NYC Prototypes
Skip to main content
BBL 4121370020 · BIN 4263211 · Queens · Block 12137, Lot 0020

153-90 ROCKAWAY BOULEVARD

Article 320Pathway source: CBL PDF row · CP0_article_320_2024CBL revision date 2026-06-16Open CBL source PDF
Buildings on lot 1
← Buildings

Article 320 · numerical caps & computed exposure

How this is computed
PeriodOccupancyGFACapActualDeltaEst. penaltyStatusMethodology
2024-29R-1(high)70,690 sqft697.7 tCO2e502.4 tCO2e-195.3-
Under capEJ · PEJA fallback
v1.0
2030-34R-1(high)70,690 sqft371.8 tCO2e502.4 tCO2e+130.6$34,996
Over capEJ · PEJA fallback
v1.0

Cap = Σ (occupancy_coefficient × gross_floor_area) using DOB LL97 rules; actual GHG is the most recent LL84 filing. Delta is positive when actual exceeds cap. Estimated penalty is DOB's public $268/tCO2e × delta with a 30-day grace applied via penalty_estimate_usd.

LL84 GHG emissions history

Actual tCO2e reported to LL84 by report year. Each bar links to the raw LL84 row identifier under the chart for auditability.

2021382.8 tCO2e2022533.7 tCO2e2023474.5 tCO2e2024502.4 tCO2e
YearProperty typeGHGProperty GFASite EUISource EUIES scoreSource
2021Hotel382.8 tCO2e70,690 sqft92.5139.8787x5e-2fxh / 6769224
2022Hotel533.7 tCO2e70,690 sqft124.5178.1545zyy-y8am / 6769224
2023Hotel474.5 tCO2e70,690 sqft96.4151.3695zyy-y8am / 6769224
2024Hotel502.4 tCO2e70,690 sqft102.3154.7345zyy-y8am / 58141293

Enforcement events (all DOB + ECB + OATH data cross-linked to this BBL)

Open on enforcement page →
0 LL97-specific events · 20 building-scoped context events.
DOB violation filed0 LL97 · 1 scoped
ECB summons issued0 LL97 · 14 scoped
Safety context record0 LL97 · 5 scoped
StageEvent dateViolationSeverityStatusPenaltySource
ECB summons issuedbuilding-scoped2026-06-15
Unknown
27-3018(B) ELECTRICAL WORK WITHOUT A PERMIT
ECB #39192597Y
CLASS - 1ACTIVE$2,5006bgk-3dad
ECB summons issuedbuilding-scoped2026-06-15
Unknown
EC 358.30 FAILURE TO PROPERLY SECURE/SUPPORT ELECTRICAL METALLIC TUBING (EMT)
ECB #39192599H
CLASS - 2ACTIVE$5006bgk-3dad
ECB summons issuedbuilding-scoped2026-06-15
Unknown
EC 110.2(A) UNAPPROVED/UNSAFE/UNSUITABLE ELECTRICAL EQUIPMENT OR WIRING IN USE
ECB #39192598X
CLASS - 2ACTIVE$8006bgk-3dad
ECB summons issuedbuilding-scoped2026-06-15
Construction
28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER
ECB #39192620N
CLASS - 1ACTIVE$2,5006bgk-3dad
ECB summons issuedbuilding-scoped2026-06-15
Elevators
28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER: SERVICE EQUIPME
ECB #39192629J
CLASS - 1ACTIVE$1,2506bgk-3dad
ECB summons issuedbuilding-scoped2026-06-15
Elevators
28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLAINT MANNER:SERVICE EQUIPMEN
ECB #39192630R
CLASS - 2ACTIVE$6256bgk-3dad
ECB summons issuedbuilding-scoped2026-06-15
Unknown
EC 110.25 ELECTRIACAL CLOSET NOT DEDICATEDE TO ELECTRICAL DISTRIBUTION EQUIP ONL
ECB #39192596M
CLASS - 1ACTIVE$1,2006bgk-3dad
Safety context recordbuilding-scoped2026-03-17
FTC-AEU-HAZ
-Active-855j-jady
Safety context recordbuilding-scoped2026-03-17
FTC-AEU-HAZ
-Dismissed-855j-jady
Safety context recordbuilding-scoped2026-03-17
FTC-AEU-HAZ
-Active-855j-jady
Safety context recordbuilding-scoped2026-03-17
FTC-AEU-HAZ
-Dismissed-855j-jady
ECB summons issuedbuilding-scoped2025-12-16
Construction
AC 28-204.4 FAIL TO COMPLY W/COMMISSIONER ORDER TO FILE CERT OF CORRECTION W/DOB
ECB #39170602M
CLASS - 2ACTIVE$6,2506bgk-3dad
ECB summons issuedbuilding-scoped2025-12-16
Construction
28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER
ECB #39170601K
CLASS - 1ACTIVE$25,0006bgk-3dad
ECB summons issuedbuilding-scoped2025-12-16
Construction
AC 28-204.4 FAIL TO COMPLY W/COMMISSIONER ORDER TO FILE CERT OF CORRECTION W/DOB
ECB #39170600Z
CLASS - 2ACTIVE$6,2506bgk-3dad
ECB summons issuedbuilding-scoped2025-06-20
Construction
27-369,BC 1020.2 FAIL TO PROVIDE UNOBSTRUCTED EXIT PASSAGEWAY
ECB #39151544J
CLASS - 1RESOLVE$1,2506bgk-3dad
ECB summons issuedbuilding-scoped2025-06-20
Construction
28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER
ECB #39151546N
CLASS - 1ACTIVE$2,5006bgk-3dad
ECB summons issuedbuilding-scoped2025-06-20
Construction
28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: NO FIRE STOPPIN
ECB #39151543H
CLASS - 1ACTIVE$1,2506bgk-3dad
ECB summons issuedbuilding-scoped2025-06-20
Construction
28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER
ECB #39151545L
CLASS - 1RESOLVE$1,2506bgk-3dad
Safety context recordbuilding-scoped2024-05-02
FTF-EN-BENCH
-Dismissed-855j-jady
DOB violation filedbuilding-scoped2024-05-02
BENCH-FAILURE TO BENCHMARK NONE
FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
-V*-DOB VIOLATION - DISMISSED-3h2n-5cm9

