3331439, 9910 SEAVIEW AVENUE
CP4_city_portfolioCBL revision date 2026-06-16Open CBL source PDFArticle 320 · numerical caps & computed exposure
How this is computed| Period | Occupancy | GFA | Cap | Actual | Delta | Est. penalty | Status | Methodology |
|---|---|---|---|---|---|---|---|---|
| 2024-29 | R-2(high) | 1,795,600 sqft | 12,120 tCO2e | 15,536 tCO2e | +3,415.5 | $915,351 | Over capEJ · PEJA fallback | v1.0 |
| 2030-34 | R-2(high) | 1,795,600 sqft | 7,308.1 tCO2e | 15,536 tCO2e | +8,227.7 | $2,205,023 | Over capEJ · PEJA fallback | v1.0 |
Cap = Σ (occupancy_coefficient × gross_floor_area) using DOB LL97 rules; actual GHG is the most recent LL84 filing. Delta is positive when actual exceeds cap. Estimated penalty is DOB's public $268/tCO2e × delta with a 30-day grace applied via penalty_estimate_usd.
LL84 GHG emissions history
Actual tCO2e reported to LL84 by report year. Each bar links to the raw LL84 row identifier under the chart for auditability.
| Year | Property type | GHG | Property GFA | Site EUI | Source EUI | ES score | Source |
|---|---|---|---|---|---|---|---|
| 2022 | Multifamily Housing | 2,566.4 tCO2e | 1,759,600 sqft | 17.7 | 47.4 | 100 | 5zyy-y8am / 2830946 |
| 2023 | Multifamily Housing | 13,605 tCO2e | 1,759,600 sqft | 127.8 | 163.9 | 14 | 5zyy-y8am / 2830946 |
| 2024 | Multifamily Housing | 15,536 tCO2e | 1,795,600 sqft | 128.5 | 170.2 | 11 | 5zyy-y8am / 2830946 |
Enforcement events (all DOB + ECB + OATH data cross-linked to this BBL)
Open on enforcement page →| Stage | Event date | Violation | Severity | Status | Penalty | Source |
|---|---|---|---|---|---|---|
| ECB summons issuedbuilding-scoped | 2026-05-28 | Unknown ECB #39554739X | CLASS - 1 | ACTIVE | $10,000 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2026-05-27 | Unknown BC 3301.12.2 FAILURE TO COMMUNICATE REQUIRED INFORMATION TO WORKERS DURING PRE-SHIF ECB #39554668H | CLASS - 1 | ACTIVE | $5,000 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2026-05-14 | Boilers 28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: SERVICE EQUIPME ECB #39188688H | CLASS - 3 | ACTIVE | $500 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2026-04-30 | Construction AC 28-204.4 FAIL TO COMPLY W/COMMISSIONER ORDER TO FILE CERT OF CORRECTION W/DOB ECB #39553688K | CLASS - 2 | ACTIVE | $1,250 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2026-03-04 | Cranes and Derricks BC 3314.1.1 & 27-1050.1 FAILED TO NOTIFY DEPARTMENT/OBTAIN PERMIT PRIOR TO USE/INST. OFF C-HOO ECB #39551208N | CLASS - 2 | RESOLVE | $2,500 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2026-03-04 | Construction 28-105.1 WORK WITHOUT A PERMIT ECB #39551212X | CLASS - 1 | ACTIVE | $12,500 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2026-03-04 | Construction BC 3301.8 FAILURE TO IMMEDIATELY NOTIFY THE DEPARTMENT OF AN ACCIDENT AT CONSTRU ECB #39551198Z | CLASS - 1 | RESOLVE | $5,000 | 6bgk-3dad |
| DOB violation filedbuilding-scoped | 2025-11-14 | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | - | V-DOB VIOLATION - ACTIVE | - | 3h2n-5cm9 |
| Safety context recordbuilding-scoped | 2025-11-14 | LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | - | Active | - | 855j-jady |
| DOB violation filedbuilding-scoped | 2025-11-14 | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | - | V-DOB VIOLATION - ACTIVE | - | 3h2n-5cm9 |
| DOB violation filedbuilding-scoped | 2025-11-14 | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | - | V-DOB VIOLATION - ACTIVE | - | 3h2n-5cm9 |
| DOB violation filedbuilding-scoped | 2025-11-14 | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | - | V-DOB VIOLATION - ACTIVE | - | 3h2n-5cm9 |
| DOB violation filedbuilding-scoped | 2025-11-14 | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | - | V-DOB VIOLATION - ACTIVE | - | 3h2n-5cm9 |
