154-10 SOUTH CONDUIT AVENUE
CP0_article_320_2024CBL revision date 2026-06-16Open CBL source PDFArticle 320 · numerical caps & computed exposure
How this is computed| Period | Occupancy | GFA | Cap | Actual | Delta | Est. penalty | Status | Methodology |
|---|---|---|---|---|---|---|---|---|
| 2024-29 | R-1(high) | 40,734 sqft | 402 tCO2e | 209 tCO2e | -193.1 | - | Under capEJ · PEJA fallback | v1.0 |
| 2030-34 | R-1(high) | 40,734 sqft | 214.3 tCO2e | 209 tCO2e | -5.3 | - | Under capEJ · PEJA fallback | v1.0 |
Cap = Σ (occupancy_coefficient × gross_floor_area) using DOB LL97 rules; actual GHG is the most recent LL84 filing. Delta is positive when actual exceeds cap. Estimated penalty is DOB's public $268/tCO2e × delta with a 30-day grace applied via penalty_estimate_usd.
LL84 GHG emissions history
Actual tCO2e reported to LL84 by report year. Each bar links to the raw LL84 row identifier under the chart for auditability.
| Year | Property type | GHG | Property GFA | Site EUI | Source EUI | ES score | Source |
|---|---|---|---|---|---|---|---|
| 2021 | Hotel | 170.9 tCO2e | 40,734 sqft | 56.7 | 107.0 | 95 | 7x5e-2fxh / 9638706 |
| 2022 | Hotel | 176.1 tCO2e | 40,734 sqft | 54.4 | 103.9 | 96 | 5zyy-y8am / 9638706 |
| 2023 | Hotel | 209.8 tCO2e | 40,734 sqft | 56.4 | 107.0 | 71 | 5zyy-y8am / 30689034 |
| 2024 | Hotel | 209 tCO2e | 40,734 sqft | 53.8 | 104.2 | 74 | 5zyy-y8am / 30689034 |
Enforcement events (all DOB + ECB + OATH data cross-linked to this BBL)
Open on enforcement page →| Stage | Event date | Violation | Severity | Status | Penalty | Source |
|---|---|---|---|---|---|---|
| ECB summons issuedbuilding-scoped | 2026-02-17 | Construction AC 28-204.4 FAIL TO COMPLY W/COMMISSIONER ORDER TO FILE CERT OF CORRECTION W/DOB ECB #39177399H | CLASS - 2 | ACTIVE | $1,250 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2026-02-17 | Unknown EC 110.2(A) UNAPPROVED/UNSAFE/UNSUITABLE ELECTRICAL EQUIPMENT OR WIRING IN USE ECB #39177403L | CLASS - 1 | ACTIVE | $4,000 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2026-02-17 | Construction 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER ECB #39177402J | CLASS - 1 | ACTIVE | $6,250 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2026-02-17 | Construction 28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: NO FIRE STOPPIN ECB #39177400X | CLASS - 1 | ACTIVE | $6,250 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2026-02-17 | Construction 28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: USE OF PROHIBIT ECB #39177401H | CLASS - 1 | ACTIVE | $6,250 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2026-02-17 | Construction AC 28-204.4 FAIL TO COMPLY W/COMMISSIONER ORDER TO FILE CERT OF CORRECTION W/DOB ECB #39177404N | CLASS - 2 | ACTIVE | $1,250 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2025-11-10 | Construction 27-369,BC 1020.2 FAIL TO PROVIDE UNOBSTRUCTED EXIT PASSAGEWAY ECB #39166781P | CLASS - 1 | ACTIVE | $6,250 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2025-11-10 | Construction 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER ECB #39166782R | CLASS - 1 | ACTIVE | $12,500 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2025-11-10 | Construction 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER ECB #39166529N | CLASS - 2 | ACTIVE | $6,250 | 6bgk-3dad |
| DOB violation filedbuilding-scoped | 2024-12-01 | EGRADE-FAILURE TO POST ENERGY GRADE/SCORE NONE FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3 | - | V-DOB VIOLATION - ACTIVE | - | 3h2n-5cm9 |
| Safety context recordbuilding-scoped | 2024-12-01 | FTP-EN-EGRDEA | - | Active | - | 855j-jady |
| ECB summons issuedbuilding-scoped | 2024-10-30 | Unknown EC 110.2(A) UNAPPROVED/UNSAFE/UNSUITABLE ELECTRICAL EQUIPMENT OR WIRING IN USE ECB #39128987N | CLASS - 1 | ACTIVE | $8,000 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2024-10-30 | Unknown EC 250.64 FAIL TO INSTALL GROUNDING ELECTRODE CONDUCTOR AS PER SECTION ECB #39128988P | CLASS - 1 | ACTIVE | $24,000 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2024-10-30 | Construction 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER ECB #39128994L | CLASS - 1 | ACTIVE | $6,250 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2024-10-30 | Construction 27-369,BC 1020.2 FAIL TO PROVIDE UNOBSTRUCTED EXIT PASSAGEWAY ECB #39128985J | CLASS - 1 | ACTIVE | $6,250 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2024-10-30 | Construction 