PeriodOccupancyGFACapActualDeltaEst. penaltyStatusMethodology
2024-29R-2(high)7,842,590 sqft52,937 tCO2e67,901 tCO2e+14,964$4,010,249
Over capEJ · PEJA fallback
v1.0
2030-34R-2(high)7,842,590 sqft31,919 tCO2e67,901 tCO2e+35,982$9,643,111
Over capEJ · PEJA fallback
v1.0

Cap = Σ (occupancy_coefficient × gross_floor_area) using DOB LL97 rules; actual GHG is the most recent LL84 filing. Delta is positive when actual exceeds cap. Estimated penalty is DOB's public $268/tCO2e × delta with a 30-day grace applied via penalty_estimate_usd.

LL84 GHG emissions history

Actual tCO2e reported to LL84 by report year. Each bar links to the raw LL84 row identifier under the chart for auditability.

202156,057 tCO2e202267,040 tCO2e202367,901 tCO2e
YearProperty typeGHGProperty GFASite EUISource EUIES scoreSource
2021Multifamily Housing56,057 tCO2e7,842,590 sqft133.8140.4347x5e-2fxh / 4335594
2022Multifamily Housing67,040 tCO2e7,842,590 sqft159.6167.4165zyy-y8am / 4335594
2023Multifamily Housing67,901 tCO2e7,842,590 sqft162.5170.695zyy-y8am / 4335594

Enforcement events (all DOB + ECB + OATH data cross-linked to this BBL)

