NYC Prototypes
Skip to main content
BBL 4096940017 · BIN 4207107 · Queens · Block 09694, Lot 0017

148-18 HILLSIDE AVENUE

Article 320Pathway source: CBL PDF row · CP0_article_320_2024CBL revision date 2026-06-16Open CBL source PDF
Buildings on lot 1
← Buildings

Article 320 · numerical caps & computed exposure

How this is computed
PeriodOccupancyGFACapActualDeltaEst. penaltyStatusMethodology
2024-29------
UnresolvedEJ · PEJA fallback
no_ll84_row
v1.0
2030-34------
UnresolvedEJ · PEJA fallback
no_ll84_row
v1.0

Cap = Σ (occupancy_coefficient × gross_floor_area) using DOB LL97 rules; actual GHG is the most recent LL84 filing. Delta is positive when actual exceeds cap. Estimated penalty is DOB's public $268/tCO2e × delta with a 30-day grace applied via penalty_estimate_usd.

Enforcement events (all DOB + ECB + OATH data cross-linked to this BBL)

Open on enforcement page →
0 LL97-specific events · 21 building-scoped context events.
DOB violation filed0 LL97 · 1 scoped
ECB summons issued0 LL97 · 17 scoped
Safety context record0 LL97 · 3 scoped
StageEvent dateViolationSeverityStatusPenaltySource
ECB summons issuedbuilding-scoped2026-06-11
Unknown
ECB #39555481M
CLASS - 2ACTIVE$2,5006bgk-3dad
ECB summons issuedbuilding-scoped2026-03-25
Construction
BC 3303.4 & 27-1018 FAILURE TO MAINTAIN ADEQUATE HOUSEKEEPING PER SECTION REQUIREMENTS
ECB #39552186X
CLASS - 1RESOLVE$2,5006bgk-3dad
Safety context recordbuilding-scoped2026-03-17
FTC-AEU-HAZ
-Dismissed-855j-jady
ECB summons issuedbuilding-scoped2026-03-17
Unknown
BC 3301.13.7 THROUGH BC 3301.13.13 CONSTRUCTION SUPERINTENDENT FAILED TO PERFORM DUTIES PER CODE.
ECB #39551869K
CLASS - 2RESOLVE$5,0006bgk-3dad
ECB summons issuedbuilding-scoped2026-02-27
Construction
BC 3307.6,27-1021 SIDEWALK SHED DOES NOT MEET CODE SPECIFICATIONS
ECB #39551069M
CLASS - 2RESOLVE$2,4006bgk-3dad
ECB summons issuedbuilding-scoped2026-02-27
Construction
BC 3303.4,27-1018 FAIL TO MAINTAIN ADEQUATE HSEKEEPING PER SECTIONS REQUIREMENTS
ECB #39551068K
CLASS - 2RESOLVE$06bgk-3dad
ECB summons issuedbuilding-scoped2026-02-22
Unknown
ECB #39550773L
CLASS - 1RESOLVE$5,0006bgk-3dad
ECB summons issuedbuilding-scoped2026-02-22
Unknown
ECB #39550772J
CLASS - 2RESOLVE$2,5006bgk-3dad
ECB summons issuedbuilding-scoped2026-02-01
Unknown
ECB #39549758P
CLASS - 1ACTIVE$5,0006bgk-3dad
ECB summons issuedbuilding-scoped2025-12-21
Unknown
ECB #39548226J
CLASS - 2RESOLVE$2,5306bgk-3dad
ECB summons issuedbuilding-scoped2025-12-21
Unknown
ECB #39548225H
CLASS - 1RESOLVE$5,0306bgk-3dad
Safety context recordbuilding-scoped2025-01-31
FTF-PL-PER
Cycle 1, Sub-cycle D (premises is in Community District 12)
-Active-855j-jady
Safety context recordbuilding-scoped2024-10-30
FTC-AEU-HAZ
-Dismissed-855j-jady
DOB violation filedbuilding-scoped2024-10-30
AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
-V*-DOB VIOLATION - DISMISSED-3h2n-5cm9
ECB summons issuedbuilding-scoped2024-08-27
Unknown
ECB #39531856N
CLASS - 2RESOLVE$2,5006bgk-3dad
ECB summons issuedbuilding-scoped2024-08-27
Construction
BC 3307.6,27-1021 SIDEWALK SHED DOES NOT MEET CODE SPECIFICATIONS
ECB #39531859Z
CLASS - 1RESOLVE$2,4006bgk-3dad
ECB summons issuedbuilding-scoped2024-08-27
Construction
AC 1RCNY-MISC,RS-MISC MISCELLANEOUS VIOLATIONS
ECB #39531857P
CLASS - 2RESOLVE$06bgk-3dad
ECB summons issuedbuilding-scoped2024-08-27
Unknown
ECB #39531858R
CLASS - 1RESOLVE$2,5006bgk-3dad
ECB summons issuedbuilding-scoped2024-08-27
Unknown
ECB #39531854J
CLASS - 2RESOLVE$2,5006bgk-3dad
ECB summons issuedbuilding-scoped2024-08-27
Unknown
ECB #39531855L
CLASS - 1RESOLVE$5,0006bgk-3dad
ECB summons issuedbuilding-scoped2024-02-06
Construction
BC 3301.9,27-10009(C) FAIL TO PROVIDE/POST SIGN(S) AT JB SITE PURSUANT TO SUBSEC
ECB #39525394R
CLASS - 2RESOLVE$3,1256bgk-3dad

