148-22 ARCHER AVENUE
CP0_article_320_2024CBL revision date 2026-06-16Open CBL source PDFArticle 320 · numerical caps & computed exposure
How this is computed| Period | Occupancy | GFA | Cap | Actual | Delta | Est. penalty | Status | Methodology |
|---|---|---|---|---|---|---|---|---|
| 2024-29 | R-1(high) | 203,782 sqft | 2,011.3 tCO2e | 1,115.3 tCO2e | -896 | - | Under capEJ · PEJA fallback | v1.0 |
| 2030-34 | R-1(high) | 203,782 sqft | 1,071.9 tCO2e | 1,115.3 tCO2e | +43.4 | $11,636 | Over capEJ · PEJA fallback | v1.0 |
Cap = Σ (occupancy_coefficient × gross_floor_area) using DOB LL97 rules; actual GHG is the most recent LL84 filing. Delta is positive when actual exceeds cap. Estimated penalty is DOB's public $268/tCO2e × delta with a 30-day grace applied via penalty_estimate_usd.
LL84 GHG emissions history
Actual tCO2e reported to LL84 by report year. Each bar links to the raw LL84 row identifier under the chart for auditability.
| Year | Property type | GHG | Property GFA | Site EUI | Source EUI | ES score | Source |
|---|---|---|---|---|---|---|---|
| 2023 | Hotel | 1,030.1 tCO2e | 203,782 sqft | 76.7 | 111.4 | 91 | 5zyy-y8am / 33963917 |
| 2024 | Hotel | 1,115.3 tCO2e | 203,782 sqft | 66.6 | 124.6 | 85 | 5zyy-y8am / 33963917 |
Enforcement events (all DOB + ECB + OATH data cross-linked to this BBL)
Open on enforcement page →| Stage | Event date | Violation | Severity | Status | Penalty | Source |
|---|---|---|---|---|---|---|
| Safety context recordbuilding-scoped | 2026-03-17 | FTC-AEU-HAZ | - | Dismissed | - | 855j-jady |
| ECB summons issuedbuilding-scoped | 2025-12-18 | Construction AC 28-204.4 FAIL TO COMPLY W/COMMISSIONER ORDER TO FILE CERT OF CORRECTION W/DOB ECB #39170913J | CLASS - 2 | RESOLVE | $1,250 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2025-12-18 | Construction AC 28-204.4 FAIL TO COMPLY W/COMMISSIONER ORDER TO FILE CERT OF CORRECTION W/DOB ECB #39170912H | CLASS - 2 | ACTIVE | $1,250 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2025-10-07 | Elevators 28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLAINT MANNER:SERVICE EQUIPMEN ECB #39162829R | CLASS - 2 | RESOLVE | $0 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2025-10-07 | Construction 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER ECB #39162868J | CLASS - 1 | RESOLVE | $2,500 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2025-10-07 | Elevators 28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLAINT MANNER:SERVICE EQUIPMEN ECB #39162830Y | CLASS - 2 | RESOLVE | $0 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2025-10-07 | Elevators 28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLAINT MANNER:SERVICE EQUIPMEN ECB #39162828P | CLASS - 2 | RESOLVE | $0 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2025-02-21 | Construction 27-371, BC 715.3.7 (2008 CODE) & BC 715.4.8 (2014 CODE) EXIT DOOR NOT SELF-CLOSING. ECB #39139134P | CLASS - 2 | RESOLVE | $625 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2025-02-20 | Unknown EC 590.4(J) FAILURE TO PROVIDE PROPER SUPPORT FOR TEMPORARY WIRING ECB #39139149H | CLASS - 1 | RESOLVE | $0 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2025-02-20 | Unknown EC 210.8 FAIL TO INSTALL GROUND-FAULT CIRCUIT INTERRUPTER (GFCI) PROTECTION ECB #39139148X | CLASS - 2 | RESOLVE | $0 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2025-02-20 | Construction 28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: NO FIRE STOPPIN ECB #39139133N | CLASS - 1 | RESOLVE | $2,500 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2025-02-20 | Unknown EC-MISC MICELLANEOUS VIOLATION OF ELECTRICAL CODE TECHNICAL STANDARDS ECB #39139154M | CLASS - 1 | RESOLVE | $1,600 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2025-02-20 | Unknown EC-MISC MISCELLANEOUS VIOLATION OF ELECTRICAL CODE TECHNICAL STANDARDS ECB #39139152Z | CLASS - 2 | ACTIVE | $800 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2025-02-20 | Construction 27-/28-/BC-MISC MISCELLANEOUS VIOLATIONS ECB #39139150P | CLASS - 1 | RESOLVE | $2,500 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2025-02-20 | Unknown EC 300.10 FAIL TO PROV EFF CONT METAL RACEWAYS/ENCLOSURES/CABLE ARMOR ECB #39139151R | CLASS - 2 | ACTIVE | $1,200 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2025-02-20 | Unknown EC 110.2(A) UNAPPROVED/UNSAFE/UNSUITABLE ELECTRICAL EQUIPMENT OR WIRING IN USE ECB #39139155Y | CLASS - 2 | ACTIVE | $800 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2025-02-20 | Construction 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER ECB #39139153K | CLASS - 1 | RESOLVE | $2,500 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2025-02-20 | Construction 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER ECB #39139135R | CLASS - 2 | RESOLVE | $1,250 | 6bgk-3dad |