Open on enforcement page →
0 LL97-specific events · 81 building-scoped context events.
DOB violation filed0 LL97 · 32 scoped
ECB summons issued0 LL97 · 34 scoped
Safety context record0 LL97 · 15 scoped
StageEvent dateViolationSeverityStatusPenaltySource
ECB summons issuedbuilding-scoped2026-07-08
Elevators
28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER: SERVICE EQUIPME
ECB #39195248J
CLASS - 1ACTIVE$1,2506bgk-3dad
ECB summons issuedbuilding-scoped2026-05-28
Construction
BC 3307.6,27-1021 SIDEWALK SHED DOES NOT MEET CODE SPECIFICATIONS
ECB #39554736K
CLASS - 2ACTIVE$2,4006bgk-3dad
ECB summons issuedbuilding-scoped2026-04-23
Construction
28-116.2.4.2 FAIL TO CONDUCT/FILE A FINAL INSPECTION OF PERMITTED WORK WITH THE DEP
ECB #39185757Z
CLASS - 2ACTIVE$1,2806bgk-3dad
ECB summons issuedbuilding-scoped2026-03-20
Construction
28-116.2.4.2 FAIL TO CONDUCT/FILE A FINAL INSPECTION OF PERMITTED WORK WITH THE DEP
ECB #39181303X
CLASS - 2ACTIVE$1,2506bgk-3dad
ECB summons issuedbuilding-scoped2026-03-20
Construction
28-116.2.4.2 FAIL TO CONDUCT/FILE A FINAL INSPECTION OF PERMITTED WORK WITH THE DEP
ECB #39181236P
CLASS - 2ACTIVE$1,2506bgk-3dad
Safety context recordbuilding-scoped2026-03-17
FTC-AEU-HAZ
-Active-855j-jady
Safety context recordbuilding-scoped2026-03-17
FTC-AEU-HAZ
-Active-855j-jady
Safety context recordbuilding-scoped2026-03-17
FTC-AEU-HAZ
-Active-855j-jady
Safety context recordbuilding-scoped2026-03-17
FTC-AEU-HAZ
-Active-855j-jady
ECB summons issuedbuilding-scoped2026-01-02
Construction
28-302.1 FAILURE TO MAINTAIN BLDG WALL(S) OR APPURTENANCES
ECB #35717888H
CLASS - 1ACTIVE$5,0006bgk-3dad
ECB summons issuedbuilding-scoped2025-12-17
Unknown
ECB #35718274H
CLASS - 2RESOLVE$06bgk-3dad
DOB violation filedbuilding-scoped2025-12-15
C-CONSTRUCTION OTHER OPTIONAL
FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.AS NOTED AT THE TIME OF INSPECTION,I OBSERVED ON EXP1 SOUTH ELEV,SPALLED ROOF EAVE AT MULTIPLE LOCATIONS,CRACKED BALCONY GLASS RAILS ON 10TH FL.EXP2,SPALLIN G BALCONY SLAB ON 10TH FL.EXP3 & 4 SPALLING ROOF EAVE AT MULTIPLE LOCA TIONS.EXP4 SPALLING BALCONY SLAB.REMEDY:REPAIR AND/OR REPLACE DAMAGE
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9
ECB summons issuedbuilding-scoped2025-12-15
Unknown
ECB #35717886Y
CLASS - 2ACTIVE$6206bgk-3dad
ECB summons issuedbuilding-scoped2025-12-15
Unknown
ECB #35717887X
CLASS - 2ACTIVE$6206bgk-3dad
ECB summons issuedbuilding-scoped2025-12-15
Unknown
ECB #35717885M
CLASS - 2ACTIVE$6206bgk-3dad
ECB summons issuedbuilding-scoped2025-12-15
Unknown
ECB #35717884K
CLASS - 2RESOLVE$06bgk-3dad
DOB violation filedbuilding-scoped2025-12-15
C-CONSTRUCTION OTHER OPTIONAL
FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER.AS NOTED AT TH E TIME OF INSPECTION,I OBSERVED ON EXP1 EAST ELEV,SPALLING CONCRETE EA VE AT SEVERAL LOCATION,CRACKED BALCONY GLASS RAIL PANELS.EXP2 SOUTH EL EV SPALLING BALCONY SLAB,SPALLING EAVE.REMEDY:REPAIR AND/OR REPLACE DA MAGED EAVE AND CRACKED GLASS PANELS
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9
ECB summons issuedbuilding-scoped2025-12-15
Unknown
ECB #35717879X
CLASS - 2RESOLVE$06bgk-3dad
ECB summons issuedbuilding-scoped2025-12-15
Unknown
ECB #35717880N
CLASS - 2RESOLVE$06bgk-3dad
ECB summons issuedbuilding-scoped2025-09-12
Construction
28-302.1 FAILURE TO MAINTAIN BLDG WALL(S) OR APPURTENANCES
ECB #35694095Z
CLASS - 1ACTIVE$5,0006bgk-3dad
ECB summons issuedbuilding-scoped2025-09-10
Construction
28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER
ECB #39159959H
CLASS - 2ACTIVE$1,2506bgk-3dad
ECB summons issuedbuilding-scoped2025-07-03
Construction
28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER
ECB #39152837H
CLASS - 2RESOLVE$06bgk-3dad
ECB summons issuedbuilding-scoped2025-06-11
Construction
28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER
ECB #39150762N
CLASS - 2ACTIVE$6,2506bgk-3dad
ECB summons issuedbuilding-scoped2025-05-02
Construction
28-302.1 FAILURE TO MAINTAIN BLDG WALL(S) OR APPURTENANCES
ECB #35693782X
CLASS - 1ACTIVE$25,0006bgk-3dad