| DOB violation filedbuilding-scoped | 2025-11-14 | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | - | V-DOB VIOLATION - ACTIVE | - | 3h2n-5cm9 |
| DOB violation filedbuilding-scoped | 2025-11-14 | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | - | V-DOB VIOLATION - ACTIVE | - | 3h2n-5cm9 |
| Safety context recordbuilding-scoped | 2025-11-14 | LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | - | Active | - | 855j-jady |
| Safety context recordbuilding-scoped | 2025-11-14 | LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | - | Active | - | 855j-jady |
| Safety context recordbuilding-scoped | 2025-11-14 | LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | - | Active | - | 855j-jady |
| Safety context recordbuilding-scoped | 2025-11-14 | LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | - | Active | - | 855j-jady |
| Safety context recordbuilding-scoped | 2025-11-14 | LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | - | Active | - | 855j-jady |
| Safety context recordbuilding-scoped | 2025-11-14 | LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | - | Active | - | 855j-jady |
| Safety context recordbuilding-scoped | 2025-11-14 | LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | - | Active | - | 855j-jady |
| DOB violation filedbuilding-scoped | 2025-11-14 | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | - | V-DOB VIOLATION - ACTIVE | - | 3h2n-5cm9 |
| DOB violation filedbuilding-scoped | 2025-06-27 | P-PLUMBING NONE BASED ON LICENSE #001343 BEING INACTIVE STOP ALL PLUMBING WORK UNDER JOB #300664993 IMMEDIATELY. | - | V*-DOB VIOLATION - DISMISSED | - | 3h2n-5cm9 |
| DOB violation filedbuilding-scoped | 2025-06-27 | P-PLUMBING NONE BASED ON LICENSE #001343 BEING INACTIVE STOP ALL PLUMBING WORK UNDER JOB #300664966 IMMEDIATELY. | - | V*-DOB VIOLATION - DISMISSED | - | 3h2n-5cm9 |
| DOB violation filedbuilding-scoped | 2025-06-27 | P-PLUMBING NONE BASED ON LICENSE #001343 BEING INACTIVE STOP ALL PLUMBING WORK UNDER JOB #300691712 IMMEDIATELY. | - | V*-DOB VIOLATION - DISMISSED | - | 3h2n-5cm9 |
| DOB violation filedbuilding-scoped | 2025-06-27 | P-PLUMBING NONE BASED ON LICENSE #001343 BEING INACTIVE STOP ALL PLUMBING WORK UNDER JOB #300665778 IMMEDIATELY. | - | V*-DOB VIOLATION - DISMISSED | - | 3h2n-5cm9 |
| ECB summons issuedbuilding-scoped | 2024-12-10 | Boilers 28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: SERVICE EQUIPME ECB #39132515R | CLASS - 2 | RESOLVE | $625 | 6bgk-3dad |
| Safety context recordbuilding-scoped | 2024-10-11 | FTC-VT-CAT1-HA Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction | - | Dismissed | - | 855j-jady |
| Safety context recordbuilding-scoped | 2024-10-11 | FTC-VT-PER-HA Violation Issued-Failure To File 2023 Periodic Inspection Affirmation of Correction | - | Dismissed | - | 855j-jady |
| Safety context recordbuilding-scoped | 2024-10-11 | FTC-VT-PER-HA Violation Issued-Failure To File 2023 Periodic Inspection Affirmation of Correction | - | Dismissed | - | 855j-jady |
| Safety context recordbuilding-scoped | 2024-10-11 | FTC-VT-CAT1-HA Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction | - | Dismissed | - | 855j-jady |
| Safety context recordbuilding-scoped | 2024-10-11 | FTC-VT-PER-HA Violation Issued-Failure To File 2023 Periodic Inspection Affirmation of Correction | - | Dismissed | - | 855j-jady |
| Safety context recordbuilding-scoped | 2024-10-11 | FTC-VT-PER-HA Violation Issued-Failure To File 2023 Periodic Inspection Affirmation of Correction | - | Dismissed | - | 855j-jady |
| Safety context recordbuilding-scoped | 2024-10-11 | FTC-VT-PER-HA Violation Issued-Failure To File 2023 Periodic Inspection Affirmation of Correction | - | Dismissed | - | 855j-jady |