Records are the union of DOB Violations (3h2n-5cm9), ECB (6bgk-3dad), Safety Violations (855j-jady), OATH Hearings (jz4z-kudi), and OATH Trials (y3hw-z6bm) that we could link back to this BBL via BIN or address parsing. Events not tagged LL97-specific are shown as building-scoped context. See methodology · enforcement linking.

Data quality flags

  • default_value_reportedSee methodology for the exact definition of this flag; behavior may vary by pathway or period.

Full flag catalog: methodology · data quality flags

Fields we cannot show here (internal DOB data not yet public)

Processing lifecycle

DOB's internal BEAM system tracks per-building compliance stages, RCE / decarbonization plans, and mitigation credits. Those fields are not yet published as an open dataset. When DOB releases them, this product will show them here without a schema migration. Until then, the following are known gaps for this building:

  • Assessed penalty (vs theoretical)
    Actual penalty DOB assessed against a building, distinct from the theoretical over-cap exposure computed from LL84 emissions.
    Simulated · internal DOB data not yet public
    Best-effort shadow field: ecb_summons_issued
    Public release status: announced_not_yet_released
  • Audit assignment
    Buildings selected by DOB for LL97 filing audit and the audit stage.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Audit outcome
    Result of an LL97 audit (accepted / correction ordered / penalty referred).
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Extension flag
    Whether a per-building filing was accepted under a filing extension (June 30 grace or BEAM extension to August 29).
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Filing received date
    Timestamp DOB received a per-building LL97 compliance filing.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Good-faith effort application
    Whether an owner has applied for a good-faith effort determination and its status.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Mediated resolution application
    Application for the LL97 mediated resolution process and its outcome.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Notice of deficiency status
    Whether a notice of deficiency has been issued for a building and its current stage.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Per-building filing status
    Filing status for each covered BBL/BIN combination (filed / late / non-filed / exempt) as tracked in DOB's BEAM system.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Pre-OATH correspondence
    DOB correspondence with owners before an OATH matter is opened (notice of deficiency, cure letters).
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • RDP attestation
    Registered Design Professional attestation attached to each per-building compliance filing.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • RECs / offsets claimed
    Renewable Energy Credits and beneficial-use offsets claimed to reduce reported emissions.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • 60-day cure window
    The 60-day cure window state for a building under LL97 enforcement (open / cured / expired).
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
Every number on this page traces back to a Socrata dataset row or a CBL PDF revision. Where DOB does not publish a computable field (pathway, internal BEAM stage, compliance decision), we say so on the record instead of hiding the gap. See methodology.