NYC Prototypes
Skip to main content
BBL 4158100025 · BIN 4301620 · Queens · Block 15810, Lot 0025

19-25 SEAGIRT BOULEVARD

Article 321Pathway source: CBL PDF row · CP3_article_321_one_timeCBL revision date 2026-06-16Open CBL source PDF
Buildings on lot 1
← Buildings

Article 321 · prescriptive compliance pathway

This building is on the Article 321 pathway. Article 321 does not use a numerical cap; compliance is demonstrated via the prescriptive measures package (per methodology · Article 321), which DOB does not currently publish per building. Cap, delta, and penalty columns are intentionally suppressed on Article 321 rows in this product.

2024-29
Occupancy: R-2
GFA: 144,202 sqft
Methodology: v1.0
2030-34
Occupancy: R-2
GFA: 144,202 sqft
Methodology: v1.0

LL84 GHG emissions history

Actual tCO2e reported to LL84 by report year. Each bar links to the raw LL84 row identifier under the chart for auditability.

20212,686.4 tCO2e20222,931.7 tCO2e2023-20241,641.1 tCO2e
YearProperty typeGHGProperty GFASite EUISource EUIES scoreSource
2021Multifamily Housing2,686.4 tCO2e144,202 sqft343.4393.517x5e-2fxh / 21308457
2022Multifamily Housing2,931.7 tCO2e144,202 sqft372.4421.715zyy-y8am / 21308457
2023Multifamily Housing-144,202 sqft---5zyy-y8am / 21308457
2024Multifamily Housing1,641.1 tCO2e144,202 sqft192.5234.835zyy-y8am / 33935881

Enforcement events (all DOB + ECB + OATH data cross-linked to this BBL)

Open on enforcement page →
0 LL97-specific events · 18 building-scoped context events.
DOB violation filed0 LL97 · 9 scoped
ECB summons issued0 LL97 · 2 scoped
Safety context record0 LL97 · 7 scoped
StageEvent dateViolationSeverityStatusPenaltySource
DOB violation filedbuilding-scoped2025-05-07
FISPFCS-FAILURE TO CORRECT SWARMP CONDITIONS (FACADE) FACADE REQUIRED
CYCLE 9 FAILURE TO CORRECT SWARMP CONDITIONS
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9
Safety context recordbuilding-scoped2025-05-07
FISPFCS
CYCLE 9 FAILURE TO CORRECT SWARMP CONDITIONS
-Active-855j-jady
Safety context recordbuilding-scoped2025-01-07
FISPHAZ
CYCLE 9B UNSAFE REPORT FILED
-Active-855j-jady
DOB violation filedbuilding-scoped2025-01-07
FISPHAZ-HAZARDOUS CONDITION (FACADE) FACADE REQUIRED
CYCLE 9B UNSAFE REPORT FILED
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9
Safety context recordbuilding-scoped2024-09-23
LBLVIO
Violation Issued-Failure To File 2023 External Low Pressure Inspection Report
-Dismissed-855j-jady
Safety context recordbuilding-scoped2024-09-23
LBLVIO
Violation Issued-Failure To File 2023 External Low Pressure Inspection Report
-Dismissed-855j-jady
DOB violation filedbuilding-scoped2024-09-23
LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
-V*-DOB VIOLATION - DISMISSED-3h2n-5cm9
DOB violation filedbuilding-scoped2024-09-23
LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
-V*-DOB VIOLATION - DISMISSED-3h2n-5cm9
Safety context recordbuilding-scoped2024-09-23
LBLVIO
Violation Issued-Failure To File 2023 External Low Pressure Inspection Report
-Dismissed-855j-jady
DOB violation filedbuilding-scoped2024-09-23
LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
-V*-DOB VIOLATION - DISMISSED-3h2n-5cm9
DOB violation filedbuilding-scoped2024-09-18
AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9
Safety context recordbuilding-scoped2024-09-18
FTC-AEU-HAZ
-Active-855j-jady
DOB violation filedbuilding-scoped2024-07-30
IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL
REMEDY: ERECT SIDEWALK SHED
-V*-DOB VIOLATION - DISMISSED-3h2n-5cm9
DOB violation filedbuilding-scoped2024-07-19
C-CONSTRUCTION OTHER OPTIONAL
EMERGENCY WORK ORDER DUE TO DEFECTIVE FACADE AT ALL EXPOSURES, SPALLIN CONCRETE & SPALLING BRICK. REMEDY: IMMEDIATELY PROVIDE SAFETY MEASURES TO SECURE/PROTECT THE PUBLIC AND REMOVE/REPAIR ANY LOOSE MATERIALS AS PER IRCNY103-04
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9
ECB summons issuedbuilding-scoped2024-07-19
Construction
28-302.5 FAIL TO TAKE REQUIRED MEASURES TO SECURE PUBLIC SAFWTY-UNSAFE FACADE
ECB #35685262M
CLASS - 1ACTIVE$10,0006bgk-3dad
Safety context recordbuilding-scoped2024-06-23
FTF-EN-EARCX
-Dismissed-855j-jady
DOB violation filedbuilding-scoped2024-06-23
EARCX-FAILURE TO SUBMIT EER NONE
FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2023)
-V*-DOB VIOLATION - DISMISSED-3h2n-5cm9
ECB summons issuedbuilding-scoped2024-04-11
Local Law
28-302.4 FAILURE TO SUBMIT A REQUIRED REPORT OF CRITICAL EXAMINATION DOCUMENTIN
ECB #37028199L
CLASS - 2ACTIVE$1,2506bgk-3dad