ECB summons issuedbuilding-scoped2025-05-02
Construction
28-302.1 FAILURE TO MAINTAIN BLDG WALL(S) OR APPURTENANCES
ECB #35693781Y
CLASS - 1ACTIVE$2,5006bgk-3dad
ECB summons issuedbuilding-scoped2025-04-14
Construction
28-302.1 FAILURE TO MAINTAIN BLDG WALL(S) OR APPURTENANCES
ECB #35716623H
CLASS - 1RESOLVE$06bgk-3dad
DOB violation filedbuilding-scoped2025-03-05
AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9
Safety context recordbuilding-scoped2025-03-05
FTC-AEU-HAZ
-Active-855j-jady
Safety context recordbuilding-scoped2025-03-05
FTC-AEU-HAZ
-Active-855j-jady
DOB violation filedbuilding-scoped2025-03-05
AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9
ECB summons issuedbuilding-scoped2025-01-02
Construction
28-302.1 FAILURE TO MAINTAIN BLDG WALL(S) OR APPURTENANCES
ECB #35689298M
CLASS - 1ACTIVE$2,5006bgk-3dad
DOB violation filedbuilding-scoped2024-12-11
AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9
DOB violation filedbuilding-scoped2024-12-11
C-CONSTRUCTION OTHER OPTIONAL
PARTIAL VACATE ORDER. VACATE FACADE BALCONIES DUE TO CRACKED GLASS RAILING @ TOWER B APT #7F & TOWER C APT #7D & 10D ALSO VACATE SET-BACK FIRST LVL BTW TOWER B & TOWER C AT WEST ELEV DUE TO LOOSE/CRACKED CON- RETE ABOVE. REMEDY: VACATE BALCONIES AT APT #7F AND 7D AND 10D ALSO SETBACK FIRST LVL ROOF @ WEST ELEV
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9
Safety context recordbuilding-scoped2024-12-11
FTC-AEU-HAZ
-Active-855j-jady
ECB summons issuedbuilding-scoped2024-12-05
Construction
28-201.1 UNLAWFUL ACTS. FAILURE TO COMPLY WITH AN ORDER OF THE COMMISSIONER
ECB #35686849X
CLASS - 1RESOLVE$06bgk-3dad
ECB summons issuedbuilding-scoped2024-12-05
Construction
28-302.1 FAILURE TO MAINTAIN BLDG WALL(S) OR APPURTENANCES
ECB #35686846K
CLASS - 1ACTIVE$2,5006bgk-3dad
ECB summons issuedbuilding-scoped2024-11-27
Construction
28-302.1 FAILURE TO MAINTAIN BLDG WALL(S) OR APPURTENANCES
ECB #35686847M
CLASS - 1ACTIVE$2,5006bgk-3dad
DOB violation filedbuilding-scoped2024-11-26
AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9
Safety context recordbuilding-scoped2024-11-26
FTC-AEU-HAZ
-Active-855j-jady
DOB violation filedbuilding-scoped2024-11-13
AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
-V*-DOB VIOLATION - DISMISSED-3h2n-5cm9
Safety context recordbuilding-scoped2024-11-13
FTC-AEU-HAZ
-Dismissed-855j-jady
Safety context recordbuilding-scoped2024-11-13
FTC-AEU-HAZ
-Dismissed-855j-jady
DOB violation filedbuilding-scoped2024-11-13
AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
-V*-DOB VIOLATION - DISMISSED-3h2n-5cm9
DOB violation filedbuilding-scoped2024-10-01
C-CONSTRUCTION OTHER OPTIONAL
PARTIAL VACATE ORDER DUE TO THE MISSING GLASS RAILINGS AT TOWER A - APT10A; TOWER B - APT12A AND TOWER C - APT 12E. REMEDY: FULLY VACATE BALCONIES FOR TOWER A - APT. 10A, TOWER B - APT. 12A AND TOWER C - APT 12E
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9
DOB violation filedbuilding-scoped2024-10-01
C-CONSTRUCTION OTHER OPTIONAL
PARTIAL VACATE ORDER DUE TO THE MISSING GLASS RAILINGS AT TOWER B APARTMENTS #S 12A, 7E AND 11E. REMEDY: FULLY VACATE BALCONIES FOR TOWER B APARTMENTS #12A, 7E AND 11E
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9
DOB violation filedbuilding-scoped2024-10-01
C-CONSTRUCTION OTHER OPTIONAL
PARTIAL VACATE ORDER DUE TO MISSING GLASS RAILINGS AT TOWER A - APT 4G, TOWER B - APT. 4G AND TOWER C - APT #10E. REMEDY: FULLY VACATE BALCONIES FOR TOWER A - APT. 4G, TOWER B - APT. 4G AND TOWER C - APT 10E
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9
DOB violation filedbuilding-scoped2024-09-26
C-CONSTRUCTION OTHER OPTIONAL
EMERGENCY WORK ORDER DUE TO DEFECTIVE FACADE. AT EXP 2 & 4 ELEVATION 8,12,26 MISSING BALCONY RAILING GLASS. AT EXP 1 ELEVATION 27 5FL OBSERVED BROKEN GLASS WINDOW. REMEDY:IMMEDIATELY PROVIDE SAFETY MEASUR TO SECURE/PROTECT THE PUBLIC AND REMOVE/REPAIR ANY BROKEN GLASS OR LOOSE MATERIALS AS PER IRCNY 103-04
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9
DOB violation filedbuilding-scoped2024-09-26
C-CONSTRUCTION OTHER OPTIONAL