| DOB violation filedbuilding-scoped | 2025-01-22 | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION | - | V*-DOB VIOLATION - DISMISSED | - | 3h2n-5cm9 |
| Safety context recordbuilding-scoped | 2025-01-22 | FTC-AEU-HAZ | - | Dismissed | - | 855j-jady |
| ECB summons issuedbuilding-scoped | 2024-10-01 | Construction AC 1RCNY-MISC,RS-MISC MISCELLANEOUS VIOLATIONS ECB #37030701K | CLASS - 1 | RESOLVE | $0 | 6bgk-3dad |
| DOB violation filedbuilding-scoped | 2024-09-23 | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION | - | V*-DOB VIOLATION - DISMISSED | - | 3h2n-5cm9 |
| DOB violation filedbuilding-scoped | 2024-09-23 | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION | - | V*-DOB VIOLATION - DISMISSED | - | 3h2n-5cm9 |
| DOB violation filedbuilding-scoped | 2024-09-23 | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION | - | V*-DOB VIOLATION - DISMISSED | - | 3h2n-5cm9 |
| Safety context recordbuilding-scoped | 2024-09-23 | LBLVIO Violation Issued-Failure To File 2023 External Low Pressure Inspection Report | - | Dismissed | - | 855j-jady |
| Safety context recordbuilding-scoped | 2024-09-23 | LBLVIO Violation Issued-Failure To File 2023 External Low Pressure Inspection Report | - | Dismissed | - | 855j-jady |
| Safety context recordbuilding-scoped | 2024-09-23 | LBLVIO Violation Issued-Failure To File 2023 External Low Pressure Inspection Report | - | Dismissed | - | 855j-jady |
Records are the union of DOB Violations (3h2n-5cm9), ECB (6bgk-3dad), Safety Violations (855j-jady), OATH Hearings (jz4z-kudi), and OATH Trials (y3hw-z6bm) that we could link back to this BBL via BIN or address parsing. Events not tagged LL97-specific are shown as building-scoped context. See methodology · enforcement linking.
Fields we cannot show here (internal DOB data not yet public)
Processing lifecycleDOB's internal BEAM system tracks per-building compliance stages, RCE / decarbonization plans, and mitigation credits. Those fields are not yet published as an open dataset. When DOB releases them, this product will show them here without a schema migration. Until then, the following are known gaps for this building:
- Simulated · internal DOB data not yet publicAssessed penalty (vs theoretical)Actual penalty DOB assessed against a building, distinct from the theoretical over-cap exposure computed from LL84 emissions.Best-effort shadow field:
ecb_summons_issuedPublic release status: announced_not_yet_released - Simulated · internal DOB data not yet publicAudit assignmentBuildings selected by DOB for LL97 filing audit and the audit stage.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicAudit outcomeResult of an LL97 audit (accepted / correction ordered / penalty referred).Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicExtension flagWhether a per-building filing was accepted under a filing extension (June 30 grace or BEAM extension to August 29).Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicFiling received dateTimestamp DOB received a per-building LL97 compliance filing.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicGood-faith effort applicationWhether an owner has applied for a good-faith effort determination and its status.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicMediated resolution applicationApplication for the LL97 mediated resolution process and its outcome.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicNotice of deficiency statusWhether a notice of deficiency has been issued for a building and its current stage.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicPer-building filing statusFiling status for each covered BBL/BIN combination (filed / late / non-filed / exempt) as tracked in DOB's BEAM system.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicPre-OATH correspondenceDOB correspondence with owners before an OATH matter is opened (notice of deficiency, cure letters).Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicRDP attestationRegistered Design Professional attestation attached to each per-building compliance filing.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicRECs / offsets claimedRenewable Energy Credits and beneficial-use offsets claimed to reduce reported emissions.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet public60-day cure windowThe 60-day cure window state for a building under LL97 enforcement (open / cured / expired).Public release status: announced_not_yet_released