 ELEVATIONS STEP CRACKS AND DAMAG ED MORTAR JOINGS AT PARAPET AND ON 13TH FL LINTELS.AC INADEQUATELY SUP PORTED ON SEVERAL FLOORS AND EXP3 EAST ELEV LOOSE SAFETY GRILL ON 13TH FL.DAMAGED MORTAR BENEATH 13TH FL WINDOW.REMEDY:REPAIR OR REPLACE | - | V-DOB VIOLATION - ACTIVE | - | 3h2n-5cm9 |
| Safety context recordbuilding-scoped | 2024-10-11 | FTC-VT-PER-HA Violation Issued-Failure To File 2023 Periodic Inspection Affirmation of Correction | - | Dismissed | - | 855j-jady |
| Safety context recordbuilding-scoped | 2024-09-11 | FTF-VT-CAT1-HA Violation Issued-Failure To File 2023 Cat1 Test Report | - | Dismissed | - | 855j-jady |
| Safety context recordbuilding-scoped | 2024-06-23 | FTF-EN-EARCX | - | Dismissed | - | 855j-jady |
| DOB violation filedbuilding-scoped | 2024-06-23 | EARCX-FAILURE TO SUBMIT EER NONE FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2023) | - | V*-DOB VIOLATION - DISMISSED | - | 3h2n-5cm9 |
Records are the union of DOB Violations (3h2n-5cm9), ECB (6bgk-3dad), Safety Violations (855j-jady), OATH Hearings (jz4z-kudi), and OATH Trials (y3hw-z6bm) that we could link back to this BBL via BIN or address parsing. Events not tagged LL97-specific are shown as building-scoped context. See methodology · enforcement linking.
Fields we cannot show here (internal DOB data not yet public)
Processing lifecycleDOB's internal BEAM system tracks per-building compliance stages, RCE / decarbonization plans, and mitigation credits. Those fields are not yet published as an open dataset. When DOB releases them, this product will show them here without a schema migration. Until then, the following are known gaps for this building:
- Simulated · internal DOB data not yet publicAssessed penalty (vs theoretical)Actual penalty DOB assessed against a building, distinct from the theoretical over-cap exposure computed from LL84 emissions.Best-effort shadow field:
ecb_summons_issuedPublic release status: announced_not_yet_released - Simulated · internal DOB data not yet publicAudit assignmentBuildings selected by DOB for LL97 filing audit and the audit stage.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicAudit outcomeResult of an LL97 audit (accepted / correction ordered / penalty referred).Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicExtension flagWhether a per-building filing was accepted under a filing extension (June 30 grace or BEAM extension to August 29).Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicFiling received dateTimestamp DOB received a per-building LL97 compliance filing.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicGood-faith effort applicationWhether an owner has applied for a good-faith effort determination and its status.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicMediated resolution applicationApplication for the LL97 mediated resolution process and its outcome.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicNotice of deficiency statusWhether a notice of deficiency has been issued for a building and its current stage.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicPer-building filing statusFiling status for each covered BBL/BIN combination (filed / late / non-filed / exempt) as tracked in DOB's BEAM system.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicPre-OATH correspondenceDOB correspondence with owners before an OATH matter is opened (notice of deficiency, cure letters).Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicRDP attestationRegistered Design Professional attestation attached to each per-building compliance filing.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicRECs / offsets claimedRenewable Energy Credits and beneficial-use offsets claimed to reduce reported emissions.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet public60-day cure windowThe 60-day cure window state for a building under LL97 enforcement (open / cured / expired).Public release status: announced_not_yet_released