EMERGENCY WORK ORDER DUE TO DEFECTIVE FACADE OBSERVED. AT EXP#2 AND 4 MISSING BALCONY RAILING GLASS AT MULTIPLE LOCATION. REMEDY: IMMEDIATELY PROVIDE SAFETY MEASURES TO SECURE/PROTECT THE PUBLIC AND REMOVE/REPAIR ANY BROKEN GLASS AND LOOSE MATERIALS AS PER IRCNY 103-04
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9
ECB summons issuedbuilding-scoped2024-09-26
Construction
28-302.1 FAILURE TO MAINTAIN BLDG WALL(S) OR APPURTENANCES
ECB #35686509J
CLASS - 1ACTIVE$2,5006bgk-3dad
DOB violation filedbuilding-scoped2024-09-26
C-CONSTRUCTION OTHER OPTIONAL
EMERGENCY WORK ORDER DUE TO DEFECTIVE FACADE OBSERVED:AT EXP#2 & 4 BROKEN/MISSING BALCONY RAILING GLASS AT MULTIPLE LOCATIONS. REMEDY: IMMEDIATELY PROVIDE SAFETY MEASURES TO SECURE/PROTECT THE PUBLIC AND REPAIR ANY BROKEN GLASS AND LOOSE MATERIALS AS PER IRCNY 103-04
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9
Safety context recordbuilding-scoped2024-09-12
FTC-AEU-HAZ
-Active-855j-jady
DOB violation filedbuilding-scoped2024-09-12
AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9
ECB summons issuedbuilding-scoped2024-09-11
Construction
28-302.1 FAILURE TO MAINTAIN BLDG WALL(S) OR APPURTENANCES
ECB #35686505M
CLASS - 1ACTIVE$1,2506bgk-3dad
ECB summons issuedbuilding-scoped2024-09-10
Construction
28-302.1 FAILURE TO MAINTAIN BLDG WALL(S) OR APPURTENANCES
ECB #35686504K
CLASS - 1ACTIVE$1,2506bgk-3dad
DOB violation filedbuilding-scoped2024-08-30
C-CONSTRUCTION OTHER OPTIONAL
PARTIAL VACATE ORDER. OBSERVED: CRACKED/SPALLING BALCONY SLABS AND BROKEN GLASS RAILINGS AT MULTIPLE LOCATIONS THROUGHOUT ENTIRE FACADE REMEDY: VACATE ALL FACADE BALCONIES
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9
ECB summons issuedbuilding-scoped2024-08-27
Construction
28-302.1 FAILURE TO MAINTAIN BLDG WALL(S) OR APPURTENANCES
ECB #35686119Y
CLASS - 1ACTIVE$2,5006bgk-3dad
DOB violation filedbuilding-scoped2024-08-27
C-CONSTRUCTION OTHER OPTIONAL
EMERGENCY WORK ORDER DUE TO DEFECTIVE FACADE AT EXP2 (SOUTH ELEVATION TOWER B LINE E) SPALLING/CRACKED CONCRETE SLAB @ ROOF LEVEL. ALSO BROKEN GLASS RAILING AT BALCONY MULTIPLE LOCATIONS. REMEDY: IMMEDIATELY PROVIDE SAFETY MEASURES AT EXP 2 & 4 SOUTH & NORTH ELEV TO SECURE/PROTECT THE PUBLIC & REMOVE ALL LOOSE MATERIALS
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9
DOB violation filedbuilding-scoped2024-07-29
C-CONSTRUCTION OTHER OPTIONAL
FAILURE TO MAINTAIN EXTERIOR WALL & APPURTENANCES DUE TO BUILDING FILING AS SWARMP CONDITION & QEWI RECOMMENDATION FOR COMPLETED REPAIR SWARMP CONDITION BY DATE 02/19/2027.REMEDY: THE OWNER HAS TO COMPLY & REPAID THE FACADES BY THE DATE THEY PROVIDED IN THE FISP REPORT (02/19/2027.)
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9
DOB violation filedbuilding-scoped2024-07-29
C-CONSTRUCTION OTHER OPTIONAL
FAILURE TO MAINTAIN EXTERIOR WALL & APPURTENANCES. DUE TO BUILDING FIX AS SWARMP CONDITION & QEWI RECOMMENDATIONS FOR COMPLETED REPAIR SWARMP CONDITION DATE BY 02/19/2027. REMEDY: THE OWNER HAS TO COMPLY AND REPAIR THE FACADES BY THE DATE THEY PROVIDED IN THE FISP REPORT (02/19/2027)
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9
DOB violation filedbuilding-scoped2024-07-29
C-CONSTRUCTION OTHER OPTIONAL
FAILURE TO MAINTAIN EXTERIOR WALL & APPURTENANCES. DUE TO BUILDING FILING AS SWARMP CONDITION & QEWI RECOMMENDATION FOR COMPLETED REPAIR SWARMP CONDITION DATE BY 02/19/2027. REMEDY: THE OWNER HAS TO COMPLY AND REPAIR THE FACADES BY THE DATE THEY PROVIDED IN THE FISP REPORT (02/19/2027)
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9
DOB violation filedbuilding-scoped2024-07-29
C-CONSTRUCTION OTHER OPTIONAL
FAILURE TO MAINTAIN EXTERIOR WALL & APPURTENANCES. DUE TO BUILDING FILING AS SWARMP CONDITION & QEWI RECOMMENATION FOR COMPLETED REPAIR SWARMP DONDITION DATE BY 02/19/2027.REMEDY: THE OWNER HAS TO COMPLY AND REPAIR THE FACADE BY THE DATE THEY PROVIDED IN THE FISP REPORT (02/19/2027)
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9
DOB violation filedbuilding-scoped2024-07-12
FISPHAZ-HAZARDOUS CONDITION (FACADE) FACADE REQUIRED
