95-25 WALTHAM STREET
CP0_article_320_2024CBL revision date 2026-06-16Open CBL source PDFArticle 320 · numerical caps & computed exposure
How this is computed| Period | Occupancy | GFA | Cap | Actual | Delta | Est. penalty | Status | Methodology |
|---|---|---|---|---|---|---|---|---|
| 2024-29 | - | - | - | - | - | - | UnresolvedEJ · PEJA fallback no_ll84_row | v1.0 |
| 2030-34 | - | - | - | - | - | - | UnresolvedEJ · PEJA fallback no_ll84_row | v1.0 |
Cap = Σ (occupancy_coefficient × gross_floor_area) using DOB LL97 rules; actual GHG is the most recent LL84 filing. Delta is positive when actual exceeds cap. Estimated penalty is DOB's public $268/tCO2e × delta with a 30-day grace applied via penalty_estimate_usd.
Enforcement events (all DOB + ECB + OATH data cross-linked to this BBL)
Open on enforcement page →| Stage | Event date | Violation | Severity | Status | Penalty | Source |
|---|---|---|---|---|---|---|
| Safety context recordbuilding-scoped | 2025-12-03 | FTF-EN-BENCH FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 | - | Dismissed | - | 855j-jady |
| Safety context recordbuilding-scoped | 2025-09-26 | FTF-EN-BENCH FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 | - | Dismissed | - | 855j-jady |
| Safety context recordbuilding-scoped | 2025-01-31 | FTF-PL-PER Cycle 1, Sub-cycle D (premises is in Community District 12) | - | Dismissed | - | 855j-jady |
| ECB summons issuedbuilding-scoped | 2024-11-21 | Construction 28-105.12.2 WRK DOESN'T CONFORM TO APPROV DOCS AND/OR APPROV AMENDMENTS ECB #39534575K | CLASS - 2 | RESOLVE | $0 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2024-11-13 | Unknown ECB #39534337P | CLASS - 1 | RESOLVE | $5,000 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2024-11-07 | Unknown ECB #39534222P | CLASS - 2 | RESOLVE | $2,500 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2024-11-07 | Construction 27-509,BC 3111.1 FENCE EXCEEDS PERMITTED HEIGHT ECB #39534221N | CLASS - 3 | RESOLVE | $0 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2024-11-07 | Construction BC 3307.6,27-1021 SIDEWALK SHED DOES NOT MEET CODE SPECIFICATIONS ECB #39534216Z | CLASS - 2 | RESOLVE | $2,400 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2024-10-03 | Construction BC 3303.4 & 27-1018 FAILURE TO MAINTAIN ADEQUATE HOUSEKEEPING PER SECTION REQUIREMENTS ECB #39533067J | CLASS - 1 | RESOLVE | $2,500 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2024-10-03 | Unknown ECB #39533070K | CLASS - 2 | RESOLVE | $2,500 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2024-10-03 | Construction BC 3307.6,27-1021 SIDEWALK SHED DOES NOT MEET CODE SPECIFICATIONS ECB #39533071M | CLASS - 2 | RESOLVE | $2,400 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2024-10-03 | Unknown ECB #39533069N | CLASS - 2 | RESOLVE | $0 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2024-10-03 | Unknown ECB #39533068L | CLASS - 2 | RESOLVE | $2,500 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2024-06-28 | Unknown ECB #39530109P | CLASS - 1 | RESOLVE | $5,000 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2024-06-28 | Construction BC 3303.4 & 27-1018 FAILURE TO MAINTAIN ADEQUATE HOUSEKEEPING PER SECTION REQUIREMENTS ECB #39530108N | CLASS - 1 | RESOLVE | $2,500 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2024-06-28 | Construction BC 3310.5,27-1009(D) FAIL TO HAVE SITE SAFETY MGR/COORDINATOR PRESENT AS REQUIRED ECB #39530099K | CLASS - 1 | RESOLVE | $10,000 | 6bgk-3dad |
| DOB violation filedbuilding-scoped | 2024-05-15 | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION | - | V*-DOB VIOLATION - DISMISSED | - | 3h2n-5cm9 |
| Safety context recordbuilding-scoped | 2024-05-15 | FTC-AEU-HAZ | - | Dismissed | - | 855j-jady |
| ECB summons issuedbuilding-scoped | 2024-04-05 | Construction BC 3301.2,27-1009(A) FAIL TO SAFEGUARD PERS/PROPERTY AFFECTED BY CONSTRUCTION OP ECB #39527152N | CLASS - 2 | RESOLVE | $0 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2024-04-01 | Construction 28-105.12.2 WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR APPROV ECB #39527007R | CLASS - 1 | RESOLVE | $0 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2024-03-01 | Unknown ECB #39526052L | CLASS - 2 | RESOLVE | $0 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2024-03-01 | Unknown ECB #39526063R | CLASS - 2 | RESOLVE | $0 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2024-03-01 | Unknown ECB #39526054P | CLASS - 2 | RESOLVE | $0 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2024-03-01 | Construction BC 3301.2,27-1009(A) FAILURE TO INSTITUTE/MAINTAIN