28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: NO FIRE STOPPIN ECB #39128982Y | CLASS - 1 | ACTIVE | $12,500 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2024-10-30 | Construction 28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: USE OF PROHIBIT ECB #39128983X | CLASS - 1 | ACTIVE | $6,250 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2024-10-30 | Construction 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER ECB #39128995N | CLASS - 2 | ACTIVE | $3,125 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2024-10-30 | Construction 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER ECB #39128992H | CLASS - 2 | ACTIVE | $3,125 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2024-10-30 | Construction 27-371, BC 715.3.7 (2008 CODE) & BC 715.4.8 (2014 CODE) EXIT DOOR NOT SELF-CLOSING. ECB #39128984H | CLASS - 2 | ACTIVE | $3,125 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2024-10-30 | Unknown EC 210.8 FAIL TO INSTALL GROUND-FAULT CIRCUIT INTERRUPTER (GFCI) PROTECTION ECB #39128986L | CLASS - 2 | ACTIVE | $10,000 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2024-10-30 | Construction 28-105.1 WORK WITHOUT A PERMIT ECB #39128993J | CLASS - 2 | ACTIVE | $1,250 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2024-01-08 | Plumbing 28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: LACK OF A SYSTE ECB #39102985Y | CLASS - 2 | RESOLVE | $625 | 6bgk-3dad |
Records are the union of DOB Violations (3h2n-5cm9), ECB (6bgk-3dad), Safety Violations (855j-jady), OATH Hearings (jz4z-kudi), and OATH Trials (y3hw-z6bm) that we could link back to this BBL via BIN or address parsing. Events not tagged LL97-specific are shown as building-scoped context. See methodology · enforcement linking.
Fields we cannot show here (internal DOB data not yet public)
Processing lifecycleDOB's internal BEAM system tracks per-building compliance stages, RCE / decarbonization plans, and mitigation credits. Those fields are not yet published as an open dataset. When DOB releases them, this product will show them here without a schema migration. Until then, the following are known gaps for this building:
- Simulated · internal DOB data not yet publicAssessed penalty (vs theoretical)Actual penalty DOB assessed against a building, distinct from the theoretical over-cap exposure computed from LL84 emissions.Best-effort shadow field:
ecb_summons_issuedPublic release status: announced_not_yet_released - Simulated · internal DOB data not yet publicAudit assignmentBuildings selected by DOB for LL97 filing audit and the audit stage.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicAudit outcomeResult of an LL97 audit (accepted / correction ordered / penalty referred).Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicExtension flagWhether a per-building filing was accepted under a filing extension (June 30 grace or BEAM extension to August 29).Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicFiling received dateTimestamp DOB received a per-building LL97 compliance filing.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicGood-faith effort applicationWhether an owner has applied for a good-faith effort determination and its status.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicMediated resolution applicationApplication for the LL97 mediated resolution process and its outcome.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicNotice of deficiency statusWhether a notice of deficiency has been issued for a building and its current stage.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicPer-building filing statusFiling status for each covered BBL/BIN combination (filed / late / non-filed / exempt) as tracked in DOB's BEAM system.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicPre-OATH correspondenceDOB correspondence with owners before an OATH matter is opened (notice of deficiency, cure letters).Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicRDP attestationRegistered Design Professional attestation attached to each per-building compliance filing.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicRECs / offsets claimedRenewable Energy Credits and beneficial-use offsets claimed to reduce reported emissions.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet public60-day cure windowThe 60-day cure window state for a building under LL97 enforcement (open / cured / expired).Public release status: announced_not_yet_released