Records are the union of DOB Violations (3h2n-5cm9), ECB (6bgk-3dad), Safety Violations (855j-jady), OATH Hearings (jz4z-kudi), and OATH Trials (y3hw-z6bm) that we could link back to this BBL via BIN or address parsing. Events not tagged LL97-specific are shown as building-scoped context. See methodology · enforcement linking.

Data quality flags

  • default_value_reportedSee methodology for the exact definition of this flag; behavior may vary by pathway or period.

Full flag catalog: methodology · data quality flags

Fields we cannot show here (internal DOB data not yet public)

Processing lifecycle

DOB's internal BEAM system tracks per-building compliance stages, RCE / decarbonization plans, and mitigation credits. Those fields are not yet published as an open dataset. When DOB releases them, this product will show them here without a schema migration. Until then, the following are known gaps for this building:

  • Assessed penalty (vs theoretical)
    Actual penalty DOB assessed against a building, distinct from the theoretical over-cap exposure computed from LL84 emissions.
    Simulated · internal DOB data not yet public
    Best-effort shadow field: ecb_summons_issued
    Public release status: announced_not_yet_released
  • Audit assignment
    Buildings selected by DOB for LL97 filing audit and the audit stage.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Audit outcome
    Result of an LL97 audit (accepted / correction ordered / penalty referred).
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Extension flag
    Whether a per-building filing was accepted under a filing extension (June 30 grace or BEAM extension to August 29).
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Filing received date
    Timestamp DOB received a per-building LL97 compliance filing.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Good-faith effort application
    Whether an owner has applied for a good-faith effort determination and its status.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Mediated resolution application
    Application for the LL97 mediated resolution process and its outcome.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Notice of deficiency status
    Whether a notice of deficiency has been issued for a building and its current stage.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Per-building filing status
    Filing status for each covered BBL/BIN combination (filed / late / non-filed / exempt) as tracked in DOB's BEAM system.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Pre-OATH correspondence
    DOB correspondence with owners before an OATH matter is opened (notice of deficiency, cure letters).
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • RDP attestation
    Registered Design Professional attestation attached to each per-building compliance filing.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • RECs / offsets claimed
    Renewable Energy Credits and beneficial-use offsets claimed to reduce reported emissions.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • 60-day cure window
    The 60-day cure window state for a building under LL97 enforcement (open / cured / expired).
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
Every number on this page traces back to a Socrata dataset row or a CBL PDF revision. Where DOB does not publish a computable field (pathway, internal BEAM stage, compliance decision), we say so on the record instead of hiding the gap. See methodology.