SAFETY EQUIPMENT MEASURES OR TEMPORARY ECB #39526060L | CLASS - 1 | RESOLVE | $5,000 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2024-03-01 | Construction BC 3301.2,27-1009(A) FAIL TO SAFEGUARD PERS/PROPERTY AFFECTED BY CONSTRUCTION OP ECB #39526058M | CLASS - 1 | RESOLVE | $10,000 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2024-03-01 | Construction BC 3303.4,27-1018 FAIL TO MAINTAIN ADEQUATE HSEKEEPING PER SECTIONS REQUIREMENTS ECB #39526062P | CLASS - 2 | RESOLVE | $1,250 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2024-03-01 | Unknown ECB #39526067Y | CLASS - 2 | RESOLVE | $0 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2024-02-06 | Construction 28-105.12.2 WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR APPROV ECB #39525390J | CLASS - 1 | RESOLVE | $2,500 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2024-02-06 | Construction BC 3303.4 & 27-1018 FAILURE TO MAINTAIN ADEQUATE HOUSEKEEPING PER SECTION REQUIREMENTS ECB #39525392N | CLASS - 1 | RESOLVE | $2,500 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2024-02-06 | Unknown ECB #39525393P | CLASS - 2 | RESOLVE | $0 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2024-02-06 | Construction BC 3301.2,27-1009(A) FAILURE TO INSTITUTE/MAINTAIN SAFETY EQUIPMENT MEASURES OR TEMPORARY ECB #39525391L | CLASS - 1 | RESOLVE | $5,000 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2024-01-26 | Construction BC 3307.6,27-1021 SIDEWALK SHED DOES NOT MEET CODE SPECIFICATIONS ECB #39525129X | CLASS - 1 | RESOLVE | $2,400 | 6bgk-3dad |
Records are the union of DOB Violations (3h2n-5cm9), ECB (6bgk-3dad), Safety Violations (855j-jady), OATH Hearings (jz4z-kudi), and OATH Trials (y3hw-z6bm) that we could link back to this BBL via BIN or address parsing. Events not tagged LL97-specific are shown as building-scoped context. See methodology · enforcement linking.
Fields we cannot show here (internal DOB data not yet public)
Processing lifecycleDOB's internal BEAM system tracks per-building compliance stages, RCE / decarbonization plans, and mitigation credits. Those fields are not yet published as an open dataset. When DOB releases them, this product will show them here without a schema migration. Until then, the following are known gaps for this building:
- Simulated · internal DOB data not yet publicAssessed penalty (vs theoretical)Actual penalty DOB assessed against a building, distinct from the theoretical over-cap exposure computed from LL84 emissions.Best-effort shadow field:
ecb_summons_issuedPublic release status: announced_not_yet_released - Simulated · internal DOB data not yet publicAudit assignmentBuildings selected by DOB for LL97 filing audit and the audit stage.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicAudit outcomeResult of an LL97 audit (accepted / correction ordered / penalty referred).Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicExtension flagWhether a per-building filing was accepted under a filing extension (June 30 grace or BEAM extension to August 29).Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicFiling received dateTimestamp DOB received a per-building LL97 compliance filing.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicGood-faith effort applicationWhether an owner has applied for a good-faith effort determination and its status.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicMediated resolution applicationApplication for the LL97 mediated resolution process and its outcome.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicNotice of deficiency statusWhether a notice of deficiency has been issued for a building and its current stage.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicPer-building filing statusFiling status for each covered BBL/BIN combination (filed / late / non-filed / exempt) as tracked in DOB's BEAM system.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicPre-OATH correspondenceDOB correspondence with owners before an OATH matter is opened (notice of deficiency, cure letters).Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicRDP attestationRegistered Design Professional attestation attached to each per-building compliance filing.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicRECs / offsets claimedRenewable Energy Credits and beneficial-use offsets claimed to reduce reported emissions.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet public60-day cure windowThe 60-day cure window state for a building under LL97 enforcement (open / cured / expired).Public release status: announced_not_yet_released