NYC Prototypes
Skip to main content
BBL 4114310015 · BIN 4434841 · Queens · Block 11431, Lot 0015

86-10 151ST AVENUE

Article 320Pathway source: CBL PDF row · CP0_article_320_2024CBL revision date 2026-06-16Open CBL source PDF
Buildings on lot 2
← Buildings

Article 320 · numerical caps & computed exposure

How this is computed
PeriodOccupancyGFACapActualDeltaEst. penaltyStatusMethodology
2024-29R-2(high)215,318 sqft1,453.4 tCO2e1,005.9 tCO2e-447.5-
Under cap
v1.0
2030-34R-2(high)215,318 sqft876.3 tCO2e1,005.9 tCO2e+129.5$34,713
Over cap
v1.0

Cap = Σ (occupancy_coefficient × gross_floor_area) using DOB LL97 rules; actual GHG is the most recent LL84 filing. Delta is positive when actual exceeds cap. Estimated penalty is DOB's public $268/tCO2e × delta with a 30-day grace applied via penalty_estimate_usd.

LL84 GHG emissions history

Actual tCO2e reported to LL84 by report year. Each bar links to the raw LL84 row identifier under the chart for auditability.

2021490.9 tCO2e2022518.7 tCO2e2023998.3 tCO2e20241,005.9 tCO2e
YearProperty typeGHGProperty GFASite EUISource EUIES scoreSource
2021Multifamily Housing490.9 tCO2e169,000 sqft46.286.71007x5e-2fxh / 6653235
2022Multifamily Housing518.7 tCO2e169,000 sqft45.584.11005zyy-y8am / 6653235
2023Multifamily Housing998.3 tCO2e169,000 sqft90.4129.7305zyy-y8am / 25764214
2024Multifamily Housing1,005.9 tCO2e215,318 sqft69.3100.8595zyy-y8am / 25764214

Enforcement events (all DOB + ECB + OATH data cross-linked to this BBL)

Open on enforcement page →
0 LL97-specific events · 8 building-scoped context events.
DOB violation filed0 LL97 · 4 scoped
Safety context record0 LL97 · 4 scoped
StageEvent dateViolationSeverityStatusPenaltySource
DOB violation filedbuilding-scoped2024-11-14
C-CONSTRUCTION OTHER OPTIONAL
STRUCTURE RENDERED NON-COMPLIANT. AT TIME OF INSPECTION OBSERVED AT 4TH,5TH AND 6TH FLOOR EXTENSIVE CHARRING OF BEAMS, WATER AND SMOKE DAMAGE THROUGHOUT. ROOF IS OPEN AND WINDOWS OUT. BUILDING ELECTRIC SERVICE HAS BEEN CUT. THESE HAZARDOUS CONDITIONS HAVE THEREFORE RENDERED THE ENTIRE BUILDING UNSAFE TO OCCUPY.
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9
DOB violation filedbuilding-scoped2024-11-14
C-CONSTRUCTION OTHER OPTIONAL
FAILURE TO MAINTAIN BLDG IN A SAFE CONDITION.BLDG SFFRD FIRE ON 11/14/24 FIRE DMG OCCURD@5THFL APTS 4D,4E,6D,6E,&ROOF ABOVE 6D,6E,6C PRTLLY OPEN/CLLPSD.WATER DMG THRUOUT C,D,E,N LINES@SOUTH WING.OWNR TO RTAIN NYSPE TO EVAL ENT BLDG&FILE RPAIR JOB(S)W/DOB BLDG TO PERM RPAIRD UNDR PRMT STRTNG BY 1/13/25&CMPLTD&SGND OFF W/LOC BY 2/28/2025
-V*-DOB VIOLATION - DISMISSED-3h2n-5cm9
DOB violation filedbuilding-scoped2024-11-14
C-CONSTRUCTION OTHER OPTIONAL
EMERGENCY WORK ORDER.DUE TO FIRE ON 11/14/24,FIRE DAMAGE OCCURRED@5TH FL APTS,4D,4E,& CONT'D UP PLUMBNG CHASE THRU 5D,53,6D,6E,&ROOF.JOISTS& FLRS FIRE DMGD@5THFL THRU ROOF.ROOF PRTLLY OPEN/CLLPSD.OWNR TO RTAIN NYSPE&GC TO IMMED 1.TEMP SHORE BLDG AS REQ'D.2.INSTLL TEMP ROOF W/ BARRICADES,3.TEMP PARTITIONS@2ND TO 7THFL
-V*-DOB VIOLATION - DISMISSED-3h2n-5cm9
Safety context recordbuilding-scoped2024-10-11
FTC-VT-CAT1-CO
Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction
-Active-855j-jady
Safety context recordbuilding-scoped2024-09-11
FTF-VT-PER-CO
Violation Issued-Failure To File 2023 Periodic Inspection Report
-Active-855j-jady
Safety context recordbuilding-scoped2024-09-11
FTF-VT-PER-CO
Violation Issued-Failure To File 2023 Periodic Inspection Report
-Active-855j-jady
Safety context recordbuilding-scoped2024-06-23
FTF-EN-EARCX
-Active-855j-jady
DOB violation filedbuilding-scoped2024-06-23
EARCX-FAILURE TO SUBMIT EER NONE
FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 IN 2023
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9

Records are the union of DOB Violations (3h2n-5cm9), ECB (6bgk-3dad), Safety Violations (855j-jady), OATH Hearings (jz4z-kudi), and OATH Trials (y3hw-z6bm) that we could link back to this BBL via BIN or address parsing. Events not tagged LL97-specific are shown as building-scoped context. See methodology · enforcement linking.

Fields we cannot show here (internal DOB data not yet public)

Processing lifecycle

DOB's internal BEAM system tracks per-building compliance stages, RCE / decarbonization plans, and mitigation credits. Those fields are not yet published as an open dataset. When DOB releases them, this product will show them here without a schema migration. Until then, the following are known gaps for this building:

  • Assessed penalty (vs theoretical)
    Actual penalty DOB assessed against a building, distinct from the theoretical over-cap exposure computed from LL84 emissions.
    Simulated · internal DOB data not yet public
    Best-effort shadow field: ecb_summons_issued
    Public release status: announced_not_yet_released
  • Audit assignment
    Buildings selected by DOB for LL97 filing audit and the audit stage.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Audit outcome
    Result of an LL97 audit (accepted / correction ordered / penalty referred).
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Extension flag
    Whether a per-building filing was accepted under a filing extension (June 30 grace or BEAM extension to August 29).
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Filing received date
    Timestamp DOB received a per-building LL97 compliance filing.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Good-faith effort application
    Whether an owner has applied for a good-faith effort determination and its status.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Mediated resolution application
    Application for the LL97 mediated resolution process and its outcome.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Notice of deficiency status
    Whether a notice of deficiency has been issued for a building and its current stage.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Per-building filing status
    Filing status for each covered BBL/BIN combination (filed / late / non-filed / exempt) as tracked in DOB's BEAM system.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Pre-OATH correspondence
    DOB correspondence with owners before an OATH matter is opened (notice of deficiency, cure letters).
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • RDP attestation
    Registered Design Professional attestation attached to each per-building compliance filing.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • RECs / offsets claimed
    Renewable Energy Credits and beneficial-use offsets claimed to reduce reported emissions.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • 60-day cure window
    The 60-day cure window state for a building under LL97 enforcement (open / cured / expired).
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
Every number on this page traces back to a Socrata dataset row or a CBL PDF revision. Where DOB does not publish a computable field (pathway, internal BEAM stage, compliance decision), we say so on the record instead of hiding the gap. See methodology.