NYC Prototypes
Skip to main content
BBL 4097620049 · BIN 4616789 · Queens · Block 09762, Lot 0049

89 AVENUE

Article 320Pathway source: CBL PDF row · CP0_article_320_2024CBL revision date 2026-06-16Open CBL source PDF
Buildings on lot 1
← Buildings

Article 320 · numerical caps & computed exposure

How this is computed
PeriodOccupancyGFACapActualDeltaEst. penaltyStatusMethodology
2024-29R-2(high)55,400 sqft374 tCO2e0 tCO2e-374-
Under capEJ · PEJA fallback
v1.0
2030-34R-2(high)55,400 sqft225.5 tCO2e0 tCO2e-225.5-
Under capEJ · PEJA fallback
v1.0

Cap = Σ (occupancy_coefficient × gross_floor_area) using DOB LL97 rules; actual GHG is the most recent LL84 filing. Delta is positive when actual exceeds cap. Estimated penalty is DOB's public $268/tCO2e × delta with a 30-day grace applied via penalty_estimate_usd.

LL84 GHG emissions history

Actual tCO2e reported to LL84 by report year. Each bar links to the raw LL84 row identifier under the chart for auditability.

20240 tCO2e
YearProperty typeGHGProperty GFASite EUISource EUIES scoreSource
2024Multifamily Housing0 tCO2e55,400 sqft0.00.01005zyy-y8am / 65480093

Enforcement events (all DOB + ECB + OATH data cross-linked to this BBL)