CYCLE 9A UNSAFE REPORT FILED
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9
Safety context recordbuilding-scoped2024-07-12
FISPHAZ
CYCLE 9A UNSAFE REPORT FILED
-Active-855j-jady
Safety context recordbuilding-scoped2024-06-26
FTC-AEU-HAZ
-Active-855j-jady
DOB violation filedbuilding-scoped2024-06-26
AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9
ECB summons issuedbuilding-scoped2024-06-14
Construction
28-302.1 FAILURE TO MAINTAIN BLDG WALL(S) OR APPURTENANCES
ECB #35685256X
CLASS - 1ACTIVE$2,5006bgk-3dad
ECB summons issuedbuilding-scoped2024-06-13
Construction
BC 3301.9,27-10009(C) FAIL TO PROVIDE/POST SIGN(S) AT JB SITE PURSUANT TO SUBSEC
ECB #39529573K
CLASS - 2RESOLVE$1,2506bgk-3dad
ECB summons issuedbuilding-scoped2024-05-31
Construction
28-302.1 FAILURE TO MAINTAIN BLDG WALL(S) OR APPURTENANCES
ECB #35685289M
CLASS - 2ACTIVE$6,2506bgk-3dad
DOB violation filedbuilding-scoped2024-05-15
AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9
Safety context recordbuilding-scoped2024-05-15
FTC-AEU-HAZ
-Active-855j-jady
DOB violation filedbuilding-scoped2024-05-14
FISPHAZ-HAZARDOUS CONDITION (FACADE) FACADE REQUIRED
CYCLE 9A UNSAFE REPORT FILED
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9
Safety context recordbuilding-scoped2024-05-14
FISPHAZ
CYCLE 9A UNSAFE REPORT FILED
-Active-855j-jady
ECB summons issuedbuilding-scoped2024-04-29
Unknown
28-105.1 FAILURE TO OBTAIN A TEMPORARY CONSTRUCTION PERMIT PRIOR TO INSTALLATIO
ECB #39528117M
CLASS - 2ACTIVE$1,2506bgk-3dad
DOB violation filedbuilding-scoped2024-03-19
C-CONSTRUCTION OTHER OPTIONAL
EMERGENCY WORK ORDER DUE TO DEFECTIVE FACADE AT THE TIME OF INSPECTION OBSERVED.MISSING METAL PARAPET RAILING AT THE ROOF LEVEL.REMEDY:IMMEID ATELY REPAIR PARAPET RAILING
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9
DOB violation filedbuilding-scoped2024-03-19
C-CONSTRUCTION OTHER OPTIONAL
PARTIAL VACATE ORDER 3/19/2024 OBSERVED CRACKED/SPALLED CONCRETE BALCO NY SLABS AT MULTIPLE LOCATIONS.THESE CONDITIONS HAVE THEREFORE MADE TH E ENTIRE BALCONIES UNABLE TO BE OCCUPIED.REMEDY:IMMEDIATELY VACATE ENT IRE BALCONIES
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9
DOB violation filedbuilding-scoped2024-03-19
C-CONSTRUCTION OTHER OPTIONAL
EMERGENCY WORK ORDER DUE TO COLLAPSING MASONRY BRICKS AT SOUTH ELEVATI ON EXPOSURE#4 BETWEEN SIXTH AND SEVENTH FLOORS.REMEDY:THE OWNER IS TO IMMEDIATELY PROVIDE SIDEWALK SHED AND SECURED FENCES AROUND ALL IMPACT ED AREAS
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9
DOB violation filedbuilding-scoped2024-03-19
C-CONSTRUCTION OTHER OPTIONAL
PARTIAL VACATE ORDER 3/19/2024 OBSERVED COLLAPSED MASONRY BRICK AND MO RTAR AT SOUTH ELEVATION EXP#4 AT BETWEEN 6TH AND 7TH FLOOR OVER SOUTH YARD.THESE CONDITIONS HAVE THEREFORE MADE THE SOUTH YARD UNABLE TO BE OCCUPIED EXCEPT IN EMERGENCY SITUATIONS.REMEDY:IMMEDIATELY VACATE ENTI RE SOUTH YARD
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9
ECB summons issuedbuilding-scoped2024-03-19
Construction
28-302.1 FAILURE TO MAINTAIN BLDG WALL(S) OR APPURTENANCES
ECB #35682452J
CLASS - 1ACTIVE$2,5006bgk-3dad
DOB violation filedbuilding-scoped2024-03-19
C-CONSTRUCTION OTHER OPTIONAL
FAILURE TO MAINTAIN FACADE.OBSERVED COLLAPSED MASONRY BRICKS AR SOUTH EXP#4 BETWEEN 6TH AND 7TH FLOOR.THE OWNER IS TO IMMEDIATELY RETAIN SER VICE OF REG DESIGN PRO WITH QEWI CERTIFICATION AND MASONRY BRICK FACAD E EXPERIENCE TO INSPECT & EVALUATE 100% HANDS ON.REMEDY:INSTALL PUBLIC PROTECTION.SUBMIT REPORT TO FACADES@BUILDINGS.NYC.GOV BY 4/15/2024
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9
ECB summons issuedbuilding-scoped2024-03-07
Construction
28-302.1 FAILURE TO MAINTAIN BLDG WALL(S) OR APPURTENANCES
ECB #39108072R
CLASS - 1ACTIVE$12,5006bgk-3dad
DOB violation filedbuilding-scoped2024-03-07
C-CONSTRUCTION OTHER OPTIONAL
FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER. AT TIME OF INSPECTION OBSERVED AT CORNER OF EXP. 3 AND 4 DISLODGED BRICKS (APPROX. 8'X 6')THAT HAVE FALLEN TO GRADE.
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9

