Article 321Pathway source: CBL PDF row · CP3_article_321_one_timeCBL revision date 2026-06-16Open CBL source PDF
Buildings on lot 1
← Buildings

Article 321 · prescriptive compliance pathway

This building is on the Article 321 pathway. Article 321 does not use a numerical cap; compliance is demonstrated via the prescriptive measures package (per methodology · Article 321), which DOB does not currently publish per building. Cap, delta, and penalty columns are intentionally suppressed on Article 321 rows in this product.

2024-29
Occupancy: R-2
GFA: 40,800 sqft
Methodology: v1.0
2030-34
Occupancy: R-2
GFA: 40,800 sqft
Methodology: v1.0

LL84 GHG emissions history

Actual tCO2e reported to LL84 by report year. Each bar links to the raw LL84 row identifier under the chart for auditability.

2021230 tCO2e2022222 tCO2e2023220.4 tCO2e2024215.4 tCO2e
YearProperty typeGHGProperty GFASite EUISource EUIES scoreSource
2021Multifamily Housing230 tCO2e40,800 sqft97.1142.7177x5e-2fxh / 6689787
2022Multifamily Housing222 tCO2e40,800 sqft94.9121.9415zyy-y8am / 6689787
2023Multifamily Housing220.4 tCO2e40,800 sqft88.5115.0405zyy-y8am / 6689787
2024Multifamily Housing215.4 tCO2e40,800 sqft84.6111.0455zyy-y8am / 6689787

Enforcement events (all DOB + ECB + OATH data cross-linked to this BBL)

Open on enforcement page →
0 LL97-specific events · 7 building-scoped context events.
DOB violation filed0 LL97 · 2 scoped
ECB summons issued0 LL97 · 4 scoped
Safety context record0 LL97 · 1 scoped
StageEvent dateViolationSeverityStatusPenaltySource
Safety context recordbuilding-scoped2026-03-17
FTC-AEU-HAZ
-Active-855j-jady
ECB summons issuedbuilding-scoped2026-01-09
Cranes and Derricks
BC 3314.1.1 & 27-1050.1 FAILED TO NOTIFY DEPARTMENT/OBTAIN PERMIT PRIOR TO USE/INST. OFF C-HOO
ECB #39548972L
CLASS - 2ACTIVE$2,5006bgk-3dad
ECB summons issuedbuilding-scoped2026-01-09
Construction
BC 3301.7 (2014 CODE) FAILURE TO MAINTAIN/DISPLAY ON SITE DOCUMENTS REQUIRED BY BC CHAPTER 3
ECB #39548973N
CLASS - 2ACTIVE$1,2506bgk-3dad
ECB summons issuedbuilding-scoped2026-01-07
Construction
28-201.1 UNLAWFUL ACTS. FAILURE TO COMPLY WITH AN ORDER OF THE COMMISSIONER
ECB #35719017L
CLASS - 1ACTIVE$6,2506bgk-3dad
DOB violation filedbuilding-scoped2025-10-22
C-CONSTRUCTION OTHER OPTIONAL
FTC W/COMMISSIONER'S ORDER CONTROL#348273 VIO#060325PI41101HZ DATED 06/03/25 REQUIRING OWNER TO PROVIDE A CORRECTIVE ACTION PLAN BY 7/4/25 SIGNED/OFF BY 08/04/25. AS OF 10/22/25 A CAP&EVIDENCE OF COMPLETED REPAIR WORK WAS NOT REC'D. IMMED COMPLY W/COMMISSIONER'S ORDER CONTROL #348873 VIO#060625PI41101HZ TO PROVIDE A CORRECTION ACTION PLAN
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9
DOB violation filedbuilding-scoped2025-06-03
C-CONSTRUCTION OTHER OPTIONAL
CORRECTIVE ACTION PLAN REQ'D. OBSVD HAZ CONDITION-CRACKED MASONRY STUCCO ON THE CHIMNEY APPROX 40FT WITH 1/2 INCH SEPARATION ABOVE COURTYARD, MASONRY VERT CRACKED @ BLD OUTSIDE CORNER-EXP03 & 04 1/2 GAP SEPARATING ROW OF BRICKS. OWNER TO IMMED RETAIN REG DESIGN PROF TO EVAL ENTIRE BLDG AND SUBMIT CORRECTIVE ACTION PLAN WITHIN 30 DAYS
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9
ECB summons issuedbuilding-scoped2025-06-03
Construction
28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER
ECB #35683166N
CLASS - 1ACTIVE$12,5006bgk-3dad

Records are the union of DOB Violations (3h2n-5cm9), ECB (6bgk-3dad), Safety Violations (855j-jady), OATH Hearings (jz4z-kudi), and OATH Trials (y3hw-z6bm) that we could link back to this BBL via BIN or address parsing. Events not tagged LL97-specific are shown as building-scoped context. See methodology · enforcement linking.

Fields we cannot show here (internal DOB data not yet public)

Processing lifecycle

DOB's internal BEAM system tracks per-building compliance stages, RCE / decarbonization plans, and mitigation credits. Those fields are not yet published as an open dataset. When DOB releases them, this product will show them here without a schema migration. Until then, the following are known gaps for this building:

  • Assessed penalty (vs theoretical)
    Actual penalty DOB assessed against a building, distinct from the theoretical over-cap exposure computed from LL84 emissions.
    Simulated · internal DOB data not yet public
    Best-effort shadow field: ecb_summons_issued
    Public release status: announced_not_yet_released
  • Audit assignment
    Buildings selected by DOB for LL97 filing audit and the audit stage.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Audit outcome
    Result of an LL97 audit (accepted / correction ordered / penalty referred).
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Extension flag
    Whether a per-building filing was accepted under a filing extension (June 30 grace or BEAM extension to August 29).
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Filing received date
    Timestamp DOB received a per-building LL97 compliance filing.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Good-faith effort application
    Whether an owner has applied for a good-faith effort determination and its status.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Mediated resolution application
    Application for the LL97 mediated resolution process and its outcome.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Notice of deficiency status
    Whether a notice of deficiency has been issued for a building and its current stage.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Per-building filing status
    Filing status for each covered BBL/BIN combination (filed / late / non-filed / exempt) as tracked in DOB's BEAM system.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Pre-OATH correspondence
    DOB correspondence with owners before an OATH matter is opened (notice of deficiency, cure letters).
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • RDP attestation
    Registered Design Professional attestation attached to each per-building compliance filing.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • RECs / offsets claimed
    Renewable Energy Credits and beneficial-use offsets claimed to reduce reported emissions.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • 60-day cure window
    The 60-day cure window state for a building under LL97 enforcement (open / cured / expired).
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
Every number on this page traces back to a Socrata dataset row or a CBL PDF revision. Where DOB does not publish a computable field (pathway, internal BEAM stage, compliance decision), we say so on the record instead of hiding the gap. See methodology.