Open on enforcement page →
0 LL97-specific events · 33 building-scoped context events.
ECB summons issued0 LL97 · 32 scoped
Safety context record0 LL97 · 1 scoped
StageEvent dateViolationSeverityStatusPenaltySource
ECB summons issuedbuilding-scoped2026-01-21
Unknown
27-3018(B) ELECTRICAL WORK WITHOUT A PERMIT
ECB #39549370Z
CLASS - 2RESOLVE$1,2506bgk-3dad
ECB summons issuedbuilding-scoped2026-01-21
Unknown
ECB #39549372M
CLASS - 1ACTIVE$2,5006bgk-3dad
ECB summons issuedbuilding-scoped2025-12-21
Unknown
ECB #39548322J
CLASS - 2ACTIVE$2,5006bgk-3dad
ECB summons issuedbuilding-scoped2025-08-22
Construction
BC 3303.4 & 27-1018 FAILURE TO MAINTAIN ADEQUATE HOUSEKEEPING PER SECTION REQUIREMENTS
ECB #39543979L
CLASS - 1ACTIVE$2,5006bgk-3dad
ECB summons issuedbuilding-scoped2025-06-25
Construction
28-105.12.2 WRK DOESN'T CONFORM TO APPROV DOCS AND/OR APPROV AMENDMENTS
ECB #39541714R
CLASS - 2RESOLVE$06bgk-3dad
ECB summons issuedbuilding-scoped2025-06-25
Construction
28-105.12.2 WRK DOESN'T CONFORM TO APPROV DOCS AND/OR APPROV AMENDMENTS
ECB #39541715Z
CLASS - 2RESOLVE$06bgk-3dad
ECB summons issuedbuilding-scoped2025-04-14
Unknown
ECB #39539050K
CLASS - 1ACTIVE$10,0006bgk-3dad
ECB summons issuedbuilding-scoped2025-02-14
Construction
BC 3301.2,27-1009(A) FAIL TO SAFEGUARD PERS/PROPERTY AFFECTED BY CONSTRUCTION OP
ECB #39537020K
CLASS - 2ACTIVE$5,0306bgk-3dad
ECB summons issuedbuilding-scoped2025-02-14
Unknown
ECB #39537018L
CLASS - 2ACTIVE$2,5306bgk-3dad
ECB summons issuedbuilding-scoped2025-02-14
Unknown
ECB #39537019N
CLASS - 1ACTIVE$10,0006bgk-3dad
ECB summons issuedbuilding-scoped2025-02-05
Construction
BC 3301.7 (2014 CODE) FAILURE TO MAINTAIN/DISPLAY ON SITE DOCUMENTS REQUIRED BY BC CHAPTER 3
ECB #39536674P
CLASS - 2RESOLVE$1,2506bgk-3dad
ECB summons issuedbuilding-scoped2025-02-05
Construction
28-105.12.2 WRK DOESN'T CONFORM TO APPROV DOCS AND/OR APPROV AMENDMENTS
ECB #39536675R
CLASS - 2RESOLVE$1,2506bgk-3dad
ECB summons issuedbuilding-scoped2025-02-04
Construction
BC 3301.2,27-1009(A) FAILURE TO INSTITUTE/MAINTAIN SAFETY EQUIPMENT MEASURES OR TEMPORARY
ECB #35689168Y
CLASS - 1RESOLVE$5,0006bgk-3dad
ECB summons issuedbuilding-scoped2025-02-04
Construction
27-/28-/BC-MISC MISCELLANEOUS VIOLATIONS
ECB #35689169X
CLASS - 1ACTIVE$12,5006bgk-3dad
Safety context recordbuilding-scoped2025-01-31
FTF-PL-PER
Cycle 1, Sub-cycle D (premises is in Community District 12)
-Active-855j-jady
ECB summons issuedbuilding-scoped2024-09-30
Construction
AC 28-204.4 FAIL TO COMPLY W/COMMISSIONER ORDER TO FILE CERT OF CORRECTION W/DOB
ECB #39532910J
CLASS - 2RESOLVE$1,2506bgk-3dad
ECB summons issuedbuilding-scoped2024-09-26
Construction
BC 105.8.2 TEMPORARY CONSTRUCTION EQUIPMENT ON SITE-EXPIRED PERMIT
ECB #39532788P
CLASS - 2ACTIVE$6,2506bgk-3dad
ECB summons issuedbuilding-scoped2024-09-26
Unknown
ECB #39532789R
CLASS - 2ACTIVE$10,0006bgk-3dad
ECB summons issuedbuilding-scoped2024-09-26
Construction
BC 3303.4 & 27-1018 FAILURE TO MAINTAIN ADEQUATE HOUSEKEEPING PER SECTION REQUIREMENTS
ECB #39532787N
CLASS - 1ACTIVE$12,5006bgk-3dad
ECB summons issuedbuilding-scoped2024-09-26
Unknown
ECB #39532786L
CLASS - 2ACTIVE$10,0006bgk-3dad
ECB summons issuedbuilding-scoped2024-08-18
Unknown
ECB #39531555J
CLASS - 2ACTIVE$2,5006bgk-3dad
ECB summons issuedbuilding-scoped2024-08-05
Construction
AC 28-204.4 FAIL TO COMPLY W/COMMISSIONER ORDER TO FILE CERT OF CORRECTION W/DOB
ECB #39531071N
CLASS - 2RESOLVE$3,1256bgk-3dad
ECB summons issuedbuilding-scoped2024-06-18
Construction
28-105.1 WORK WITHOUT A PERMIT
ECB #39529778Y
CLASS - 1ACTIVE$6,2506bgk-3dad
ECB summons issuedbuilding-scoped2024-06-18
Construction
BC 3301.2,27-1009(A) FAIL TO SAFEGUARD PERS/PROPERTY AFFECTED BY CONSTRUCTION OP
ECB #39529779X
CLASS - 2ACTIVE$5,0006bgk-3dad
ECB summons issuedbuilding-scoped2024-06-18
Construction
28-207.2.2 UNLAWFULLY CONTINUED WORK WHILE NOTICE OF A STOP WORK ORDER
ECB #39529782R
CLASS - 1ACTIVE$5,0006bgk-3dad
ECB summons issuedbuilding-scoped2024-05-31
Construction
28-105.1 WORK WITHOUT A PERMIT
ECB #39529158N
CLASS - 1ACTIVE$12,5006bgk-3dad
ECB summons issuedbuilding-scoped2024-05-31
Unknown
ECB #39529161Y
CLASS - 1ACTIVE$10,0006bgk-3dad
ECB summons issuedbuilding-scoped2024-04-23
Unknown
ECB #39527872L
CLASS - 2RESOLVE$5,0006bgk-3dad
ECB summons issuedbuilding-scoped2024-04-01
Unknown
ECB #39526997K
CLASS - 2RESOLVE$06bgk-3dad
ECB summons issuedbuilding-scoped2024-03-26
Unknown
ECB #39526800H
CLASS - 2ACTIVE$10,0006bgk-3dad
ECB summons issuedbuilding-scoped2024-02-01
Construction
AC 28-204.4 FAIL TO COMPLY W/COMMISSIONER ORDER TO FILE CERT OF CORRECTION W/DOB
ECB #39525289P
CLASS - 2RESOLVE$06bgk-3dad
ECB summons issuedbuilding-scoped2024-02-01
Construction
AC 28-204.4 FAIL TO COMPLY W/COMMISSIONER ORDER TO FILE CERT OF CORRECTION W/DOB
ECB #39525281K
CLASS - 2RESOLVE$06bgk-3dad
ECB summons issuedbuilding-scoped2024-01-26
Construction
AC 28-204.4 FAIL TO COMPLY W/COMMISSIONER ORDER TO FILE CERT OF CORRECTION W/DOB
ECB #39525151M
CLASS - 2RESOLVE$06bgk-3dad

