90-04 160 STREET
CP0_article_320_2024CBL revision date 2026-06-16Open CBL source PDFArticle 320 · numerical caps & computed exposure
How this is computed| Period | Occupancy | GFA | Cap | Actual | Delta | Est. penalty | Status | Methodology |
|---|---|---|---|---|---|---|---|---|
| 2024-29 | B(high) | 61,762 sqft | 522.5 tCO2e | 168.3 tCO2e | -354.2 | - | Under capEJ · PEJA fallback | v1.0 |
| 2030-34 | B(high) | 61,762 sqft | 279.8 tCO2e | 168.3 tCO2e | -111.4 | - | Under capEJ · PEJA fallback | v1.0 |
Cap = Σ (occupancy_coefficient × gross_floor_area) using DOB LL97 rules; actual GHG is the most recent LL84 filing. Delta is positive when actual exceeds cap. Estimated penalty is DOB's public $268/tCO2e × delta with a 30-day grace applied via penalty_estimate_usd.
LL84 GHG emissions history
Actual tCO2e reported to LL84 by report year. Each bar links to the raw LL84 row identifier under the chart for auditability.
| Year | Property type | GHG | Property GFA | Site EUI | Source EUI | ES score | Source |
|---|---|---|---|---|---|---|---|
| 2021 | Office | 328.8 tCO2e | 63,492 sqft | 76.3 | 142.7 | 59 | 7x5e-2fxh / 2812752 |
| 2022 | Office | 338.2 tCO2e | 63,492 sqft | 79.3 | 145.4 | 59 | 5zyy-y8am / 2812752 |
| 2023 | Office | 0 tCO2e | 61,762 sqft | - | - | - | 5zyy-y8am / 27488923 |
| 2024 | Office | 168.3 tCO2e | 61,762 sqft | 23.7 | 66.3 | 94 | 5zyy-y8am / 27488923 |
Enforcement events (all DOB + ECB + OATH data cross-linked to this BBL)
Open on enforcement page →| Stage | Event date | Violation | Severity | Status | Penalty | Source |
|---|---|---|---|---|---|---|
| ECB summons issuedbuilding-scoped | 2026-04-20 | Local Law 28-302.5 FAILURE TO FILE AN AMENDED REPORT ACCEPTABLE TO THIS DEPARTMENT INDICA ECB #37036443Y | CLASS - 2 | ACTIVE | $6,250 | 6bgk-3dad |
| Safety context recordbuilding-scoped | 2026-03-17 | FTC-AEU-HAZ | - | Dismissed | - | 855j-jady |
| DOB violation filedbuilding-scoped | 2025-04-28 | C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER.NOTE OBSERVED AT EXP1 3RD FLOOR CRACK WINDOW.AT EXP4 OBSERVED CRACKED BROKEN WINDOW AT EXP2 OBSERVED MAJOR STEP CRACKS AT PARAPET LEVEL.OBSERVED DAMAGED S PALLING DAMAGED BALCONIES IN MULTIPLE LOCATIONS.REMEDY:REPAIR AND/OR R EPLACE | - | V-DOB VIOLATION - ACTIVE | - | 3h2n-5cm9 |
| DOB violation filedbuilding-scoped | 2025-01-10 | C-CONSTRUCTION OTHER OPTIONAL PARTIAL VACATE ORDER DUE TO LARGE VERTICAL BRICK CRACKING/STEP CRACKIN G AT MULTIPLE LOCATIONS AND CRACKED/SPALLING SPALLED STUCCO ON CONCRET E BALCONY SLABS AT EXP2 SOUTH ELEVATION.REMEDY:VACATE ENTIRE SETBACK AND COURTYARD AT EXP2 SOUTH ELEVATION | - | V-DOB VIOLATION - ACTIVE | - | 3h2n-5cm9 |
| DOB violation filedbuilding-scoped | 2025-01-06 | C-CONSTRUCTION OTHER OPTIONAL EWO.HAZARD CONDIT OF FIREESCAPE BALCONIES @ EXP2 S ELEV. REMDY:IMMEDLY REPAIR FIREESCAPE BALCONIES.IMMEDLY PROVIDE AN APPROPRITE # CERTIFIED FIREGUARDS @ LOCAT 24/7 UNTIL REPAIRS ARE COMPLETE & SIGNED BY PE. PE TO PROVIDE INSPECTION REPORT ON ALL FIRE BALCONIES BEFORE WORK BEGIN REPORT SUBMIT TO FACADE@BUILDING.NYC.GOV. UNDR SUPERV OF NYS LICEN PE | - | V-DOB VIOLATION - ACTIVE | - | 3h2n-5cm9 |
| ECB summons issuedbuilding-scoped | 2025-01-06 | Construction 28-302.1 FAILURE TO MAINTAIN BLDG WALL(S) OR APPURTENANCES ECB #35689606P | CLASS - 1 | RESOLVE | $2,500 | 6bgk-3dad |
| DOB violation filedbuilding-scoped | 2024-11-07 | C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. OBSERVED AT EXPOSURE 4 SOUTH ELEVATION CRACK DETERIORATION AT 8TH FL EAST REMEDY: MAINTIAN BUILDING REPAIR AND/OR REPLACE | - | V-DOB VIOLATION - ACTIVE | - | 3h2n-5cm9 |
