NYC Prototypes
Skip to main content
BBL 4097580035 · BIN 4208865 · Queens · Block 09758, Lot 0035

89-20 161ST STREET

Article 321Pathway source: CBL PDF row · CP3_article_321_one_timeCBL revision date 2026-06-16Open CBL source PDF
Buildings on lot 1
← Buildings

Article 321 · prescriptive compliance pathway

This building is on the Article 321 pathway. Article 321 does not use a numerical cap; compliance is demonstrated via the prescriptive measures package (per methodology · Article 321), which DOB does not currently publish per building. Cap, delta, and penalty columns are intentionally suppressed on Article 321 rows in this product.

2024-29
Occupancy: R-2
GFA: 79,380 sqft
Methodology: v1.0
2030-34
Occupancy: R-2
GFA: 79,380 sqft
Methodology: v1.0

LL84 GHG emissions history

Actual tCO2e reported to LL84 by report year. Each bar links to the raw LL84 row identifier under the chart for auditability.

2021-2022343.1 tCO2e2023341.2 tCO2e2024327.5 tCO2e
YearProperty typeGHGProperty GFASite EUISource EUIES scoreSource
2021Multifamily Housing-79,380 sqft---7x5e-2fxh / 4842738
2022Multifamily Housing343.1 tCO2e79,380 sqft73.4100.6715zyy-y8am / 4842738
2023Multifamily Housing341.2 tCO2e79,380 sqft66.593.9705zyy-y8am / 4842738
2024Multifamily Housing327.5 tCO2e79,380 sqft62.788.3805zyy-y8am / 4842738

Enforcement events (all DOB + ECB + OATH data cross-linked to this BBL)

Open on enforcement page →
0 LL97-specific events · 31 building-scoped context events.
DOB violation filed0 LL97 · 1 scoped
ECB summons issued0 LL97 · 28 scoped
Safety context record0 LL97 · 2 scoped
StageEvent dateViolationSeverityStatusPenaltySource
DOB violation filedbuilding-scoped2026-01-15
C-CONSTRUCTION OTHER OPTIONAL
FTM BLDG IN A CODE COMPLIANT MANNER-OBSVD @ EXP1 A LOOSE/BULGING BRICK NEAR 5FL WINDOW LINTEL. ALSO OBSVD SEVERAL CRACKED WINDOW SILLS @ MULT LOCATIONS. OWNER TO IMMED RETAIN NYSPE TO EVAL ENTIRE BLDG&PREPARE/ FILE REPAIR DWGS. REPAIR BLDG UNDER PERMIT. START WORK BY 02/15/2026
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9
ECB summons issuedbuilding-scoped2025-12-01
Construction
28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER
ECB #39168755K
CLASS - 1ACTIVE$5,0006bgk-3dad
ECB summons issuedbuilding-scoped2025-11-24
Elevators
28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER: SERVICE EQUIPME
ECB #39168090P
CLASS - 1RESOLVE$1,2506bgk-3dad
Safety context recordbuilding-scoped2025-10-10
FTC-VT-PER-CO
Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction
-Active-855j-jady
Safety context recordbuilding-scoped2025-10-10
FTC-VT-PER-CO
Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction
-Active-855j-jady
ECB summons issuedbuilding-scoped2025-07-31
Construction
28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER
ECB #39155606Y
CLASS - 2ACTIVE$1,2506bgk-3dad
ECB summons issuedbuilding-scoped2025-07-31
Construction
28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER
ECB #39155605M
CLASS - 2ACTIVE$1,2506bgk-3dad
ECB summons issuedbuilding-scoped2025-07-31
Construction
AC 28-204.4 FAIL TO COMPLY W/COMMISSIONER ORDER TO FILE CERT OF CORRECTION W/DOB
ECB #39155607X
CLASS - 2ACTIVE$1,2506bgk-3dad
ECB summons issuedbuilding-scoped2025-06-30
Elevators
28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER: SERVICE EQUIPME
ECB #39152377X
CLASS - 1RESOLVE$1,2506bgk-3dad
ECB summons issuedbuilding-scoped2025-03-19
Elevators
28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER: SERVICE EQUIPME
ECB #39142218J
CLASS - 1RESOLVE$6,2506bgk-3dad
ECB summons issuedbuilding-scoped2025-02-04
Elevators
28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER: SERVICE EQUIPME
ECB #39137461N
CLASS - 1RESOLVE$1,2506bgk-3dad
ECB summons issuedbuilding-scoped2025-02-04
Elevators
28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER: SERVICE EQUIPME
ECB #39137460L
CLASS - 1RESOLVE$1,2506bgk-3dad
ECB summons issuedbuilding-scoped2025-01-22
Construction
28-105.1 WORK WITHOUT A PERMIT
ECB #39136181Y
CLASS - 2RESOLVE$1,2506bgk-3dad
ECB summons issuedbuilding-scoped2025-01-22
Construction
28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER
ECB #39136179P
CLASS - 2ACTIVE$6256bgk-3dad
ECB summons issuedbuilding-scoped2025-01-22
Construction
AC 28-204.4 FAIL TO COMPLY W/COMMISSIONER ORDER TO FILE CERT OF CORRECTION W/DOB
ECB #39136180M
CLASS - 2RESOLVE$1,2506bgk-3dad
ECB summons issuedbuilding-scoped2025-01-07
Unknown
EC 110.2(A) UNAPPROVED/UNSAFE/UNSUITABLE ELECTRICAL EQUIPMENT OR WIRING IN USE
ECB #39134796L
CLASS - 1RESOLVE$1,6006bgk-3dad
ECB summons issuedbuilding-scoped2024-10-02
Elevators
28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLAINT MANNER:SERVICE EQUIPMEN
ECB #39126426Y
CLASS - 2RESOLVE$3126bgk-3dad
ECB summons issuedbuilding-scoped2024-10-02
Elevators
28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER: SERVICE EQUIPME
ECB #39126427X
CLASS - 1RESOLVE$1,2506bgk-3dad
ECB summons issuedbuilding-scoped2024-08-09
Boilers
28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: SERVICE EQUIPME
ECB #39121354L
CLASS - 2RESOLVE$06bgk-3dad
ECB summons issuedbuilding-scoped2024-08-09
Elevators
28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER: SERVICE EQUIPME
ECB #39121388J
CLASS - 1RESOLVE$1,2506bgk-3dad
ECB summons issuedbuilding-scoped2024-08-07
Construction
28-207.4.4 REMOVED OR DEFACED A WRITTEN POSTED VACATE ORDER
ECB #39121150J
CLASS - 1RESOLVE$2,5006bgk-3dad
ECB summons issuedbuilding-scoped2024-08-02
Construction
28-118.3.2 OCC CONTRARY TO THAT ALLOWED BY THE C OF O OR DOB RECORDS
ECB #39120710Y
CLASS - 1RESOLVE$06bgk-3dad
ECB summons issuedbuilding-scoped2024-07-31
Construction
28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER
ECB #39120646Z
CLASS - 1RESOLVE$1,2506bgk-3dad
ECB summons issuedbuilding-scoped2024-07-31
Construction
28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER
ECB #39120643N
CLASS - 1ACTIVE$1,2506bgk-3dad
ECB summons issuedbuilding-scoped2024-07-31
Construction
28-105.1 WORK WITHOUT A PERMIT
ECB #39120650L
CLASS - 1RESOLVE$2,5006bgk-3dad
ECB summons issuedbuilding-scoped2024-07-31
Construction
28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER
ECB #39120639K
CLASS - 1RESOLVE$1,2506bgk-3dad
ECB summons issuedbuilding-scoped2024-07-31
Construction
28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER
ECB #39120638Z
CLASS - 1RESOLVE$1,2506bgk-3dad
ECB summons issuedbuilding-scoped2024-07-31
Construction
28-118.3.2 OCC CONTRARY TO THAT ALLOWED BY THE C OF O OR DOB RECORDS
ECB #35483290Y
CLASS - 1RESOLVE$2,5006bgk-3dad
ECB summons issuedbuilding-scoped2024-07-31
Construction
28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER
ECB #39120424N
CLASS - 1RESOLVE$1,2506bgk-3dad
ECB summons issuedbuilding-scoped2024-02-23
Elevators
28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER: SERVICE EQUIPME
ECB #39106740Y
CLASS - 1RESOLVE$6,2506bgk-3dad
ECB summons issuedbuilding-scoped2024-02-05
Elevators
28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLAINT MANNER:SERVICE EQUIPMEN
ECB #39105207L
CLASS - 2RESOLVE$1,5636bgk-3dad

