NYC Prototypes
Skip to main content
BBL 4097570023 · BIN 4208850 · Queens · Block 09757, Lot 0023

90-04 160 STREET

Article 320Pathway source: CBL PDF row · CP0_article_320_2024CBL revision date 2026-06-16Open CBL source PDF
Buildings on lot 1
← Buildings

Article 320 · numerical caps & computed exposure

How this is computed
PeriodOccupancyGFACapActualDeltaEst. penaltyStatusMethodology
2024-29B(high)61,762 sqft522.5 tCO2e168.3 tCO2e-354.2-
Under capEJ · PEJA fallback
v1.0
2030-34B(high)61,762 sqft279.8 tCO2e168.3 tCO2e-111.4-
Under capEJ · PEJA fallback
v1.0

Cap = Σ (occupancy_coefficient × gross_floor_area) using DOB LL97 rules; actual GHG is the most recent LL84 filing. Delta is positive when actual exceeds cap. Estimated penalty is DOB's public $268/tCO2e × delta with a 30-day grace applied via penalty_estimate_usd.

LL84 GHG emissions history

Actual tCO2e reported to LL84 by report year. Each bar links to the raw LL84 row identifier under the chart for auditability.

2021328.8 tCO2e2022338.2 tCO2e20230 tCO2e2024168.3 tCO2e
YearProperty typeGHGProperty GFASite EUISource EUIES scoreSource
2021Office328.8 tCO2e63,492 sqft76.3142.7597x5e-2fxh / 2812752
2022Office338.2 tCO2e63,492 sqft79.3145.4595zyy-y8am / 2812752
2023Office0 tCO2e61,762 sqft---5zyy-y8am / 27488923
2024Office168.3 tCO2e61,762 sqft23.766.3945zyy-y8am / 27488923

Enforcement events (all DOB + ECB + OATH data cross-linked to this BBL)

Open on enforcement page →
0 LL97-specific events · 9 building-scoped context events.
DOB violation filed0 LL97 · 4 scoped
ECB summons issued0 LL97 · 4 scoped
Safety context record0 LL97 · 1 scoped
StageEvent dateViolationSeverityStatusPenaltySource
ECB summons issuedbuilding-scoped2026-04-20
Local Law
28-302.5 FAILURE TO FILE AN AMENDED REPORT ACCEPTABLE TO THIS DEPARTMENT INDICA
ECB #37036443Y
CLASS - 2ACTIVE$6,2506bgk-3dad
Safety context recordbuilding-scoped2026-03-17
FTC-AEU-HAZ
-Dismissed-855j-jady
DOB violation filedbuilding-scoped2025-04-28
C-CONSTRUCTION OTHER OPTIONAL
FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER.NOTE OBSERVED AT EXP1 3RD FLOOR CRACK WINDOW.AT EXP4 OBSERVED CRACKED BROKEN WINDOW AT EXP2 OBSERVED MAJOR STEP CRACKS AT PARAPET LEVEL.OBSERVED DAMAGED S PALLING DAMAGED BALCONIES IN MULTIPLE LOCATIONS.REMEDY:REPAIR AND/OR R EPLACE
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9
DOB violation filedbuilding-scoped2025-01-10
C-CONSTRUCTION OTHER OPTIONAL
PARTIAL VACATE ORDER DUE TO LARGE VERTICAL BRICK CRACKING/STEP CRACKIN G AT MULTIPLE LOCATIONS AND CRACKED/SPALLING SPALLED STUCCO ON CONCRET E BALCONY SLABS AT EXP2 SOUTH ELEVATION.REMEDY:VACATE ENTIRE SETBACK AND COURTYARD AT EXP2 SOUTH ELEVATION
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9
DOB violation filedbuilding-scoped2025-01-06
C-CONSTRUCTION OTHER OPTIONAL
EWO.HAZARD CONDIT OF FIREESCAPE BALCONIES @ EXP2 S ELEV. REMDY:IMMEDLY REPAIR FIREESCAPE BALCONIES.IMMEDLY PROVIDE AN APPROPRITE # CERTIFIED FIREGUARDS @ LOCAT 24/7 UNTIL REPAIRS ARE COMPLETE & SIGNED BY PE. PE TO PROVIDE INSPECTION REPORT ON ALL FIRE BALCONIES BEFORE WORK BEGIN REPORT SUBMIT TO FACADE@BUILDING.NYC.GOV. UNDR SUPERV OF NYS LICEN PE
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9
ECB summons issuedbuilding-scoped2025-01-06
Construction
28-302.1 FAILURE TO MAINTAIN BLDG WALL(S) OR APPURTENANCES
ECB #35689606P
CLASS - 1RESOLVE$2,5006bgk-3dad
DOB violation filedbuilding-scoped2024-11-07
C-CONSTRUCTION OTHER OPTIONAL
FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. OBSERVED AT EXPOSURE 4 SOUTH ELEVATION CRACK DETERIORATION AT 8TH FL EAST REMEDY: MAINTIAN BUILDING REPAIR AND/OR REPLACE
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9
ECB summons issuedbuilding-scoped2024-04-11
Local Law
28-302.4 FAILURE TO SUBMIT A REQUIRED REPORT OF CRITICAL EXAMINATION DOCUMENTIN
ECB #37028191R
CLASS - 2ACTIVE$1,2506bgk-3dad
ECB summons issuedbuilding-scoped2024-01-16
Local Law
28-302.5 FAILURE TO FILE AN AMENDED REPORT ACCEPTABLE TO THIS DEPARTMENT INDICA
ECB #37026135N
CLASS - 2ACTIVE$3,1256bgk-3dad