Records are the union of DOB Violations (3h2n-5cm9), ECB (6bgk-3dad), Safety Violations (855j-jady), OATH Hearings (jz4z-kudi), and OATH Trials (y3hw-z6bm) that we could link back to this BBL via BIN or address parsing. Events not tagged LL97-specific are shown as building-scoped context. See methodology · enforcement linking.

Data quality flags

  • default_value_reportedSee methodology for the exact definition of this flag; behavior may vary by pathway or period.

Full flag catalog: methodology · data quality flags

Fields we cannot show here (internal DOB data not yet public)

Processing lifecycle

DOB's internal BEAM system tracks per-building compliance stages, RCE / decarbonization plans, and mitigation credits. Those fields are not yet published as an open dataset. When DOB releases them, this product will show them here without a schema migration. Until then, the following are known gaps for this building:

  • Assessed penalty (vs theoretical)
    Actual penalty DOB assessed against a building, distinct from the theoretical over-cap exposure computed from LL84 emissions.
    Simulated · internal DOB data not yet public
    Best-effort shadow field: ecb_summons_issued
    Public release status: announced_not_yet_released
  • Audit assignment
    Buildings selected by DOB for LL97 filing audit and the audit stage.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Audit outcome
    Result of an LL97 audit (accepted / correction ordered / penalty referred).
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Extension flag
    Whether a per-building filing was accepted under a filing extension (June 30 grace or BEAM extension to August 29).
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Filing received date
    Timestamp DOB received a per-building LL97 compliance filing.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Good-faith effort application
    Whether an owner has applied for a good-faith effort determination and its status.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Mediated resolution application
    Application for the LL97 mediated resolution process and its outcome.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Notice of deficiency status
    Whether a notice of deficiency has been issued for a building and its current stage.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Per-building filing status
    Filing status for each covered BBL/BIN combination (filed / late / non-filed / exempt) as tracked in DOB's BEAM system.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Pre-OATH correspondence
    DOB correspondence with owners before an OATH matter is opened (notice of deficiency, cure letters).
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • RDP attestation
    Registered Design Professional attestation attached to each per-building compliance filing.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • RECs / offsets claimed
    Renewable Energy Credits and beneficial-use offsets claimed to reduce reported emissions.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • 60-day cure window
    The 60-day cure window state for a building under LL97 enforcement (open / cured / expired).
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
Every number on this page traces back to a Socrata dataset row or a CBL PDF revision. Where DOB does not publish a computable field (pathway, internal BEAM stage, compliance decision), we say so on the record instead of hiding the gap. See methodology.