Records are the union of DOB Violations (3h2n-5cm9), ECB (6bgk-3dad), Safety Violations (855j-jady), OATH Hearings (jz4z-kudi), and OATH Trials (y3hw-z6bm) that we could link back to this BBL via BIN or address parsing. Events not tagged LL97-specific are shown as building-scoped context. See methodology · enforcement linking.

Fields we cannot show here (internal DOB data not yet public)

Processing lifecycle

DOB's internal BEAM system tracks per-building compliance stages, RCE / decarbonization plans, and mitigation credits. Those fields are not yet published as an open dataset. When DOB releases them, this product will show them here without a schema migration. Until then, the following are known gaps for this building:

  • Assessed penalty (vs theoretical)
    Actual penalty DOB assessed against a building, distinct from the theoretical over-cap exposure computed from LL84 emissions.
    Simulated · internal DOB data not yet public
    Best-effort shadow field: ecb_summons_issued
    Public release status: announced_not_yet_released
  • Audit assignment
    Buildings selected by DOB for LL97 filing audit and the audit stage.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Audit outcome
    Result of an LL97 audit (accepted / correction ordered / penalty referred).
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Extension flag
    Whether a per-building filing was accepted under a filing extension (June 30 grace or BEAM extension to August 29).
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Filing received date
    Timestamp DOB received a per-building LL97 compliance filing.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Good-faith effort application
    Whether an owner has applied for a good-faith effort determination and its status.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Mediated resolution application
    Application for the LL97 mediated resolution process and its outcome.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Notice of deficiency status
    Whether a notice of deficiency has been issued for a building and its current stage.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Per-building filing status
    Filing status for each covered BBL/BIN combination (filed / late / non-filed / exempt) as tracked in DOB's BEAM system.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Pre-OATH correspondence
    DOB correspondence with owners before an OATH matter is opened (notice of deficiency, cure letters).
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • RDP attestation
    Registered Design Professional attestation attached to each per-building compliance filing.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • RECs / offsets claimed
    Renewable Energy Credits and beneficial-use offsets claimed to reduce reported emissions.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • 60-day cure window
    The 60-day cure window state for a building under LL97 enforcement (open / cured / expired).
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
Every number on this page traces back to a Socrata dataset row or a CBL PDF revision. Where DOB does not publish a computable field (pathway, internal BEAM stage, compliance decision), we say so on the record instead of hiding the gap. See methodology.