| ECB summons issuedbuilding-scoped | 2024-04-11 | Local Law 28-302.4 FAILURE TO SUBMIT A REQUIRED REPORT OF CRITICAL EXAMINATION DOCUMENTIN ECB #37028191R | CLASS - 2 | ACTIVE | $1,250 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2024-01-16 | Local Law 28-302.5 FAILURE TO FILE AN AMENDED REPORT ACCEPTABLE TO THIS DEPARTMENT INDICA ECB #37026135N | CLASS - 2 | ACTIVE | $3,125 | 6bgk-3dad |
Records are the union of DOB Violations (3h2n-5cm9), ECB (6bgk-3dad), Safety Violations (855j-jady), OATH Hearings (jz4z-kudi), and OATH Trials (y3hw-z6bm) that we could link back to this BBL via BIN or address parsing. Events not tagged LL97-specific are shown as building-scoped context. See methodology · enforcement linking.
Fields we cannot show here (internal DOB data not yet public)
Processing lifecycleDOB's internal BEAM system tracks per-building compliance stages, RCE / decarbonization plans, and mitigation credits. Those fields are not yet published as an open dataset. When DOB releases them, this product will show them here without a schema migration. Until then, the following are known gaps for this building:
- Simulated · internal DOB data not yet publicAssessed penalty (vs theoretical)Actual penalty DOB assessed against a building, distinct from the theoretical over-cap exposure computed from LL84 emissions.Best-effort shadow field:
ecb_summons_issuedPublic release status: announced_not_yet_released - Simulated · internal DOB data not yet publicAudit assignmentBuildings selected by DOB for LL97 filing audit and the audit stage.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicAudit outcomeResult of an LL97 audit (accepted / correction ordered / penalty referred).Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicExtension flagWhether a per-building filing was accepted under a filing extension (June 30 grace or BEAM extension to August 29).Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicFiling received dateTimestamp DOB received a per-building LL97 compliance filing.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicGood-faith effort applicationWhether an owner has applied for a good-faith effort determination and its status.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicMediated resolution applicationApplication for the LL97 mediated resolution process and its outcome.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicNotice of deficiency statusWhether a notice of deficiency has been issued for a building and its current stage.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicPer-building filing statusFiling status for each covered BBL/BIN combination (filed / late / non-filed / exempt) as tracked in DOB's BEAM system.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicPre-OATH correspondenceDOB correspondence with owners before an OATH matter is opened (notice of deficiency, cure letters).Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicRDP attestationRegistered Design Professional attestation attached to each per-building compliance filing.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicRECs / offsets claimedRenewable Energy Credits and beneficial-use offsets claimed to reduce reported emissions.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet public60-day cure windowThe 60-day cure window state for a building under LL97 enforcement (open / cured / expired).Public release status: announced_not_yet_released