NYC Prototypes
Skip to main content
BBL 4030860040 · BIN 4072164 · Queens · Block 03086, Lot 0040

65-61 SAUNDERS STREET

Article 321Pathway source: CBL PDF row · CP3_article_321_one_timeCBL revision date 2026-06-16Open CBL source PDF
Buildings on lot 1
← Buildings

Article 321 · prescriptive compliance pathway

This building is on the Article 321 pathway. Article 321 does not use a numerical cap; compliance is demonstrated via the prescriptive measures package (per methodology · Article 321), which DOB does not currently publish per building. Cap, delta, and penalty columns are intentionally suppressed on Article 321 rows in this product.

2024-29
Occupancy: R-2
GFA: 209,440 sqft
Methodology: v1.0
2030-34
Occupancy: R-2
GFA: 209,440 sqft
Methodology: v1.0

LL84 GHG emissions history

Actual tCO2e reported to LL84 by report year. Each bar links to the raw LL84 row identifier under the chart for auditability.

2021918.5 tCO2e2022896.2 tCO2e2023914.9 tCO2e2024886.4 tCO2e
YearProperty typeGHGProperty GFASite EUISource EUIES scoreSource
2021Multifamily Housing918.5 tCO2e205,632 sqft78.6107.4657x5e-2fxh / 20238974
2022Multifamily Housing896.2 tCO2e205,632 sqft74.2101.1755zyy-y8am / 20238974
2023Multifamily Housing914.9 tCO2e209,440 sqft69.794.1755zyy-y8am / 20238974
2024Multifamily Housing886.4 tCO2e209,440 sqft66.189.8835zyy-y8am / 20238974

Enforcement events (all DOB + ECB + OATH data cross-linked to this BBL)

Open on enforcement page →
0 LL97-specific events · 15 building-scoped context events.
DOB violation filed0 LL97 · 6 scoped
ECB summons issued0 LL97 · 2 scoped
Safety context record0 LL97 · 7 scoped
StageEvent dateViolationSeverityStatusPenaltySource
ECB summons issuedbuilding-scoped2025-11-20
Unknown
ECB #35718572X
CLASS - 2RESOLVE$06bgk-3dad
Safety context recordbuilding-scoped2025-10-10
FTC-VT-PER-CO
Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction
-Dismissed-855j-jady
Safety context recordbuilding-scoped2025-10-10
FTC-VT-PER-CO
Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction
-Dismissed-855j-jady
Safety context recordbuilding-scoped2025-10-10
FTC-VT-PER-CO
Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction
-Dismissed-855j-jady
Safety context recordbuilding-scoped2024-12-31
FTC-PS-UNSAFE
Unsafe report of parking structures filed.
-Dismissed-855j-jady
DOB violation filedbuilding-scoped2024-11-06
C-CONSTRUCTION OTHER OPTIONAL
FAILURE TO MAINTAIN.OBSRVD THAT THE CNCRTE COVER ON SUBCELLRLVL FNDTN WALL@EXP3(REAR)HAS BEEN EXCESSIVELY RMVD,CONTRARYY TO DWGS FILED UNDR JOB#00957589 THAT SPECIFIED A MAX 8FT WALL LENGTH OF SEQ.IMMEDIATELY COMPLY WITH COMMISSIONER'S ORDER 343714 9060624FEU40602ZT)TO REPAIR THEBUILDING UNDER PERMIT
-V*-DOB VIOLATION - DISMISSED-3h2n-5cm9
Safety context recordbuilding-scoped2024-10-11
FTC-VT-PER-CO
Violation Issued-Failure To File 2023 Periodic Inspection Affirmation of Correction
-Dismissed-855j-jady
Safety context recordbuilding-scoped2024-10-11
FTC-VT-PER-CO
Violation Issued-Failure To File 2023 Periodic Inspection Affirmation of Correction
-Dismissed-855j-jady
Safety context recordbuilding-scoped2024-10-11
FTC-VT-PER-CO
Violation Issued-Failure To File 2023 Periodic Inspection Affirmation of Correction
-Dismissed-855j-jady
DOB violation filedbuilding-scoped2024-06-12
C-CONSTRUCTION OTHER OPTIONAL
EMERGENCY WORK.OBSRVD CNCRTE COVER ON THE SUBCELLAR LEVEL CNCRTE FNDTN WALL@EXP3(RERA)HAD BEEN EXCESSIVELY RMVD,CNTRARY TO THE DWGS FIXED UNDR JOB#Q00957589 THAT SPECIFIED A MAX 8FT WALL LENGTH.IMMEDIATELY COMPLY WITH COMMISSIONER'S ORDER 3343713 (060624FEU01ZT)TO IMMEDIATELY INSTALL TEMP SHORNG&BRACNG
-V*-DOB VIOLATION - DISMISSED-3h2n-5cm9
DOB violation filedbuilding-scoped2024-06-12
IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL
SHORE FOUNDATION WALL @ EXPO#3
-V*-DOB VIOLATION - DISMISSED-3h2n-5cm9
ECB summons issuedbuilding-scoped2024-06-11
Construction
28-105.12.2 WRK DOESN'T CONFORM TO APPROV DOCS AND/OR APPROV AMENDMENTS
ECB #39116477P
CLASS - 2RESOLVE$1,2506bgk-3dad
DOB violation filedbuilding-scoped2024-06-07
C-CONSTRUCTION OTHER OPTIONAL
EMERGENCY WORK ORDER.AS NOTED ON AN ACTIVE PARKING STRUCTURE OF 2 LVS BELOW A 8 FL BUILDING,OBSERVED SPALLED CONCRETE,EXPOSED REBAR ON SUBCE LLAR LEVE AT NORTH SIDE WALL ALMOST THROUGHOUT.REMEDY:OWNER IS TO RETA IN A NYS REG DESIGN PROFESSIONAL TO DIRECT AND SUPERVISE THE INSTALLAT ION OF SAFETY MEASURES.ALL WORK TO BE CONDUCTED FULL TIME
-V*-DOB VIOLATION - DISMISSED-3h2n-5cm9
DOB violation filedbuilding-scoped2024-06-06
C-CONSTRUCTION OTHER OPTIONAL
FAILURE TO MAINTAIN.OBSRVD THAT THE CNCRTE COVER ON SUBCELLARLVL FDTN WALL@EXP3(REAR)HAS BEEN EXCESSIVELY RMVD,CONTRARY TO DWGS FILED UNDR JOB#Q00957589 THAT SPECIFIED A MAX 8FT WALL LENGTH OF SEQ.VACATE ENTIRE PARKNG GARAGE ON THE CELLAR&SUBCELLAR LVL.OWNR NYSPE TO EVAL ENT PRKNG GARAGE,DETERMINE THE STRCTRL STBILITY
-V*-DOB VIOLATION - DISMISSED-3h2n-5cm9
DOB violation filedbuilding-scoped2024-06-06
C-CONSTRUCTION OTHER OPTIONAL
EMERGENCY WORK.OBSRVD CNCRTE COVER ON THE SUBCELLAR LEVEL CNCRTE FNDTN WALL@EXP3(REAR)HAD BEEN EXCESSIVELY RMVD,CNTRARY TO THE DWGS FIXED UNDR JOB #Q00957589 THAT SPECIFIED A MAX 8FT WALL LENGTH.1.OWNR TO IMMED RTAIN A NYSPE&DOB-REG CNTRCTR TO PERFRM THE FOLLWNG WRKS,2.PRVDE TEMP SHORNG@ALL BEAMS BEAMING ON AFFCTD
-V*-DOB VIOLATION - DISMISSED-3h2n-5cm9