Records are the union of DOB Violations (3h2n-5cm9), ECB (6bgk-3dad), Safety Violations (855j-jady), OATH Hearings (jz4z-kudi), and OATH Trials (y3hw-z6bm) that we could link back to this BBL via BIN or address parsing. Events not tagged LL97-specific are shown as building-scoped context. See methodology · enforcement linking.

Fields we cannot show here (internal DOB data not yet public)

Processing lifecycle

DOB's internal BEAM system tracks per-building compliance stages, RCE / decarbonization plans, and mitigation credits. Those fields are not yet published as an open dataset. When DOB releases them, this product will show them here without a schema migration. Until then, the following are known gaps for this building:

  • Assessed penalty (vs theoretical)
    Actual penalty DOB assessed against a building, distinct from the theoretical over-cap exposure computed from LL84 emissions.
    Simulated · internal DOB data not yet public
    Best-effort shadow field: ecb_summons_issued
    Public release status: announced_not_yet_released
  • Audit assignment
    Buildings selected by DOB for LL97 filing audit and the audit stage.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Audit outcome
    Result of an LL97 audit (accepted / correction ordered / penalty referred).
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Extension flag
    Whether a per-building filing was accepted under a filing extension (June 30 grace or BEAM extension to August 29).
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Filing received date
    Timestamp DOB received a per-building LL97 compliance filing.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Good-faith effort application
    Whether an owner has applied for a good-faith effort determination and its status.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Mediated resolution application
    Application for the LL97 mediated resolution process and its outcome.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Notice of deficiency status
    Whether a notice of deficiency has been issued for a building and its current stage.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Per-building filing status
    Filing status for each covered BBL/BIN combination (filed / late / non-filed / exempt) as tracked in DOB's BEAM system.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Pre-OATH correspondence
    DOB correspondence with owners before an OATH matter is opened (notice of deficiency, cure letters).
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • RDP attestation
    Registered Design Professional attestation attached to each per-building compliance filing.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • RECs / offsets claimed
    Renewable Energy Credits and beneficial-use offsets claimed to reduce reported emissions.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • 60-day cure window
    The 60-day cure window state for a building under LL97 enforcement (open / cured / expired).
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
Every number on this page traces back to a Socrata dataset row or a CBL PDF revision. Where DOB does not publish a computable field (pathway, internal BEAM stage, compliance decision), we say so on the record instead of hiding the gap. See methodology.