| Safety context recordbuilding-scoped | 2024-10-11 | FTC-VT-PER-HA Violation Issued-Failure To File 2023 Periodic Inspection Affirmation of Correction | - | Dismissed | - | 855j-jady |
| Safety context recordbuilding-scoped | 2024-10-11 | FTC-VT-PER-HA Violation Issued-Failure To File 2023 Periodic Inspection Affirmation of Correction | - | Dismissed | - | 855j-jady |
| Safety context recordbuilding-scoped | 2024-09-11 | FTF-VT-PER-HA Violation Issued-Failure To File 2023 Periodic Inspection Report | - | Dismissed | - | 855j-jady |
| DOB violation filedbuilding-scoped | 2024-06-23 | EARCX-FAILURE TO SUBMIT EER NONE FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2023) | - | V*-DOB VIOLATION - DISMISSED | - | 3h2n-5cm9 |
| Safety context recordbuilding-scoped | 2024-06-23 | FTF-EN-EARCX | - | Dismissed | - | 855j-jady |
Records are the union of DOB Violations (3h2n-5cm9), ECB (6bgk-3dad), Safety Violations (855j-jady), OATH Hearings (jz4z-kudi), and OATH Trials (y3hw-z6bm) that we could link back to this BBL via BIN or address parsing. Events not tagged LL97-specific are shown as building-scoped context. See methodology · enforcement linking.
Fields we cannot show here (internal DOB data not yet public)
Processing lifecycleDOB's internal BEAM system tracks per-building compliance stages, RCE / decarbonization plans, and mitigation credits. Those fields are not yet published as an open dataset. When DOB releases them, this product will show them here without a schema migration. Until then, the following are known gaps for this building:
- Simulated · internal DOB data not yet publicAssessed penalty (vs theoretical)Actual penalty DOB assessed against a building, distinct from the theoretical over-cap exposure computed from LL84 emissions.Best-effort shadow field:
ecb_summons_issuedPublic release status: announced_not_yet_released - Simulated · internal DOB data not yet publicAudit assignmentBuildings selected by DOB for LL97 filing audit and the audit stage.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicAudit outcomeResult of an LL97 audit (accepted / correction ordered / penalty referred).Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicExtension flagWhether a per-building filing was accepted under a filing extension (June 30 grace or BEAM extension to August 29).Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicFiling received dateTimestamp DOB received a per-building LL97 compliance filing.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicGood-faith effort applicationWhether an owner has applied for a good-faith effort determination and its status.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicMediated resolution applicationApplication for the LL97 mediated resolution process and its outcome.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicNotice of deficiency statusWhether a notice of deficiency has been issued for a building and its current stage.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicPer-building filing statusFiling status for each covered BBL/BIN combination (filed / late / non-filed / exempt) as tracked in DOB's BEAM system.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicPre-OATH correspondenceDOB correspondence with owners before an OATH matter is opened (notice of deficiency, cure letters).Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicRDP attestationRegistered Design Professional attestation attached to each per-building compliance filing.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicRECs / offsets claimedRenewable Energy Credits and beneficial-use offsets claimed to reduce reported emissions.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet public60-day cure windowThe 60-day cure window state for a building under LL97 enforcement (open / cured / expired).Public release status: announced_not_yet_released