Records are the union of DOB Violations (3h2n-5cm9), ECB (6bgk-3dad), Safety Violations (855j-jady), OATH Hearings (jz4z-kudi), and OATH Trials (y3hw-z6bm) that we could link back to this BBL via BIN or address parsing. Events not tagged LL97-specific are shown as building-scoped context. See methodology · enforcement linking.

Fields we cannot show here (internal DOB data not yet public)

Processing lifecycle

DOB's internal BEAM system tracks per-building compliance stages, RCE / decarbonization plans, and mitigation credits. Those fields are not yet published as an open dataset. When DOB releases them, this product will show them here without a schema migration. Until then, the following are known gaps for this building:

  • Assessed penalty (vs theoretical)
    Actual penalty DOB assessed against a building, distinct from the theoretical over-cap exposure computed from LL84 emissions.
    Simulated · internal DOB data not yet public
    Best-effort shadow field: ecb_summons_issued
    Public release status: announced_not_yet_released
  • Audit assignment
    Buildings selected by DOB for LL97 filing audit and the audit stage.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Audit outcome
    Result of an LL97 audit (accepted / correction ordered / penalty referred).
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Extension flag
    Whether a per-building filing was accepted under a filing extension (June 30 grace or BEAM extension to August 29).
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Filing received date
    Timestamp DOB received a per-building LL97 compliance filing.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Good-faith effort application
    Whether an owner has applied for a good-faith effort determination and its status.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Mediated resolution application
    Application for the LL97 mediated resolution process and its outcome.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Notice of deficiency status
    Whether a notice of deficiency has been issued for a building and its current stage.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Per-building filing status
    Filing status for each covered BBL/BIN combination (filed / late / non-filed / exempt) as tracked in DOB's BEAM system.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Pre-OATH correspondence
    DOB correspondence with owners before an OATH matter is opened (notice of deficiency, cure letters).
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • RDP attestation
    Registered Design Professional attestation attached to each per-building compliance filing.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • RECs / offsets claimed
    Renewable Energy Credits and beneficial-use offsets claimed to reduce reported emissions.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • 60-day cure window
    The 60-day cure window state for a building under LL97 enforcement (open / cured / expired).
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
Every number on this page traces back to a Socrata dataset row or a CBL PDF revision. Where DOB does not publish a computable field (pathway, internal BEAM stage, compliance decision), we say so on the record instead of hiding the gap. See methodology.