Records are the union of DOB Violations (3h2n-5cm9), ECB (6bgk-3dad), Safety Violations (855j-jady), OATH Hearings (jz4z-kudi), and OATH Trials (y3hw-z6bm) that we could link back to this BBL via BIN or address parsing. Events not tagged LL97-specific are shown as building-scoped context. See methodology · enforcement linking.

Fields we cannot show here (internal DOB data not yet public)

Processing lifecycle

DOB's internal BEAM system tracks per-building compliance stages, RCE / decarbonization plans, and mitigation credits. Those fields are not yet published as an open dataset. When DOB releases them, this product will show them here without a schema migration. Until then, the following are known gaps for this building:

  • Assessed penalty (vs theoretical)
    Actual penalty DOB assessed against a building, distinct from the theoretical over-cap exposure computed from LL84 emissions.
    Simulated · internal DOB data not yet public
    Best-effort shadow field: ecb_summons_issued
    Public release status: announced_not_yet_released
  • Audit assignment
    Buildings selected by DOB for LL97 filing audit and the audit stage.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Audit outcome
    Result of an LL97 audit (accepted / correction ordered / penalty referred).
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Extension flag
    Whether a per-building filing was accepted under a filing extension (June 30 grace or BEAM extension to August 29).
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Filing received date
    Timestamp DOB received a per-building LL97 compliance filing.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Good-faith effort application
    Whether an owner has applied for a good-faith effort determination and its status.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Mediated resolution application
    Application for the LL97 mediated resolution process and its outcome.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Notice of deficiency status
    Whether a notice of deficiency has been issued for a building and its current stage.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Per-building filing status
    Filing status for each covered BBL/BIN combination (filed / late / non-filed / exempt) as tracked in DOB's BEAM system.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Pre-OATH correspondence
    DOB correspondence with owners before an OATH matter is opened (notice of deficiency, cure letters).
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • RDP attestation
    Registered Design Professional attestation attached to each per-building compliance filing.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • RECs / offsets claimed
    Renewable Energy Credits and beneficial-use offsets claimed to reduce reported emissions.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • 60-day cure window
    The 60-day cure window state for a building under LL97 enforcement (open / cured / expired).
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
Every number on this page traces back to a Socrata dataset row or a CBL PDF revision. Where DOB does not publish a computable field (pathway, internal BEAM stage, compliance decision), we say so on the record instead of hiding the gap. See methodology.