Records are the union of DOB Violations (3h2n-5cm9), ECB (6bgk-3dad), Safety Violations (855j-jady), OATH Hearings (jz4z-kudi), and OATH Trials (y3hw-z6bm) that we could link back to this BBL via BIN or address parsing. Events not tagged LL97-specific are shown as building-scoped context. See methodology · enforcement linking.

Fields we cannot show here (internal DOB data not yet public)

Processing lifecycle

DOB's internal BEAM system tracks per-building compliance stages, RCE / decarbonization plans, and mitigation credits. Those fields are not yet published as an open dataset. When DOB releases them, this product will show them here without a schema migration. Until then, the following are known gaps for this building:

  • Assessed penalty (vs theoretical)
    Actual penalty DOB assessed against a building, distinct from the theoretical over-cap exposure computed from LL84 emissions.
    Simulated · internal DOB data not yet public
    Best-effort shadow field: ecb_summons_issued
    Public release status: announced_not_yet_released
  • Audit assignment
    Buildings selected by DOB for LL97 filing audit and the audit stage.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Audit outcome
    Result of an LL97 audit (accepted / correction ordered / penalty referred).
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Extension flag
    Whether a per-building filing was accepted under a filing extension (June 30 grace or BEAM extension to August 29).
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Filing received date
    Timestamp DOB received a per-building LL97 compliance filing.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Good-faith effort application
    Whether an owner has applied for a good-faith effort determination and its status.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Mediated resolution application
    Application for the LL97 mediated resolution process and its outcome.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Notice of deficiency status
    Whether a notice of deficiency has been issued for a building and its current stage.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Per-building filing status
    Filing status for each covered BBL/BIN combination (filed / late / non-filed / exempt) as tracked in DOB's BEAM system.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Pre-OATH correspondence
    DOB correspondence with owners before an OATH matter is opened (notice of deficiency, cure letters).
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • RDP attestation
    Registered Design Professional attestation attached to each per-building compliance filing.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • RECs / offsets claimed
    Renewable Energy Credits and beneficial-use offsets claimed to reduce reported emissions.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • 60-day cure window
    The 60-day cure window state for a building under LL97 enforcement (open / cured / expired).
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
Every number on this page traces back to a Socrata dataset row or a CBL PDF revision. Where DOB does not publish a computable field (pathway, internal BEAM stage, compliance decision), we say so on the record instead of hiding the gap. See methodology.